QinghaiWorkshop lifting cargo elevatorWhat are the specific installation steps
release time:2024-04-29 05:39:33
and if so, replace it immediately; secondly, check whether there is any sign of looseness at the connection between the oil pipe and the oil pipe,Qinghai3 ton fixed lifting cargo elevator, and if so, tighten it immediately to avoid lifting on the hydraulic lifting platform There is an oil spill in the process, which leads to accidents; what items need to be checked before using the hydraulic lifting platform? Cut off the power first to avoid tragedies such as electric leakage and electric shock)Ensure good power supply at the installation site, install a separate distribution box, and the leakage switch must meet the requirements for construction elevators when used in the distribution box. If the construction elevator installed is frequency conversion, the leakage switch should be adapted to the frequency converter when selecting the leakage switch .Qinghai,As long as we transport the lifting platformTake the measures that need to be taken during the transportation of the lifting platform in advance to prevent all possible problems, and then the difficulties will be solved. The above is the company's arrangement of the issues that need to be considered during the transportation of the elevator. These factors It is a factor that needs to be considered for every lifting platform. Therefore, we must try our best to be perfect and impeccable. For the failure problems that often occur in lifts and lifting platforms, many operators of the user units have no way to solve them. They must apply for a professional personnel to perform on-site repairs. However, the failures of the equipment cannot be fully repaired normally, and only some special measures can be taken to maintain the basic working performance of the equipment.The safety device of the guide rail hydraulic lifting platform The mechanical part of the guide rail hydraulic lifting platform mainly includes the hydraulic system and the mechanical device.Zahedan,What is the new price of a fixed lift? Professionally improve the quality assurance of the freight elevator factory. The preferential activities are in progress, and new and old customers are welcome to come to consult.Prepare the foundation according to the foundation plan, pay attention to the alignment, leveling, and alignment to ensure the level of the foundation and various requirements for use.Unscrew the screw on the dust-proof hole outside the flange of the elevator, adjust the PCS system ring to align the side hole with the dust-proof hole, and tighten the inner hexagon. After that, remove the motor shaft key.


QinghaiWorkshop lifting cargo elevatorWhat are the specific installation steps



Whether it is used outdoors or indoors, some small problems will inevitably appear after a long period of time. At this time, what we should do is to maintain and maintain the elevator. How to follow the steps correctly It has become a difficult problem, and I will answer it with you.What are the installation precautions for the elevator? The elevator folds the fence and the cage to clean the foundation surface, and installs the anchor bolts. The force-bearing surface between the large nut and the floor to reduce the impact of the nut on the floor; insert steel plate gaskets of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; install three standard sections and measure them with theodolite The verticality of the guide rail frame ensures the verticality of each supervisor of the guide rail frame in two directions. After the guide rail frame is adjusted vertically, and tighten the rest of the anchors. Bolts; install buffer springs; connect the other half of the fence to the front half with bolts; adjust the verticality as above, tighten the anchor bolts, and loosen the brake on the motor in the cage. (For SC/ type, first install the cage and then install the drive plate). All kinds of freight elevator factories have formal qualifications, welcome to inquire by phone, and sincerely invite cooperation!The parts such as reduction box,QinghaiLifting cargo elevator 1 ton, gearbox, external gear and hydraulic oil are all in accordance with the requirements in the table.Energy costs,Walking: assisted self-propelled, two-wheel traction self-driving, and car modified.The use of elevators is not to maintain and overhaul after the equipment fails. It is necessary to maintain the equipment according to the correct maintenance and overhaul, and start with the preparation work to prevent all possible failures and accidents. I hope that the editor can summarize the knowledge points today. Help everyone.Anti-corrosion measures for the body of aerial work vehicles Pay attention to small scratches. The paint surface of aerial work vehicles is often corroded. In addition to common collisions, scratches small rocks on the driving tires, there may also be a peeling paint spot, and a small rust will appear after a long time. Because most of these scars are small, they are easy to ignore. Therefore, check regularly, go to a professional beauty shop for processing.


QinghaiWorkshop lifting cargo elevatorWhat are the specific installation steps



This kind of fixed lifting equipment can also be used in the warehouse. For example and once found, a certain floor in the warehouse needs to be lifted to send goods or personnel into the designated warehouse.PromotionIt is strictly forbidden for personnel to take the freight elevator to go up and down floors and climb.Check whether the self-locking device of the differential protector is normal before working at heights.The motor connection is wrong. When the delta connection motor is wrongly connected into a star shape, the motor still runs with full load, and the current flowing through the stator winding will exceed the rated current, and even cause the motor to stop by itself. If it overheats,QinghaiHydraulic lifting cargo elevator, it will burn out. When the star-connected motor is wrongly connected into a triangle, or the motor with several coil groups connected in series to form a branch circuit is connected in parallel with two branches, it will cause the winding and core to overheat, and in severe cases, the winding will be burned.Qinghai,As for the guide rail elevator installed outdoors, it is often exposed to rain and sunlight, so special attention should be paid to regular maintenance and inspection to avoid accidents.Walking: assisted self-propelled, two-wheel traction, self-driving, and car modified.Regarding the cleanliness of the hydraulic station, is there any relevant rule requirement?


comment list
  • Sun Liusuo

    The boss is so kind, he really knows his job well. Under your guidance, I will soon become an expert! The seller's service is really attentive. Bring colleagues together in the future. Very good Qingh

  • Bamboo Speed ​​Cable Company

    After receiving the goods, I feel that the quality QinghaiWorkshop lifting cargo elevator is still relatively good, consistent with the seller’s description, very satisfied, the delivery speed is rela

  • Complete set of automation switch

    Great QinghaiWorkshop lifting cargo elevator, very good service, thank you.

  • Explosion-proof pipe fittings

    When QinghaiWorkshop lifting cargo elevator offer discount points for activities, contact me when there are discounts

  • Agricultural rock wool substrate

    After so many years of online shopping, this is the first time I have taken this seriously. I was holding my phone and staring at the screen with a sense of anxiety, and I dared not start. In order to

©2009-2024Metal Microblog  Sitemap