The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, attention should be paid to the length of the pit or the opening of the floor slab, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.The call button on each floor is no longer working, and the call is cut off.Hague,Factors to consider when choosing a household elevator: . Safety. Generally, brand elevators must have third-party testing, and elevators that have been inspected by professional organizations are safe, reliable, and guaranteed to be used with peace of mind. In addition, when choosing to purchase villa elevators, it is important to understand the safety components and configuration of this elevator. The essential safety equipment in the villa elevator includes a backup power supply and an emergency call outside telephone system to ensure the safety of private users on the elevator.During the use of elevators, some elevator users seek temporary workers or unqualified companies for elevator maintenance in order to reduce costs and save funds. Once safety issues arise, even the responsible unit cannot be found. If the maintenance is carried out by elevator manufacturers or qualified professional companies, on the one hand, the maintenance technology and quality are guaranteed, and on the other hand, if any problems occur someone is also responsible.Okrika,Measure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning,HagueAluminum alloy mast type lifting platform, and then measure the horizontal distance from the positioning point to the edge of the lower support beam.The household must make two steel splints above the entrance. The position and size of the clamp plate are determined based on the selected door machine model.Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.


HagueStage elevatorPay attention to the above precautions



The speed limiter tensioning device and the steel belt tensioning device should be equipped with a safety switch.Home elevators are different from public spaces, such as professional home elevators, villa home elevators, home elevator manufacturers, small home elevators, and other special products. Old brands have advantages in price and guaranteed quality. Considering the limited installation space, lack of dedicated hoistways, and small lifting height,HagueFixed stage elevator, the design pursues simplicity and miniaturization, and the existence of computer rooms is not necessary. Long term promotion of home elevator manufacturers, old brands price advantages, and guaranteed quality!When the normal power supply is cut off, the lighting inside the non fire elevator has no power, while there is still lighting inside the fire elevator.Fair price,Electrical components are roughly divided into screens, electrical switches for each safety circuit, etc. It is the brain of the elevator and the central nervous system of the elevator. The movement, operation, so it must be treated as a top priority in daily maintenance work. Do not short circuit the elevator circuit inside the screen during work. When the elevator door system malfunctions, someone shorts the elevator door for convenience in order to find the fault. This is very dangerous, and there are many accidents when shorting the door. Why? If a person opens the hall door and extends their head inward, the elevator happens to run up or down to this point, and the hall door is shorted, the elevator cannot stop, so an accident is highly likely to occur. So in our daily maintenance work, we must not short-circuit the safety circuit. If it is necessary to short-circuit, we must identify which safety component has a problem and which safety component needs to be shorted. Moreover, after maintenance or urgent repairs are completed, we must promptly remove the short-circuit wire. Professional household elevator manufacturer, waterproof, high-temperature resistant sturdy and durable, safe and reliableThe compensation chain and rope shall not collide with the shaft or other components during the operation of the elevator.In the event of a fire, when instructed by the fire center or the dedicated operation button of the first floor firefighter to enter the firefighting state, the elevator should immediately stop on the floor without opening the door, return to the first floor station, and automatically open the elevator door if it is in the upward direction.


HagueStage elevatorPay attention to the above precautions



For escalators that require intermediate support, it is necessary to determine whether the site has the conditions for adding support, as well as the range of support that can be added, the height and load size of the equipment and support platform, and other parameters.Quality assurance,Multiple elevator shafts can be connected and an - # I-beam can be fixed at a certain height between each adjacent elevator shaft, with the same position as the ring beam. The pit must be equipped with an isolation net that is mm above the ground level.. Different types of civil engineering traction elevators, screw elevators and hydraulic elevators have different requirements for civil engineering. Common traction elevators require a certain amount of hoistway space, which can be made of concrete,HagueAluminum alloy mobile lifting platform, steel structure hoistways, and glass curtain walls to create sightseeing elevators; The depth of the pit should be at least cm or more; Additionally, there are certain requirements for the height of the top floor.Measure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning, and then measure the horizontal distance from the positioning point to the edge of the lower support beam.Hague,In the event of a fire, when instructed by the fire center or the dedicated operation button of the first floor firefighter to enter the firefighting state, the elevator should immediately stop on the floor without opening the door, and automatically open the elevator door if it is in the upward direction.b. When the old elevator cannot start: due to the inability to enter the shaft, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.b. When the old elevator cannot start: due to the inability to enter the shaft, limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, the plane size of the shaft can be measured in the machine room, but it is not accurate enough) for elevator quotation negotiation reference. In this case the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.


comment list
©2009-2024Metal Microblog  Sitemap