BerlinLeverkusenQuality record control procedures
release time:2024-03-28 17:22:46

Acceptance: Concrete strength grade C, strength testing report.Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results, and report any problems found to the user unit.Berlin,If the set screw is loose, be sure to pin it tightly to prevent accidents caused by the shaft pin falling off. Hydraulic oil should be kept clean and replaced every months.High lifting height, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.Nefta,Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.Acceptance: Concrete strength grade C, strength testing report.Work is essential, guardrails, protective covers, platforms and stairs, etc.


BerlinLeverkusenQuality record control procedures



The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.The body in the lateral adjustment device of the driving plate should ensure a compressed state, so that the gear has a certain radial constraint, and ensure that the gear and rack always mesh well throughout the entire operation.Installation verticality deviation guide rail frame erection height, h/mH≤ H& gt; verticality deviation/mm≤ (/h≤ ≤ ≤ ≤ pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (/) h.supply,According to the needs of different performance genres, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, using a lift can make the theater have various forms such as an end stage, an extended stage, an island stage, an intermediate stage, a T-shaped stage, or a hall.Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position,BerlinPescara, the hydraulic ground should be - millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel,BerlinBordeaux, it should be replaced in a timely manner ( # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.According to the needs of different performance genres, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, using a lift can make the theater have various forms such as an end stage, an extended stage, an island stage, an intermediate stage a T-shaped stage, or a hall.


BerlinLeverkusenQuality record control procedures



The use of a lifting platform as a tool for storing performance blankets, there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets,BerlinSilmhantan, soft scenery, etc.Design brand,Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform and the lifting of goods should try to maintain a stable and uniform speed.The water cooling of hydraulic stations is generally tubular water cooling. The selection is based on the heat load to calculate the heat exchange area, the selection calculation is carried out under the condition of satisfying the flow rate. So while the air-cooled electric elevator uses an air cooler to calculate the heat exchange capacity based on the heat load. Then, these two types of cooling are different and have significant differences.Secondly, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.Berlin,Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.The setting of the cable guide frame should comply with the user manual and regulatory requirements.Horizontal lead screw mechanical electricity


comment list
©2009-2024Metal Microblog  Sitemap