New CityFolding boarding bridgeDesign advantages
release time:2024-04-10 13:58:46

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.There is a lot of noise generated when using a mobile hydraulic boarding bridge. So, where are these noises caused? In fact, pump stations, steel cylinders, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations. After hearing the noise from the hydraulic boarding bridge and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, first check if there are any problems with the hydraulic pump station, motor, and if the noise is caused by its vibration.New CityCheck the hydraulic oil quality and level. When the lifting platform is raised to a high position, the hydraulic oil level should be - millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged, it should be replaced immediately; When there is looseness in the connection part, tighten the pipe joint.There are three movable boards on both sides of the air conditioning board,New CityMobile boarding bridge, which can effectively prevent the adjustment board from falling down and keep the pressure foot in a safe state.Puyo,During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found construction must be suspended and reported to the superior for handling.It is strictly prohibited to apply excessive pile loads around the foundation pit.The safety valve of the mobile hydraulic boarding bridge can also generate high noise. When air is mixed into hydraulic oil, the relief valve gets stuck or severely worn, and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, and replace it if it is damaged or severely worn.


New CityFolding boarding bridgeDesign advantages



Common&quo; Streamline” Open joint planning, with a welding area more than three times that of other traditional pipeline joints, greatly extending the service life and protection life.Maintain the hydraulic system of the hydraulic boarding bridge. Keep the hydraulic oil of the hydraulic boarding bridge clean: Store the oil in a clean location, and be careful when changing or refueling. Only use a cleaning funnel equipped with a fine mesh filter to pour oil from the container into the oil tank. Of course, the oil you use should be the type recommended by the equipment manufacturer.The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.Product survey,Do you know some of the working characteristics of hydraulic lifting boarding bridges? Today, I will take you to understand!Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, surface, and foot of the slope, especially for the simple boarding bridge.Common&quo; Work” Steel structure planning can withstand uniform pressure, reduce skeleton torque, and be more robust than other channel structures.


New CityFolding boarding bridgeDesign advantages



When replacing hydraulic oil, sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge, as well as noise when the pump station enters the air.Inspection items,It is strictly prohibited to apply excessive pile loads around the foundation pit.In the economic field, the safety, punctuality, flexibility,New CityRetractable boarding bridge, and price to efficiency ratio of transportation are directly related to the fate and survival of enterprises due to different road conditions. Therefore, people have high expectations for commercial freight hydraulic boarding bridges, especially those that serve as the main components of trailers and semi trailers. Continuously developing, developing, and producing multiple series and varieties of hydraulic boarding bridges to meet the needs of modern cargo transportation. Below is an introduction to the characteristics of the hydraulic boarding bridge suspension system.The correct operation of the hydraulic boarding bridge is good maintenance, and how to operate it correctly. Let me briefly introduce the operating steps of the hydraulic boarding bridge, hoping to bring more help to everyone.New City,During excavation, if unidentifiable items or unforeseeable situations are found, the operation should be stopped in a timely manner and reported to the person in charge of the hydraulic boarding bridge for handling. The fixed boarding bridge is an auxiliary equipment for loading and unloading in conjunction with the storage platform. This equipment is integrated with the platform and can be adjusted up or down according to the different heights of the truck carriage, making it convenient for forklifts to enter the carriage. The equipment adopts an imported hydraulic pump station with anti rolling skirts on both sides, making work safer and improving work efficiency.The electronic operation is very simple. With just one button, the air conditioning panel will automatically rise. Release the button, adjust the plate to reduce itself, and the hinge is used on the truck.For slopes that are unstable or unstable after earthwork excavation top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.


comment list
  • Tiantong Decoration Engineering Company

    New CityFolding boarding bridge Very good, I will order yours for the next batch.

  • Zhao Ningbo

    New CityFolding boarding bridge I received it, the seller delivered the goods very quickly, the logistics is also very good, the customer service attitude is excellent, very patient, giving people a k

  • fengjun machinery co., ltd.

    My colleagues like it very much. Come again next time. It's a rare genuine product. New CityFolding boarding bridge I'm very satisfied with it. The boss has a good personality, awesome. Not bad. The q

  • Li Kelu

    It is very comfortable to do business with you. Responsible, serious, New CityFolding boarding bridge is also good, I must give you a good comment. Looking forward to the next cooperation, I wish Riji

  • Design of ash conveying equipment

    Ask, can I send New CityFolding boarding bridge specific specifications, let me call you guys.

©2009-2024Metal Microblog  Sitemap