LahoskInstallation drawing of dry-type transformerCity application analysis
release time:2023-05-11 18:51:52

When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change as in the case of the second phase. There are three reasons for phase deficiency:The noise of dry-type transformer comes fromLahosk,Protection mode for type selection of dry-type test transformerThe flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.Zvecan,When the transformer is put into operation, if the tap changer is not in time, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, once the load increases, it is likely to burn the circuit breaker of the tap changer. In case of such situation, seal the flange, and solve the bolts that are likely to leak, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.


LahoskInstallation drawing of dry-type transformerCity application analysis



Dry type transformer companyVisual inspection method for transformer inspectionThe whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters,LahoskCharacteristics of dry type distribution transformer, so as to promote the safety of dry-type transformer!investment,Noise solution of dry-type transformerThe power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by %.The voltage regulating tap changer is not in place or poor


LahoskInstallation drawing of dry-type transformerCity application analysis



The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is, the disconnection component of the electric field is small.quality standard,The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.How to make up oil for oil immersed transformer?If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal,LahoskDifference between transformer and box transformer, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.Lahosk,If the power transformer stops running for more than h (if the allowable time should be reduced when the ambient humidity is & amp; gt; %) it should be insulated before putting into use,LahoskHow much is a power transformer, and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl, the insulation resistance from the secondary side to the ground should be ^ mh, and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).Oil immersed transformer operationWiring mode of dry-type transformer:

comment list
  • ronggui trading co.

    LahoskInstallation drawing of dry-type transformerHow is the quality? Do you have it in stock?

  • Yuanchen Decoration Engineering Company

    The stuff is really good, but LahoskInstallation drawing of dry-type transformer the price is a bit more expensive, but it is still worth the money. This is the first time I bought it, thanks to your

  • Construction Machinery Parts

    Cooperation with you is really good, LahoskInstallation drawing of dry-type transformer good quality, come to our company again if you have time.

  • Plastic machinery and lathe processing

    The festival is coming soon, can LahoskInstallation drawing of dry-type transformer be discounted?

  • Liming Trading Company

    Your service is very good, LahoskInstallation drawing of dry-type transformer is also very cheap! I will come often in the future!

  • Flowmeter

    Ask, can I send LahoskInstallation drawing of dry-type transformer specific specifications, let me call you guys.

©2009-2024Metal Microblog  Sitemap