Bessel SekhbergHow to solve the coking of wire drawing lubricant
release time:2024-04-17 13:06:17

Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, the hydraulic ground should be - millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, it should be replaced in a timely manner ( # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged or has foreign objects such as gravel, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air,Bessel Magdeburg, and then return it to the oil tank and connect the pipeline.Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.Bessel ,The counterweight steel wire rope should be equipped with an anti loosening device that is sensitive and reliable.The use of standard section connecting bolts should comply with the user manual and specification requirements.Aarschot,It is reported that a fixed electric elevator has good lifting stability and can only be used for fixed operations, making high-altitude operations easierThe connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side,Bessel La Rochelle , and the door bolt must be set on the side next to the construction electric elevator.


Bessel SekhbergHow to solve the coking of wire drawing lubricant



Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.And the decoration team is also using aluminum alloy electric elevators. What safety considerations should we consider during the use process? Many manufacturers have not clearly indicated it. Today the mechanical editor will talk to you about aluminum alloysFrom the above comparison, it can be seen that hydraulic electric lifting mechanisms have stable lifting, low noise, long service life, large load bearing capacity, and are relatively simple, making them suitable for use in stage equipment.Application process,Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.


Bessel SekhbergHow to solve the coking of wire drawing lubricant



The setting of the cable guide frame should comply with the user manual and regulatory requirements.Quality assurance,Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.Before installing the construction electric elevator, the foundation should be inspected and approved before installation.Low power consumption: When the hydraulic guide rail lifting platform descends,Bessel Sligo, it is driven by the pressure generated by its own weight greatly saving energy and reducing consumption.Bessel ,The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of meters by meters.To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, auxiliary lifting platforms are often arranged in front, back, left, and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling and lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out, so that the entire platform does not have a height difference, ensuring the safety of the cast members.Setting requirements: The landing door should be standardized and tooled.


comment list
©2009-2024Metal Microblog  Sitemap