Andolinhuo VillageHot dip galvanized square tubeWhat materials are indispensable
release time:2024-04-23 06:21:36

Functional index analysis of qb square tube - angular plasticity refers to the power of plastic deformation (permanent deformation) without destruction of qb square tube data under load.Steel pipe for geological drilling (yb-) is a steel pipe used by geological departments for core drilling. It can be divided into drill pipe, drill collar, core pipe, casing, sedimentation pipe, many new substances have taken place× × ~ × × ~ × × ~ × × ~ × × ~ × × ~ × × ~ × × ~ × × ~ × × ~ × × ~ × × ~ × × Standard treatment of steps for preventing oxidation of ~ square tube square tube is a kind of metallic maintenance. The main components are iron and zinc. It is easy to have redox reaction in the air. Once the reaction occurs and the original characteristics have changed. However, in order to maintain the original relevant characteristics, anti-oxidation treatment is required. The direct reason is to prevent the square tube from reacting with the oxygen in the air, which is the way to isolate the oxygen in the air. Today, this article makes a relatively standardized treatment on the relevant steps to prevent oxidation of square tubes: the key depends on what kind of antirust paint you use. . If you use epoxy zinc rich or iron rich antirust paint, you can directly spray fluorocarbon paint on it; if alkyd antirust or red lead is used, it shall be cleaned with paint remover and sprayed with epoxy zinc rich or iron rich antirust paint again before fluorocarbon paint can be sprayed.Square tube has a wide range of application fields. Its main field is the construction industry, which promotes the development of economic construction. Because the production process of square tube hole is different, the production design of square tube hole is also different. Next,Andolinhuo Village25 galvanized pipe, I will introduce in detail the types of tube hole design below.Ptuj,The pipeline is only subject to chemical pickling which can remove oxide scale, rust and old coating. Sometimes it can be used as the reprocessing after sand blasting. Although chemical cleaning can make the surface reach a certain cleanliness and roughness, and the batch rules shall comply with the provisions of corresponding product standards.Precision pipe is a seamless pipe with high dimensional accuracy and good surface finish for mechanical structure and hydraulic equipment. The selection of precision seamless mechanical structure or hydraulic equipment can greatly save machining hours, improve material rate and improve product quality. Seamless pipe can be divided into hot rolled pipe and cold rolled pipe according to different productionStrength refers to the performance of metal materials under static load (excessive plastic deformation or fracture). Since the action modes of load include tension, compression, bending and shear, the strength is also divided into tensile strength, compressive strength, flexural strength and shear strength. There is often a certain between various strengths. Generally, tensile strength is used as the basic strength indicator. Appropriate sites and warehouses shall be selected. The sites or warehouses for storing steel pipes shall be in clean and unobstructed places, away from factories and mines that produce harmful gas or dust. Weeds and sundries shall be removed on the site to keep the steel pipe clean; In the warehouse, it is not allowed to stack with acid, alkali, salt, cement and other materials that are corrosive to the steel pipe. Different types of steel pipes shall be stacked separately to prevent confusion and corrosion; Large section steel, rail,Andolinhuo VillageGalvanized thick square pipe, steel plate, large-diameter steel pipe, forging, etc. can be stacked in the open air; Small and medium-sized section steel, wire rod, reinforcement, medium diameter steel pipe, steel wire and steel wire rope can be stored in a well ventilated shed, but they must be covered and padded; Some small steel pipes, steel sheets, steel strips, silicon steel sheets, or thin-walled steel pipes, all kinds of cold-rolled and cold drawn steel pipes and high and corrosive metal products can be stored in the warehouse; The warehouse shall be selected according to geographical conditions, and generally adopts ordinary closed warehouse, that is, the warehouse with roof, enclosure, tight doors and windows and ventilation devices; The warehouse is required to pay attention to ventilation in sunny days, close and damp proof in rainy days, and often maintain a suitable storage environment. The principle of reasonable stacking and first in first stacking is to stack according to varieties and specifications under the condition of stable stacking and ensuring safety. Materials of different varieties shall be stacked separately to prevent confusion and mutual corrosion; It is forbidden to store articles that have corrosive effect on steel pipes near the stacking position; The bottom of the stack shall be padded high, firm and flat to prevent the material from moisture or deformation; The same kind of materials shall be stacked according to the warehousing order, so as to facilitate the implementation of the principle of first in, first out; The section steel stacked in the open air must be provided with wooden mats or strip stones. The stacking surface is slightly inclined to facilitate drainage. Pay attention to the straightness of the material placement to prevent bending and deformation; The stacking height shall not exceed m for manual operation, m for mechanical operation, and m for stacking width; A fixed channel shall be reserved between stacks, generally .m, and the access channel is generally ~ om depending on the size of materials and transportation machinery; The bottom of the stack shall be padded up. If the warehouse is cement floor it can be padded up by .M; If it is muddy ground, it must be padded . ~ .m high. If it is an open site, the cement ground shall be padded with O & middot; ~O· m, . ~ . m higher than the sand and mud surface, the angle steel and channel steel shall be stacked in the open air, i.e. the mouth shall face down, and the I-beam shall be placed vertically. The i-groove surface of the steel pipe shall not face up to avoid ponding and rust. The packaging and protective layer of the protective materials shall be coated with agent or other plating and packaging before leaving the factory, which is an important measure to prevent material corrosion. Attention shall be paid to protection during transportation, loading and unloading and shall not be damaged, the warehouse shall be kept clean and the maintenance of materials shall be strengthened. Before warehousing, materials shall be prevented from being drenched or mixed with impurities. Materials that have been drenched or contaminated shall be wiped according to their properties, such as steel wire brush for high hardness and cloth, cotton and other materials for low hardness; The materials shall be regularly after warehousing. If there is corrosion, the steel pipe surface does not need to be coated with oil after being cleaned, but for high-quality steel, alloy steel sheet, thin-walled pipe, alloy steel pipe, etc., the internal and external surfaces need to be coated with anti rust oil before storage; Steel pipes with serious corrosion shall not be kept for a long time after rust removal and shall be used as soon as possible. With the development of economy, all kinds of square tubes, rectangular tubes, seamless square tubes, galvanized square tubes and galvanized tubes have been recognized by the majority of customers for a long time. There are more and more counterfeit products on the market. In order to prevent being deceived when you are in square tubes, you need to know some knowledge about how to judge the authenticity of square tubes: & ldquo; We can judge by observing the surface and flatness of the square tube. If the surface of the square tube is relatively flat, it can reflect that the square tube is good. On the contrary, if the surface is not good


Andolinhuo VillageHot dip galvanized square tubeWhat materials are indispensable



Derusting: This is an important process for galvanized square pipes and components before coating, and it is the key to the quality of galvanized square pipes. Thorough derusting can improve the adhesion of antirust paint and prolong the service life of galvanized square pipe.Function index analysis of square tube - the strength acts on the parts in a great progress. The load on the parts is called the charge and trap load. The power of square tube destruction under the charge and trap load is called the charge and trap toughness.High pressure oil pipe for diesel engine (gb-) is a cold drawn square pipe for high pressure pipe of diesel engine system.Quality improvement,Functional index analysis of qb square tube - the load on the machine parts due to the great progress of strength is called the frontal collapse load. The power of destruction of qb square tube under the frontal collapse load is called the frontal collapse toughness.In this period, the technology of continuous rolling pipe was not mature.After chemical pickling, the square tube can be well protected by electrolysis. These are simple ways to prolong the service life of the square tube, so that the square tube can bring us great help in the use process. The cold galvanized square tube is the principle of cold galvanizing on the square tube used to make the square tube have corrosion performance. Different from hot-dip galvanizing, cold galvanizing coating is mainly carried out according to the electrochemical principle. Therefore, it is necessary to ensure the sufficient of zinc powder and steel resulting in electrode potential difference, so the steel surface treatment requirements are very high.


Andolinhuo VillageHot dip galvanized square tubeWhat materials are indispensable



We all know very well. Therefore, the quality of square tubes will directly affect the development of the construction industry. What if we can make the service life of square tubes longer? Here, we also need to ask the personnel of the square tube manufacturer for instructions, and use ingenious methods to prolong the service life of the square tube, so that the square tube can bring us greater help in life.Where to sell API,Cold drawn or cold rolled precision square tube (gb-) is a cold drawn or cold rolled precision square tube with high dimensional accuracy and good surface finish for mechanical structure and hydraulic equipment. The selection of precision square mechanical structure or hydraulic equipment can greatly save machining hours,Andolinhuo VillageGalvanized square pipe Q1, improve material rate and improve product quality.Whether the bottom is galvanized or painted; For paint, it is recommended to match: epoxy zinc rich um + epoxy micaceous iron intermediate paint um + polyurethane finish paint um. In this way, according to the standard of iso, you can protect the indoor and outdoor environment for years, which is not a big problem.: it refers to the processing of square tube, which places metal in a closed Jane and applies pressure at the end to extrude the metal from the specified die hole to obtain finished products with the same shape and size. It is mostly used to produce non-ferrous metal materials. Square tube ferrous metal, steel and non-ferrous metal. Before introducing the classification of steel, briefly introduce the basic concepts of ferrous metal, square tube steel and non-ferrous metal.Andolinhuo Village,High density may not be obtained by simple pressurization, and insulation shall be carried out at the same time.The surface of galvanized square pipe treated by sand blasting shot blasting or pickling process is relatively clean, and the oxide scale and rust are removed, which improves the adhesion of the coating. When the installation site unconditionally adopts sand blasting and shot blasting, manual and mechanical derusting can be adopted, but the derusting quality level must be reached.The strength, under which fatigue will occur.

comment list
©2009-2024Metal Microblog  Sitemap