IngolstadtSecond floor electric elevatorWorkshop process analysis
release time:2024-04-19 09:08:26

When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.Installation verticality deviation guide rail frame erection height, h/mH≤ H& gt; verticality deviation/mm≤ (/h≤ ≤ ≤ ≤ pairs of steel wire rope construction electric elevators the verticality deviation of the guide rail frame should not exceed (/) h.Ingolstadt,The installation position of the lower limit switch. The installation position of the lower limit switch should ensure that the contact plate triggers the switch when the rated load of the suspension cage decreases, causing the suspension cage to stop. At this time, the contact plate should also be close to the triggering of the lower limit switchWhen the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.Israel,Principle of electric elevator rotary valve: When the electric elevator rises, the rotary valve will automatically open. To close the plug valve, and then turn the transmission handwheel to lower the plug and achieve sealing.The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.The motor of the hydraulic guide rail lifting platform is set around the wellbore,IngolstadtScissor fork electric elevator, occupying a relatively small area improving the utilization rate of the wellbore area.


IngolstadtSecond floor electric elevatorWorkshop process analysis



Every theater is a public place with a large number of people, and safety considerations should be taken into account in stage design. According to relevant national regulations, in order to prevent accidents caused by the crushing of electric elevators or improper control by drivers. Electric elevators should be equipped with the following necessary safety devices to ensure that the car of the electric elevator stops rising or falling in a timely manner.Equal effect.Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descentPromise and keep promise,Work is essential, and the main protective accessories include safety belts, guardrails, protective covers, platforms and stairs, etc.During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed mm.During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.


IngolstadtSecond floor electric elevatorWorkshop process analysis



When the landing door is closed, the full width of the lifting passage opening should be covered.How many?,The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.Electric elevators should be regularly maintained and cleaned. During maintenance and cleaning, the bracket should be supported to prevent the electric elevator from overturning. Electrical and hydraulic systems should be maintained by professional personnel; When the battery level display is less than %Setting requirements: The installation and dismantling workers, electricians, and other operators of construction electric elevators should have special construction operations.Ingolstadt,IngolstadtElectric elevator 200kg,Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements,IngolstadtFreight elevator electric elevator, it is advisable to place the screw at the bottom and the nut at the top.Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower, Pavilion; Ideal props.


comment list
©2009-2024Metal Microblog  Sitemap