The beam edge distance is too small: The method of shortening the lower platform is to shorten the total length of the escalator, but note that the range of shortening is very limited, generally not exceeding mm. Generally, the platform cannot be shortened because it contains equipment such as cabinets and motors. Change the angle of the escalator from degrees to degreesIn the event of a fire, when instructed by the fire center or the dedicated operation button of the first floor firefighter to enter the firefighting state,AndreaSecond floor household elevator, the elevator should immediately stop on the floor without opening the door, return to the first floor station, and automatically open the elevator door if it is in the upward direction.Andrea,When passengers are riding on the escalator, they may lose their balance and fall due to leaning against the skirt board on the side of the escalator which does not move, but their feet move with the steps. Especially when carrying a lot of packages while taking the elevator, it is more likely to fall on the escalator due to the inability to hold the handrail properly. So, when riding on the escalator, we must stand firmly and support it well, and do not lean against the skirt board on the side of the escalator.Cleaning and cleaning of elevator car guide shoes. As is well known, the guide shoe runs on the guide rail and there is an oil cup on the guide shoe. To ensure that the elevator does not make any noise during operation, it is necessary to regularly refuel the oil cup and clean the guide shoe, and the cabin should be cleaned thoroughly.Kulai,Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.When the normal power supply is cut off, the lighting inside the non fire elevator has no power, while there is still lighting inside the fire elevator.Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase its area is: the area of the shared front room in residential buildings is greater than square meters, and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.


AndreaSmall household elevatorIndustrial Digital Development System



Measurement of elevator and escalator shafts (III)Slide elevators are installed inside buildings and are often used parallel to buildings and sidewalksThe treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, attention should be paid to the length of the pit or the opening of the floor slab, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.Manufacturing cost, but there are also many places where problems can occur. Some people have been caught due to abnormal door opening and closing, while others have encountered situations where elevator buttons malfunction and the display screen is black, making it difficult to see the floor clearly. Some have experienced the danger of falling straight several floors. Although there may not have been any personal injury, taking the elevator is not about finding or acting in a movie. The real life is disturbed by the frequent elevator accidents, which make my heart feel uneasyThere are dedicated operation buttons for firefighters at appropriate positions at the entrance of the first floor elevator. The operation buttons are generally protected by glass sheets and have a red&# quo; mark in place; Dedicated to fire protection; Words such as.Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.


AndreaSmall household elevatorIndustrial Digital Development System



The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft, such as the size of the machine room, floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor, mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).Affordable price,The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft, such as the size of the machine room, floor height,AndreaVertical obstacle free lifting platform, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets,AndreaSecond floor household small elevator, whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).These phenomena are not elevator malfunctions. When the elevator is fully loaded, the elevator does not stop: to avoid overloading, the elevator car no longer responds to the next station's outbound call.Measure the length, width, and depth of the pit (if any), and observe whether there are grooves and embedded parts at the support beam.Andrea,For escalators that require intermediate support, it is necessary to determine whether the site has the conditions for adding support, as well as the range of support that can be added, and other parameters.The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, attention should be paid to the length of the pit or the opening of the floor slab, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.The requirement for the shaft is that it should not be plastered, which is beneficial for reducing noise

comment list
©2009-2024Metal Microblog  Sitemap