KoblenzSeine RiverIndustry funding interest rates are still high
release time:2024-04-25 01:17:54

Installation verticality deviation guide rail frame erection height, h/mH≤ H& gt; verticality deviation/mm≤ (/h≤ ≤ ≤ ≤ pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (/) h.There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least . meters.Koblenz,Setting requirements: Construction electric elevators should be equipped with a down travel (limit) switch. The down travel (limit) switch should be able to automatically stop the cage running at rated speed before reaching the lower limit switch.The landing door should meet the requirements of the specifications and achieve standardization.Traiskirchen,The list of materials for making landing doors is as follows: Table : List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.Small safe operation distance: Circuit voltage (kV) of external power lines<~~~ Small safe operation distance (m) Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.


KoblenzSeine RiverIndustry funding interest rates are still high



The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.In addition, when adding hydraulic oil it is necessary to ensure the quality of the hydraulic oil, as some hydraulic oil manufacturers will choose hydraulic oil with poor quality. Hydraulic oil such as hydraulic lifting platforms not only cannot have any effect on folding arm elevators, but also affects the working efficiency of folding arm electric elevators due to deterioration issues.The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.For more,Before installation, the installation unit should confirm that the foundation, foundation bearing capacity,KoblenzXinrong, embedded parts,KoblenzChinstohova, concealed engineering acceptance form and concrete strength report.The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area,KoblenzYuanbao Mouytain, improving the utilization rate of the wellbore area.Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered to times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.


KoblenzSeine RiverIndustry funding interest rates are still high



The safety distance between the outer edge of the upper part of the landing door and the moving parts of the electric elevator during normal operation should not be less than .m; If the rated speed is not greater than .m/s, the safety distance can be .m.Let's see,The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of meters by meters.The downward movement of the hydraulic cylinder (i.e. heavy object lowering). The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder passes through the balance valve, hydraulic control one-way valve, energy-saving valve, and explosion-proof electric valveThe landing door should meet the requirements of the specifications and achieve standardization.Koblenz,There is no need to set up a computer room above the shaft like an elevator, and the top floor height can be installed at least . meters.The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.


comment list
©2009-2024Metal Microblog  Sitemap