ToulonAdvance support small conduitBe diligent in maintenance and be prepared
release time:2024-04-26 00:21:27

It is a thermoplastic material, which can be processed and formed many times, providing convenience for hot melting and electrofusion connection of pipes. Action mechanism of grouting pipe: the grouting pipe is a flexible material. Under the action of soil load, it is a mechanism of dispersing the force on each hole belt and forming a resultant force.Toulon, the gap is larger than the thickness of the pipe wall, that is, there is an active gap. Therefore, the Chengdu grouting pipe manufacturer kneads the pipe wall to form an 'eight' shaped wrinkle.Wolfsberg,Can the piston rod of the grouting pipe be protected to avoid being bruised and accelerating leakage? Glass fiber grouting pipe is a semi-rigid product made of glass fiber as raw material, high-strength alkali free glass fiber through a certain warp knitting process, and fiber filament coated on both sides.The existence of grouting pipe mesh restricts the lateral movement of soil. The lateral sliding deformation of the soil is limited by friction and interlocking engagement between the grouting pipe and the sand particles and the passive resistance of the sand particles to the grouting pipe, forming a good interlocking effect, so that the soil has better overall shear strength and bending stiffness.


ToulonAdvance support small conduitBe diligent in maintenance and be prepared



The overhead type is a special rack installed at the bottom of the driving head and connected with the wellhead tensioning equipment.The comparison between the embedded detection and the on-site detection of the grouting pipe is yzed as follows: The embedded detection pipe: The pile diameter of . ~ .m should be buried with double pipes; Three pipes shall be buried with pile diameter of . ~ m; Four pipes shall be buried above the pile diameter of m. According to the specific situation of Chifeng bridge, three pipes can be buried in the pile foundation.Can the stretching speed of grouting pipe be defined?Installation material list, The small editor of the grouting pipe reminds everyone that there should be no rust, water and other impurities when using the prestressed machinery. The working clip can be used after removing the foam in the packing box and the grouting pipe should be properly kept. However, when the prestressed tendon is long and the grouting pipe needs to be tensioned repeatedly, it is suggested that a small amount of lubricant (e.g. anchor pulling spirit) be applied to the tapered hole of the anchor plate by the prestressed machine, which is not only conducive to the follow-up and anchor pulling of the working clip but also conducive to the multiple grouting of the grouting pipe; Apply lubricant on the outer surface of the tool clip and the inner and outer surfaces of the taper hole of the anchor plate before use, and regularly remove the debris on the clip surface to make the anchor flexible. However, when the clip is cracked or the tooth surface is damaged, it needs to be replaced and can not be used again.It is required to ensure that at least one embedded reinforcement is firmly welded with the anchor ring of maolehan grouting pipe within every meter along the joint direction. The quality of XF type grouting pipe should be carefully checked. If deformation or inconsistent spacing between two steel beams is found, it should be repaired. If necessary,ToulonDouble layer small conduit advance support, so that the center line of the joint coincides with the center line of the actual reserved joint, and the deviation shall not exceed mm. Meanwhile, the inner edge of the steel side beam shall be kept vertical. After the XF grouting pipe is in place, the top surface of its steel beam shall be adjusted according to the longitudinal, transverse slope and elevation to be ~ mm lower than the adjacent asphalt concrete pavement and shall not exceed the pavement elevation.The main elastic element of the grouting pipe is the stainless steel grouting pipe, which compensates the axial, lateral and angular direction of the pipe by the expansion and bending of the grouting pipe.


ToulonAdvance support small conduitBe diligent in maintenance and be prepared



A short section of screw end rod is welded on both ends of a single prestressed thick steel bar, and then to the concrete components around the reserved hole crossing through the base plate.Let&#;s take a look at the prestressed machines and tools. The small editor of prestressed machines and tools reminds everyone that the screw end rod is made of cold drawn or heat-treated reinforcement, and the thread is fine teeth. The welding between the end rod and the prestressed reinforcement should be carried out before the cold drawing of the prestressed reinforcement. This grouting pipe can be used at the tensioning end and the fixed end. A general jack is used for tensioning, and the jack pull rod (with internal thread at the end) is tightened on the thread of the screw end rod for tensioning. After tensioning tighten the nut and anchor the rebar. The advantages of this grouting pipe are relatively simple, and when the jack returns oil after the grouting pipe, the prestressed reinforcement basically does not slide. If necessary, facilitate re tensioning. The disadvantage is that the accuracy of the length of prestressed reinforcement is high, and it cannot be too long or too short, otherwise the thread length is not enough.Variable cost,The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel, and the other is as a pipe for grouting at the bottom of the pile. The concrete shall be evenly distributed, and the vibration shall be 'fast inserting and slow pulling' and slightly pumping up and down to make the concrete vibrate evenly. The vibration shall be carried out in sequence to avoid over vibration and missing vibration until the concrete surface is horizontal, no significant subsidence, no bubbles and no mortar on the surface. During vibration, the vibrating handle shall not touch the side formwork, pipeline, embedded parts, etc.Before the installation of the grouting pipe, it is necessary to check whether the processed support is vertical to the grouting pipe fitting, and correct the non vertical support; Then install the grouting pipe on the bracket and fasten it.ToulonThe bi-directional tensile plastic mesh false roof used in underground coal mine with mine grouting pipe is specially designed and manufactured for the false roof support of underground coal mining face and roadway wall support. It is made of several high molecular polymers and filled with other modifiers through heating,ToulonAdvance small conduit and pipe shed, extrusion, molding, punching,ToulonGrouting hollow anchor manufacturer, stretching, coiling and other processes. Compared with metal textile mesh and plastic woven mesh, it has light weight, high strength, isotropy, and antistatic, It is a new type of mesh grouting pipe material for underground coal mine support engineering and civil engineering.The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel, and the other is as a pipe for grouting at the bottom of the pile.Several common failures in the installation of grouting pipes always have many problems when using grouting pipes for work. In order to enable everyone to provide production to the factory normally, we have specially summarized the following failures that will occur when using grouting pipes. If you have problems in the following examples, you will know how to solve them The first point is that if the joint, nozzle or bottom of the grouting pipe is not tightly sealed, it is OK to check the sealing The second point is that the joint is misaligned or deformed during installation. At this time, so that when they occur in the future, we will know how to deal with them to ensure a quick solution! The grouting pipe joint or the pipe orifice and the pipe bottom are not sealed tightly, so please bring in mud or cement slurry during the construction process to block the pipe: during the installation and grouting of the grouting pipe, the rebar is distorted or collided, causing the dislocation and deformation of the grouting pipe joint or the deformation of the pipe wall. The main reason for this is the selection of thin-walled grouting pipes.


comment list
  • Non-standard electromechanical equipment design

    ToulonAdvance support small conduit Delivery is really fast, too efficient, the product has been received, give you a good comment.

  • Colorful Solar

    I think it’s pretty good. When I bought it, I saw the comments in the comments and I bought it. When I saw the shipment, I was very excited. After ToulonAdvance support small conduit arrived, I was ex

  • Computer software development and sales

    Just bought ToulonAdvance support small conduit, the quality workmanship is even worse. Look back and introduce to friends

  • Zhao Wenge

    It is very comfortable to do business with you. Responsible, serious, ToulonAdvance support small conduit is also good, I must give you a good comment. Looking forward to the next cooperation, I wish

©2009-2024Metal Microblog  Sitemap