dramatistHow much is a 50 KVA box transformerconsult
release time:2024-04-27 05:57:40

After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.Operation and maintenance management of oil immersed transformerdramatist,Transformer inspection earOil leakage of porcelain pot and laminated glass oil level gaugeCaracal,Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.Gradually, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform, is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, roads, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.Oil leakage of bolt or pipe external thread


dramatistHow much is a 50 KVA box transformerconsult



After no-load test run is normal for h, it can be transferred to on-load operation, and the load shall be gradually increased from %, % and % by grade.When the output power P of the transformer is equivalent to the input power P, the efficiency & ETA; Equivalent, the transformer will not cause loss. But in fact, there is no such transformer. The electromagnetic energy of transformer always causes loss. The key of this kind of loss is copper loss and iron loss. Copper loss refers to the loss caused by the number of turns of transformer coil. When the current has a fever according to the number of turns of the coil,dramatistBid winning transformer of State Grid, it is called copper loss.If the oil immersed transformer is burned by the cover of the transformer, when the oil immersed transformer fails, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time, use detection equipment to put out the fire immediately. In order not to expand the hazard, the fire brigade must be notified.Sampling inspection,The voltage regulating tap changer is not in place or poorThe method and whole process of taking oil sample of power transformer are as follows:The project cost is different. Compared with the purchase price of capacity transformer,dramatistDry type transformer sample, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.


dramatistHow much is a 50 KVA box transformerconsult



The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?Bidding,When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, as in the case of the second phase. There are three reasons for phase deficiency:First of all, although dry-type transformer has strong moisture resistance it is generally open structure or very susceptible to moisture, especially the insulation level of dry-type transformer manufactured in China is low (lower flame retardant grade) Therefore, the dry-type transformer can obtain high stability only when the air humidity is below %. The dry-type transformer shall also be prevented from stopping operation for a long time to prevent serious damp. When the grounding resistance value is less than / V (operating voltage), it indicates that the transformer is seriously damp, and the trial operation shall be terminated.A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operationUnder normal conditions, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems,dramatistTransformer power three-phase, so as to ensure the reliable and stable operation of machinery and equipment.Due to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).(I) the distance between the external contour of kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than m; At the angle with actual operation a spacing of more than m shall be reserved; If metal fence is selected, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.

comment list
  • Urban landscaping engineering construction

    dramatistHow much is a 50 KVA box transformer How's the market trend recently, do you know anything?

  • toda machinery co., ltd.

    Just received the goods, very good, dramatistHow much is a 50 KVA box transformer great value for money! ! Come in the future!

  • Beam bottom steel plate

    My colleagues like it very much. Come again next time. It's a rare genuine product. dramatistHow much is a 50 KVA box transformer I'm very satisfied with it. The boss has a good personality, awesome.

©2009-2024Metal Microblog  Sitemap