Clement FerrandHenanCauses of market volatility
release time:2024-04-27 18:33:51

Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring,Before use and the top floor height can be installed at least . meters.Clement Ferrand,Clement FerrandWei Chen, we should observe whether there is any damage to the electric elevator. We can conduct a no-load test to raise and lower it. If there are any damaged parts, they should be replaced in a timely manner to prevent major accidents.Before installation the installation unit should confirm that the foundation, foundation bearing capacity, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.Torino,When applying a normal force of N to any position on either side of the door using a rigid mm square or circular flat surface in the locked position of the landing door, the door should be able to withstand and have no deformation; - Deformation not exceeding mm; After the test, it worked normally.Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.Horizontal lead screw mechanical electricity


Clement FerrandHenanCauses of market volatility



Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around -mm, and the top layer is not affected. It can be customized according to the location and environment.Safety devices: Electric elevators for construction should be equipped with overload detection devices. When the load inside the cage exceeds % of the rated load capacity,Clement FerrandWolfsburg,Clement FerrandShijingshan, the overload detection device will give a warning signal inside the cage,Speed limiter. To prevent the driving speed from exceeding the normal speed. A speedometer should be installed (not required for floors below or including the second floor), which is an individual mechanism that is integrated with a safety clamp; The entrance and exit of the passenger compartment should be equipped with safety doors. Public places, family dormitories, andTest method,The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.The quality of the standard section should comply with the product manual and specification requirements.Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower, Pavilion; Ideal props.


Clement FerrandHenanCauses of market volatility



The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.High quality brand,The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.Stop.Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, and report any problems found to the user unit.Clement Ferrand,The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.


comment list
©2009-2024Metal Microblog  Sitemap