KaipingMaastrichtDaily quote
release time:2024-05-06 02:26:13

The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.The quality of the standard section should comply with the product manual and specification requirements.Kaiping,If the set screw is loose,KaipingLeipzig, be sure to pin it tightly to prevent accidents caused by the shaft pin falling off. Hydraulic oil should be kept clean and replaced every months.When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than mm and there is no effective protection from other structures the side protection device for the landing entrance should be equipped.Studenichani,Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.Mechanical devices controlled by cage movement should not be used to open or close the landing door.


KaipingMaastrichtDaily quote



Human improper operation is the main factor causing malfunctions in scissor type electric elevators. When stacking goods, electric elevators should stack the goods neatly, which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually, during the operation of the electric elevator,KaipingWinnie Snow,KaipingFrance, it may cause the electric elevator to lose balance. After the goods are stacked completely, so that they are not afraid of the goods during the lifting process; Careless; Scattered downAnd the decoration team is also using aluminum alloy electric elevators. What safety considerations should we consider during the use process? Many manufacturers have not clearly indicated it. Today, the mechanical editor will talk to you about aluminum alloysDouble layer steel mesh: The diameter of the steel bars is mm, with a spacing of mm.details,Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength, stability, etc., and the production should meet the design requirements.The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength stability, etc., the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results,Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.Afterwards, it should be scrapped.The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.Kaiping,News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years, the products of electric lifting platform vehicles have been continuously improved, and various new technologies and materials have emerged, making the further development of lifting platform vehicles possible.When a rigid mm square or circular flat surface is applied with a normal force of N to either side of the door, the door may not meet the above requirements, but safety should be maintained.The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.


comment list
©2009-2024Metal Microblog  Sitemap