OstholtSecond floor electric elevatorCommon methods of fault diagnosis
release time:2024-05-10 20:23:24

The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.Double layer steel mesh: The diameter of the steel bars is mm, with a spacing of mm.Ostholt,Aluminum alloy lifting platforms can be divided into single column aluminum alloy, double column aluminum alloy, three column and four column aluminum alloy. Can be used in factories, automated warehouses parking lots, municipal facilities, docks, buildings, and installationsWith the continuous improvement of urbanization level in China the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, in order to meet the needs of the domestic market and the public, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.Rio Tercero,Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the doorProtective measures should comply with regulatory requirements.The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.


OstholtSecond floor electric elevatorCommon methods of fault diagnosis



The verticality of the guide rail frame should meet the requirements of the specifications.When adding hydraulic oil, we can extend the oil cylinder to the high position for filling. When filling, the lifting platform should not exceed the high position, and then retract the oil cylinder back to the low position to check if the hydraulic oil level is lower than the low position, and maintain it between the two.The list of materials for making landing doors is as follows: Table : List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.Fair price,When applying a normal force of N to any position on either side of the door using a rigid mm square or circular flat surface in the locked position of the landing door, the door should be able to withstand and have no deformation; - Deformation not exceeding mm; After the test,OstholtElectric banner elevator, it worked normally.Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace, Tower, the number of high-rise buildings in urban areas has sharply increased, in order to meet the needs of the domestic market and the public, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.


OstholtSecond floor electric elevatorCommon methods of fault diagnosis



Horizontal lead screw mechanical electricityWhere is it,Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform,OstholtElectric tricycle elevator, and the lifting of goods should try to maintain a stable and uniform speed.Electric lifting machinery, as an important product of social development in China, has a high social status and has now become an irreplaceable operational tool in our mainstream goods. The hydraulic pump station is the heart position of electric lifting machinery, which greatly tests the professionalism and attention of operators. It is our common responsibility to inspect it and ensure the daily use of machinery. Let's take a look at a few common sense issues: the manufacturer of electric elevators is to ensure the correctness of the power connection, and there should be no misconnection or leakage; Pay attention to cleaning work in daily life and do not allow stains to corrode it; When standing still, regular maintenance should be carried out to prevent the impact of rain and snow weather; Overloading is the first thing that operators must comply with; Iron Law&# quo;; The adjustment of the solenoid valve cannot be done arbitrarily and must be checked and certified by a professional organization; Especially when conducting outdoor operations under high temperatures, it is necessary to always pay attention to the abnormalities of the pump station; It is very normal for us to encounter some problems when using hydraulic boarding bridges, we don't have to worry too much. However, when there is a problem with the hydraulic boarding bridge, only a timely solution is the correct response. Below is an introduction to some common faults of the hydraulic boarding bridge and specific solutions: the hydraulic boarding bridge must be repaired while hanging and supporting the working platform of the lifting platform to avoid sudden descent of the lifting platform, causing unnecessary casualties; . Do not adjust the overflow valve arbitrarily. Because every component in the hydraulic system operates at a specified pressure, once the relief valve is adjusted, it may cause abnormal operation of the hydraulic system, causing unnecessary damage to people, machines, and objects; Non professional personnel are not allowed to disassemble electrical appliances at will to prevent electric shock or incorrect connection.The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator, with a size of meters by meters.OstholtFrom the above comparison, it can be seen that hydraulic electric lifting mechanisms have stable lifting, low noise, long service life large load bearing capacity, and are relatively simple, making them suitable for use in stage equipment.Protective measures should comply with regulatory requirements.Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.


comment list
©2009-2024Metal Microblog  Sitemap