Novi Pazar Overload of distribution transformerUse classification introduction
release time:2024-03-29 11:00:58
the packaging types are different. The transformer core and electromagnetic coil can be seen immediately for dry-type transformer

From the appearance, and only the shell can be seen for oil immersed transformer;Dry type transformer companyNovi Pazar ,The efficiency of transformer is closely related to the output power level of transformer. Generally, the greater the output power, the smaller the loss to output power ratio and the higher the efficiency. On the contrary, the lower the efficiency.(III) dry type transformers of KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than m; The distance between the electrified part and the road surface shall not be less than m.Myjava,kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.Power transformer is an idealized supporting facility transformer for medium cabinet and high-voltage cabinet at the present stage and can be equipped with safety protective casing according to different waterproof grades. It is applicable to key or unique natural environment sites such as multi-storey buildings, airports commerce, tunnel construction, chemical enterprises and factories.The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.


Novi Pazar Overload of distribution transformerUse classification introduction



In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than .kg, and the oil sample for simplified experiment shall not be less than kg.Accurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.Dry type transformer factoryPrice,When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.Oil leakage at electric welding positionCauses of fire in power transformer


Novi Pazar Overload of distribution transformerUse classification introduction



Dry type transformer manufactureroriginal,Oil leakage at looper flangeMaintenance contents of power transformerAfter the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.Novi Pazar ,For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage,Novi Pazar Energy saving of distribution transformer, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.The power transformer conductor refers to the connecting transmission line between each electromagnetic coil, between the electromagnetic coil and the group outlet pipe, and between the electromagnetic coil and the tap changer.The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding,Novi Pazar Power supply transformer, that is, the disconnection component of the electric field is small.

comment list
  • City Park Parking Lot Operating Company

    I’ve been too busy lately, the confirmation is late, the quality is good, Novi Pazar Overload of distribution transformer genuine, good quality and cheap, haha.

  • Shikang Optical Sales Company Tianjun Shopping Mall

    Finally got Novi Pazar Overload of distribution transformer So happy that! The workmanship is great.

  • Flowmeter

    Novi Pazar Overload of distribution transformer The quality at this price is excellent value for money

  • zhengke computer co., ltd.

    Yes, Novi Pazar Overload of distribution transformer good quality and great value for money

  • Niu Lichuan

    One word! ! value! ! ! The service attitude is really good, Novi Pazar Overload of distribution transformer delivery is fast. The quality of the goods is also quite good. I like it so much, thank you.

©2009-2024Metal Microblog  Sitemap