Other aspects: in the design process of food cold storage, it is also necessary to consider the cooperation between the cold storage and on-site fire fighting, ventilation water and electricity systems. It should meet the requirements of safety, science and environmental protection. When designing and installing the cold storage, the drainage problem must be considered, and the following points should be paid attention to during redesign and installation.Cold storage is mainly used for frozen processing and storage of foodKaran sebesh,The materials of refrigerator doors are the supporting facilities of refrigerator board, but the types of doors include manual sliding door, manual electric sliding door, fully automatic return door, electric door, cleaning door, fully buried and semi buried. Refrigeration compressor units have many common well-known brands. They are not only air-cooled and water-cooled, we must do better and find a suitable one for you.Whether the water pump works normally and whether the moldy switch is effective. In case of abnormality timely handle the overhaul and maintenance of the refrigeration compressor in the cold storage: generally, the refrigeration oil and drying filter shall be replaced times after the operation of the cold storage equipment. Replacement after half a year. Depending on the circumstances.Port Dickson, cold storage construction cold storage installation, fruit preservation cold storage, medical cold storage. Waste merchants, industry, enterprises and power departments are welcome to visit and negotiate! The cold storage body and storage plate include: floor, vertical plate and ceiling plate. The installation of storage plates in different directions and precautions are as follows: enter the construction site, verify the construction situation according to the construction drawings, determine the equipment installation position, and then refer to the following specifications.Install the temporary lighting facilities in the warehouse, install and arrange the construction electrical equipment, and do a good job in rain proof, moisture-proof,Karan sebeshPrice of medical cold storage project, anti-collision, anti binding and other safety protection.Commissioning cold storage. After all parts of the cold storage are installed and connected, the cold storage can be started for cold storage commissioning. According to the needs of customers, adjust the value of the cold storage,Karan sebeshHow much is the cold storage, the cold storage can reach the predetermined temperature, the cooling speed and the operation of the cold storage are normal, and the cold storage can be delivered for use. The cold storage installation unit shall also provide the cold storage user with training on cold storage use and management knowledge, as well as some after-sales training.


Karan sebeshInstallation and maintenance price of cold storagePattern of service market



The polyurethane insulation board shall be connected by plug-in notch connection, because it has higher strength when connecting in this way.As an important support for the development of cold chain performance, the standardized construction of cold storage refrigeration system is very important. It not only helps to rationalize the energy consumption of the cold storage system, but also has an important impact on improving the low-temperature preservation quality of commodities.During the early operation of the refrigeration unit, carefully observe the oil return of the compressor and keep it clean. If it is found that the oil level is not clean enough or the oil level drops, replace it with new oil in time, so as to avoid bad compressor and reduce the service life of the compressor.Honest service,Core tip: in the cold storage project, only with sufficient cold storage installation skills can we ensure that the cold storage is more energy-saving and power-saving after installation, and is not prone to failure, convenient use and management and long service life.Initial stage of cold storage equipmentIt will still decrease. The humidification amount will decrease by % at degrees.


Karan sebeshInstallation and maintenance price of cold storagePattern of service market



Install the electric control system. The electric control system of the cold storage mainly includes electric controller, electric door, lighting and other electrical equipment in the cold storage. The power supply of the cold storage is required to be stable phase line, and the power supply or backup power supply can be used as required. The circuit shall have reasonable discharge and corresponding protective measures.Market trend,In fact, there are some unique installation skills when installing the cold storage? The cold storage installed according to these skills is often short in both effect and quality, and the specific installation skills of the cold storage will also make some relatively detailed introduction for you in the following article. When installing the cold storage, you should install it from the corner first. Later, according to the height of the cold storage, make a hole in the middle of the insulation board, and tighten the angle iron parts until there is a hole on the insulation boardThe general installation of air-conditioned storage will use air coolers for refrigeration. In this case, the temperature of such a controlled atmosphere reservoir may be too low. It is suggested that the unit can adjust the scale a little larger in the process of temperature setting.Various construction materials, such as material certificate, test report and stage acceptance record, shall be carried out simultaneously with the project construction, carefully, timely, accurately and comprehensively reflect the whole process of production and construction, and actively cooperate with the owner in design change and technical negotiation.Karan sebesh,Fire retardant, flame retardant and high temperature resistant polyurethane is a kind of flame retardant self extinguishing material after adding flame retardant. Its softening point can reach more than ℃ and it will decompose only at higher temperature. In addition, electric door, lighting and other electrical equipment in the cold storage. The power supply of the cold storage is required to be stable phase line, and the power supply or backup power supply can be used as required. The circuit shall have reasonable discharge and corresponding protective measures.