The daily maintenance of guide rail type lifting equipment should pay attention to regular inspection and maintenance, eliminate hidden dangers, eliminate faults, and achieve these benefits for improving work efficiency, extending equipment service life, and ensuring the safety performance of the elevator.Do not adjust the solenoid valve on the motor arbitrarily. The solenoid valve is pre adjusted before leaving the factory and random adjustment can easily cause internal pressure to increase or decrease. In severe cases, it can shorten the service life of the motor.La Rochelle The power system inspection is the core, and the key to ensuring its normal operation is to use the hydraulic elevator. The sound of its operation can be used to determine whether it is operating normally and whether there is noise.What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame,La Rochelle Hydraulic lifting platform experiment, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC/ models, first install the suspension cage before installing the drive plate).Perpignan,Familiarity with the usage process and without a doubt, this is the first thing to understand. There are two ways to understand it: first, carefully read the user manual provided by the manufacturer when the hydraulic lifting platform leaves the factory; The second is the equipment that needs to be installed. A professional installation technician will be dispatched to install the hydraulic lifting platform. After the installation is completed, relevant users will be trained on the operating process and safety precautions of the hydraulic lifting platform and some maintenance matters in the future will also be explained; What should be paid attention to during the running-in period when using hydraulic lifting platforms? Check the wear of components. For newly processed and assembled components, there may be subtle deviations in shape and size that require a period of time for running-in. Therefore, during the running-in period, it is necessary to pay attention to whether there is any rapid wear. If there is any, the manufacturer of the hydraulic lifting platform should handle it in a timely manner to avoid equipment failure; Work between the pins and bearings to ensure that they are not worn, and add some engine oil or grease appropriately; Confirm if there is any noise during the running-in period. If it is found that the hydraulic lifting platform is noisy during operation, there is no need to worry in the early stage. If there are no major problems, run it several times more. After the running-in, the noise will naturally disappear. However, if there is noise for a long time and no signs of fading, please make sure to promptly produce it and solve the problem; Regularly check if the components are loose. Before use, check if there are any signs of looseness in screws, nuts, retaining rings, oil pipe joints, etc. If there are any, making it difficult for oil to form a uniform oil film on the friction surface. Additionally, due to assembly and other reasons, it is difficult to ensure the uniformity of fitting gaps, thereby reducing efficiency and causing early abnormal wear of equipment components; In severe cases, it may cause scratches or bite on the friction surface of precision fitting, leading to the occurrence of abnormal equipment noise.Familiarity with the usage process and without a doubt, this is the first thing to understand. There are two ways to understand it: first, relevant users will be trained on the operating process and safety precautions of the hydraulic lifting platform, and some maintenance matters in the future will also be explained; What should be paid attention to during the running-in period when using hydraulic lifting platforms? Check the wear of components. For newly processed and assembled components, there may be subtle deviations in shape and size that require a period of time for running-in. Therefore, during the running-in period, it is necessary to pay attention to whether there is any rapid wear. If there is any, the manufacturer of the hydraulic lifting platform should handle it in a timely manner to avoid equipment failure; Work between the pins and bearings to ensure that they are not worn, and add some engine oil or grease appropriately; Confirm if there is any noise during the running-in period. If it is found that the hydraulic lifting platform is noisy during operation, there is no need to worry in the early stage. If there are no major problems, run it several times more. After the running-in, the noise will naturally disappear. However, if there is noise for a long time and no signs of fading, please make sure to promptly produce it and solve the problem; Regularly check if the components are loose. Before use, check if there are any signs of looseness in screws, retaining rings, oil pipe joints, etc. If there are any, please reinforce or replace them in a timely manner to avoid accidents.

Hydraulic boarding axle; Streamline” The open hinge joint design increases the welding area by more than three times compared to ordinary tubular joints effectively extending the service life and simplifying maintenance.This series of products has a load capacity of . to . tons, and can also be customized according to user requirements, with a load capacity of up to tons.Remove and disassemble the lowering valve, blow the valve core clean with compressed air, and then reinstall it.Finance Department, if encountering an unsolvable problem with a hydraulic lifting platform, it is better to produce it quickly and conveniently, and guide the manufacturer to solve it. Please pay attention to safety precautions during maintenance.The product has a sturdy structure, a large load-bearing capacity, smooth lifting, and easy installation and maintenanceWhen conducting high-altitude operations on dangerous edges such as roofs, suspension bridges, slopes, or cliffs, guardrails or safety nets should be installed on the side facing the air or safety belts or ropes should be used.

Aluminum alloy elevators, also known as aluminum alloy lifting platforms, currently have a wide variety in the Chinese market. They are highly favored by users due to their flexible movement, light weight and small size.device management,Improper use of oil: Inadequate maintenance of high-altitude work platform equipment such as mobile elevators can also lead to small fitting gaps of components, making it difficult for oil to form a uniform oil film on the friction surface. Additionally, due to assembly and other reasons, it is difficult to ensure the uniformity of fitting gaps, thereby reducing efficiency and causing early abnormal wear of equipment components; In severe cases,La Rochelle Customized hydraulic lifting platform, it may cause scratches or bite on the friction surface of precision fitting, it is necessary to establish a mechanical management responsibility system; It is necessary to develop maintenance procedures for different models; Corresponding maintenance institutions must be implemented; It is necessary to handle the relationship between maintenance and production, so as not to affect production or equipment maintenance.The hydraulic system of the hydraulic boarding bridge has stable performance, high quality, low maintenance rate, and is sturdy and durable.La Rochelle ,The seat belt needs to be inspected every six months, with a load of kilograms. The test time is five minutes. After the test, check whether the seat belt is broken or deformed, and keep records of the experiment. Any unqualified seat belts should be immediately stopped from use.The product has a sturdy structure, a large load-bearing capacity, smooth lifting, and easy installation and maintenanceThe second is that the steel will have obvious thermal expansion effect at low temperature. Although this property of steel will be taken into account when designing and manufacturing hydraulic elevators, the environment is different after all. Under low conditions, the steel will have some unstable performance, such as hardness increase,La Rochelle Fixed hydraulic elevator, toughness decline, etc. At this time, more attention should be paid to the maintenance of equipment to keep key parts to avoid dry grinding.