GraVertical obstacle free lifting platformQuality document
release time:2024-04-26 00:56:43

Attention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis its safety cannot be guaranteed. If the elevator needs to be refueled without refueling, it will cause wear and tear on the mechanical components of the elevator, greatly shortening its service life and preventing normal use of the elevator.The beam edge distance is too small: The method of shortening the lower platform is to shorten the total length of the escalator, but note that the range of shortening is very limited, generally not exceeding mm. Generally, the platform cannot be shortened because it contains equipment such as cabinets and motors. Change the angle of the escalator from degrees to degreesGra,Factors to consider when choosing a household elevator: . Safety. Generally, brand elevators must have third-party testing,GraAluminum alloy mobile lifting platform, and elevators that have been inspected by professional organizations are safe, reliable, and guaranteed to be used with peace of mind. In addition, when choosing to purchase villa elevators, it is important to understand the safety components and configuration of this elevator. The essential safety equipment in the villa elevator includes a backup power supply and an emergency call outside telephone system to ensure the safety of private users on the elevator.The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, attention should be paid to the length of the pit or the opening of the floor slab, support needs to be added in the middle of the escalator truss. In addition,Restore the command button function in the cabin for firefighters to operate.The mechanical components of the elevator's traction machine require oil. There are two scales on the outer cover of the traction machine. Open the oil nozzle to check that the oil should be in the middle of the two scales. If the oil is lower than the lower scale, it means that the traction machine should be refueled. If not refueled, the elevator will not operate well for a long time, leading to the burning of the elevator traction machine and motor. After the elevator has been running for a long time, the oil should be replaced in a timely manner to keep the traction machine clean and in good condition.Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.


GraVertical obstacle free lifting platformQuality document



For escalators that require intermediate support, it is necessary to determine whether the site has the conditions for adding support, as well as the range of support that can be added, the height and load size of the equipment and support platform, and other parameters.These phenomena are not elevator malfunctions. When the elevator is fully loaded,GraLarge hydraulic turnover machine, the elevator does not stop: to avoid overloading, the elevator car no longer responds to the next station's outbound call.The front room of the fire elevator is equipped with indoor fire hydrants.Trustworthy,Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase, its area is: the area of the shared front room in residential buildings is greater than square meters, and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.Measure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning, the lighting inside the non fire elevator has no power, while there is still lighting inside the fire elevator.


GraVertical obstacle free lifting platformQuality document



The safety monitoring machine room environment screen cabinet main power switch traction wheel speed limiter shaft and pit guide rail layer door and car counterweight should be reliably fixed with pressure plates to prevent loosening.Product range,b. When the old elevator cannot start: due to the inability to enter the shaft, limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, the plane size of the shaft can be measured in the machine room, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.Will the elevator quickly fall during a power outage& mdash;& mdash; Some movies and TV dramas often mislead the public into thinking that if the elevator loses its power, it will lose control and engage in falling movements.There is a dedicated fire telephone in the fire elevator car.Gra,Brick concrete structure elevator shaft: For unfinished brick structure shafts, users can be required to make a circle of beams at a certain height, arranged on three sides, and disconnected on one side of the elevator entrance. The distance between the center heights of the beams depends on the product model, and should not exceed mm. The beam height should be mm, and the thickness should be the same as the wall. The lower ring beam is -mm away from the bottom of the pit and the higher ring beam is -mm away from the lower surface of the shaft roof. The completed framework with a solid brick structure shaft can be equipped with steel plywood at the position of the fixed guide rail support frame. The position and size of the plywood are provided by the elevator, and the user is responsible for providing materials and construction. If the shaft structure is made of hollow bricks without ring beams, steel beams can be considered to be added between the frames for rectification.b. When the old elevator cannot start: due to the inability to enter the shaft, limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, the plane size of the shaft can be measured in the machine room, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.Brick concrete structure elevator shaft: For unfinished brick structure shafts,GraRotating lifting stage, users can be required to make a circle of beams at a certain height, arranged on three sides, and disconnected on one side of the elevator entrance. The distance between the center heights of the beams depends on the product model, and should not exceed mm. The beam height should be mm, and the thickness should be the same as the wall. The lower ring beam is -mm away from the bottom of the pit, and the higher ring beam is -mm away from the lower surface of the shaft roof. The completed framework with a solid brick structure shaft can be equipped with steel plywood at the position of the fixed guide rail support frame. The position and size of the plywood are provided by the elevator, and the user is responsible for providing materials and construction. If the shaft structure is made of hollow bricks without ring beams, steel beams can be considered to be added between the frames for rectification.


comment list
  • Gas pressure regulator

    GraVertical obstacle free lifting platform The delivery is fast and the quality is good, but the logistics is a bit slow. Overall it is good, continue to support!

  • noise

    I have almost never seriously evaluated it before. I bought yours GraVertical obstacle free lifting platform and will visit it next time. It is so convenient that I can’t stop at all. It’s a genuine p

  • anpufa manufacturing co., ltd.

    Just received the goods, very good, GraVertical obstacle free lifting platform great value for money! ! Come in the future!

  • Design of chemical complete equipment

    The manager is nice! GraVertical obstacle free lifting platform is also real.

©2009-2024Metal Microblog  Sitemap