GhentTemperature measurement of dry-type transformerHigh temperature treatment measures
release time:2023-05-11 20:57:12

Power transformerTurn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, appropriate surface treatment shall be carried out, and then Fushi blue raw materials shall be selected for sealing treatment.Ghent,The rate of transformer is: n = P / pxo%, that is, when the copper loss of transformer is equivalent to iron loss, the rate is very large. Therefore, the load of transformer is: = P / PK. Fully consider the active power loss caused by reactive power in the system software during transformer operation. The load adjustment is: it can be seen from the calculation of load formula that the large rate of transformer does not occur when the load is full, Generally it is about %, but when selecting the transformer capacity, we should select effective transformers according to the load condition and load, so as to make the transformer in the situation of economic development and achieve the goal of power saving.Therefore,GhentDry type transformer procurement, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition in the installation and use process of lightning rod, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.Lovech,The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column but there are many calculation methods.The power transformer conductor refers to the connecting transmission line between each electromagnetic coil, between the electromagnetic coil and the group outlet pipe, and between the electromagnetic coil and the tap changer.When the whole process of winding wave of oil immersed transformer is calculated by using the marking method, the winding of oil immersed transformer is generally divided into multiple modules, and each module is replaced by an equivalent circuit, and its power circuit includes an inductance and vertical capacitance, a capacitance to ground or capacitance between windings, They also have mutual inductors between the inductors of each module, and collect the chain Internet as the equivalent power circuit of oil immersed transformer. The precision of the conclusion can completely meet the needs of practical projects.


GhentTemperature measurement of dry-type transformerHigh temperature treatment measures



Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.Oil sample inspection & mdash; & mdash; the performance parameters such as compression resistance and residue shall be carried out every three years. The long-term overload or overload of the transformer can reduce the cycle time.Caused by sand holes and cracks. For crack leakage,GhentThree phase transformer 480v to 380V, drilling stop hole is a good way to remove in-situ stress and prevent widening.Promise and keep promise, the transformer shall be placed for h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.(I) the distance between the external contour of kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than m; At the angle with actual operation, a spacing of more than m shall be reserved; If metal fence is selected, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.


GhentTemperature measurement of dry-type transformerHigh temperature treatment measures



Dry type transformerSampling inspection,The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.Once the insulation material of electrical equipment is overheated, the surrounding gas will cause a kind of odor. This kind of odor can be sniffed out by normal patrol staff. When you smell such odor during normal inspection, you should carefully inspect the equipment and parts until you find out the cause.Oil leakage at electric welding positionGhent,The bearing capacity of each load is different. Generally, while oil transformer has better load working capacity.What is the important role of power transformerOil leakage of bolt or pipe external thread

comment list
  • Steel grating and metal guardrail

    Old acquaintances, things are as good as always, genuine GhentTemperature measurement of dry-type transformer, outstanding cost performance

  • Colorful Solar

    Finally got GhentTemperature measurement of dry-type transformer So happy that! The workmanship is great.

  • jiangming trading co., ltd.

    In anticipation, I finally waited for my beloved GhentTemperature measurement of dry-type transformer, I wish the boss a prosperous business and wealth!

©2009-2024Metal Microblog  Sitemap