Seventeen green ancient cityHeeliaHow to establish effective sales channels
release time:2024-04-20 12:07:39

Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, concealed engineering acceptance form, and concrete strength report.Construction electric elevators outside the lightning protection rangeSeventeen green ancient city,Stop the suspension cage.Emergency manual valve: In case of power failure,Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.According to the needs of different performance genres the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, using a lift can make the theater have various forms such as an end stage, an extended stage, an island stage, an intermediate stage, a T-shaped stage,Seventeen green ancient cityGroseto, or a hall.


Seventeen green ancient cityHeeliaHow to establish effective sales channels



The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.Check the starter potential when the lifting table is not raised or the voltage is too low when the motor load is working. Voltage hydraulic range allowed&Remind customers that there are still many areas to pay attention to when maintaining and maintaining the lifting platform. We also hope that customers and friends can pay more attention when using it to ensure the safety of personnel and property, regularly maintain and extend its service life,Seventeen green ancient cityBalasajamat, and create greater benefits for the enterprise. What is the matching degree of electric elevators? Everyone has always been confused. In short, the matching degree of electric elevators is how the height of the electric elevator can be combined with the operating height. Electric elevators are not used frequently,Seventeen green ancient cityWuhai, so we must make it clear based on the actual operating height and actual load capacity when using electric elevators. If the frequency is too high, We suggest considering purchasing a guide rail electric elevator or a scissor fork electric elevator. The scissor fork electric elevator can achieve a maximum load capacity of tons, which effectively solves the problem of load capacity. If the frequency of use is too high and the height is relatively high, we recommend using a guide rail electric elevator. This type of electric elevator is not easy to malfunction under high-frequency operation, By solving the load capacity and frequency of use, the matching problem of electric elevators is effectively solved. Concept of electric elevator rotary valve: The electric elevator rotary valve is a type of valve that quickly opens and closes, and the rotary valve can reduce oil pipeline channels and optimize line settings.Good reputationThe spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed mm.The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.


Seventeen green ancient cityHeeliaHow to establish effective sales channels



Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the doormiddleman,News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years, the products of electric lifting platform vehicles have been continuously improved, and various new technologies and materials have emerged, making the further development of lifting platform vehicles possible.Greater than .s; When the hydraulic buffer is used, the oil level shall be checked, and the action of the hydraulic buffer shall be monitored by the Electrical safety switch. When the hydraulic buffer is compressed, the cage shall notIn addition to ground protective fences, low level doors can be used. Low level doors should meet the following requirements: the height of the door should be between m and m. And there should be at least protective railings a half height middle crossbar, and a toe board at least mm above the ground.Seventeen green ancient city,Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.Double layer steel mesh: The diameter of the steel bars is mm

comment list
©2009-2024Metal Microblog  Sitemap