Shi qiuqingRotating lifting stageWith design application pilot
release time:2024-03-29 14:47:34

The door closing button has no self maintenance function. During the designated maintenance period the elevator components in operation are inspected, refueled, dust is removed, and safety devices are debugged. Including non-destructive testing and maintenance of elevator traction steel wire ropes.The beam edge distance is too small: The method of shortening the lower platform is to shorten the total length of the escalator, but note that the range of shortening is very limited, generally not exceeding mm. Generally,Shi qiuqingVertical hydraulic elevator, the platform cannot be shortened because it contains equipment such as cabinets and motors. Change the angle of the escalator from degrees to degreesShi qiuqing,The elevator suddenly descends to the bottom floor and resumes normal operation: After the elevator is powered off and reconnected, the leveling reference position needs to be re determined.Machine room power supply: The power supply should be three-phase V, HZ, and the lighting power supply should be single-phase V HZ. The incoming line should be connected to the vicinity of the machine room entrance and equipped with an incoming socket. Specializing in product and renewable resource business, including: home elevator manufacturersQapshaghay,When the normal power supply is cut off, the lighting inside the non fire elevator has no power, while there is still lighting inside the fire elevator.Multiple elevator shafts can be connected and an - # I-beam can be fixed at a certain height between each adjacent elevator shaft, with the same position as the ring beam. The pit must be equipped with an isolation net that is mm above the ground level.Machine room power supply: The power supply should be three-phase V, HZ, and the lighting power supply should be single-phase V, HZ. The incoming line should be connected to the vicinity of the machine room entrance and equipped with an incoming socket. Specializing in product and renewable resource business, including: home elevator manufacturers


Shi qiuqingRotating lifting stageWith design application pilot



The basic content of escalator shaft measurement is to measure the lifting height. The same as measuring the height of a straight ladder, strictly speaking, the lifting height of a ladder is the vertical distance between the finished ground at the upper and lower support beams. When using the suspension line method to measure, attention should be paid to whether there is a drop between the positioning point of the line drop and the decoration surface of the lower support beam of the ladder.Elevator does not close the door or repeatedly opens and closes the door: there are debris blocking the light curtain or door contact plate at the entrance or sill.The door closing button has no self maintenance function. During the designated maintenance period the elevator components in operation are inspected, refueled, dust is removed, and safety devices are debugged. Including non-destructive testing and maintenance of elevator traction steel wire ropes.assets, immediately open the elevator door and enter the firefighter's dedicated state.In the event of a fire, when instructed by the fire center or the dedicated operation button of the first floor firefighter to enter the firefighting state, the elevator should immediately stop on the floor without opening the door, return to the first floor station, and automatically open the elevator door if it is in the upward direction.Brick concrete structure elevator shaft: For unfinished brick structure shafts, users can be required to make a circle of beams at a certain height, arranged on three sides and disconnected on one side of the elevator entrance. The distance between the center heights of the beams depends on the product model, and should not exceed mm. The beam height should be mm, and the thickness should be the same as the wall. The lower ring beam is -mm away from the bottom of the pit, and the higher ring beam is -mm away from the lower surface of the shaft roof. The completed framework with a solid brick structure shaft can be equipped with steel plywood at the position of the fixed guide rail support frame. The position and size of the plywood are provided by the elevator, and the user is responsible for providing materials and construction. If the shaft structure is made of hollow bricks without ring beams, steel beams can be considered to be added between the frames for rectification.


Shi qiuqingRotating lifting stageWith design application pilot



  “& rdquo; Elevator shaft: The design conditions are provided by the user to the architectural design department. The architectural design department analyzes whether the on-site pit depth, top floor height, reaction force, as well as which building structures are needed (such as smashing stairs or floors), and develops a renovation construction plan. If it is indeed necessary to change the elevator structure due to civil engineering conditions (such as car size, door opening width, etc.), then consider the non-standard design of the elevator.index,Machine room power supply: The power supply should be three-phase V, HZ, and the lighting power supply should be single-phase V,Shi qiuqingSemi-automatic high-altitude reclaimer, HZ. The incoming line should be connected to the vicinity of the machine room entrance and equipped with an incoming socket. Specializing in product and renewable resource business, let's talk about elevator and elevator safety knowledge: The elevators we currently use include box type passenger elevators, escalators and dedicated cargo elevators. Dedicated cargo elevators are installed due to special needs, and we don't use many of them. Now, let's take a look at the safety knowledge of box type passenger elevators and escalators: When we take escalators, Be sure to follow the safety instructions when riding on the elevator. Do not crowd or play around, hold onto the elevator firmly, fasten your shoelaces,Shi qiuqingSemi-automatic reclaimer, and avoid getting them caught up.The compensation chain and rope shall not collide with the shaft or other components during the operation of the elevator.Shi qiuqing,Measurement of elevator and escalator shafts (III)The compensation chain and rope shall not collide with the shaft or other components during the operation of the elevator.The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, such as the size of the machine room, floor height, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets, whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor, mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).


comment list
  • Wang Shuyun

    I finally waited until I bought it Shi qiuqingRotating lifting stage. At first, I was still wondering whether to buy it. I liked it a little bit. I was a little scared to read the comments. I was afra

  • Sun Liusuo

    Ask, can I send Shi qiuqingRotating lifting stage specific specifications, let me call you guys.

  • Yingnuo Filtration Equipment Company

    Make an advertisement for you, friends: This Shi qiuqingRotating lifting stage product is great value.

  • Recycled particles

    I have almost never seriously evaluated it before. I bought yours Shi qiuqingRotating lifting stage and will visit it next time. It is so convenient that I can’t stop at all. It’s a genuine product wi

  • Tuanyue Wire Mesh Products Co., Ltd.

    I have been shopping online Shi qiuqingRotating lifting stage for so many years, this is the first time I have taken this seriously. I am very satisfied with the product quality and workmanship.

  • Ariel leather shoes wholesale

    The quality is very good, exactly the same as the seller’s description, very satisfied, really like it, completely exceeding expectations, the delivery speed is very fast, the packaging is very carefu

©2009-2024Metal Microblog  Sitemap