MiddlefatHollow self-propelled anchor rod manufacturerNew preferential quotation
release time:2024-04-17 00:48:53

After the two pipes are connected by using the deformation of the grouting pipe, the kneading part of the joint is large at both ends and small in the center, so that the joint is stuck at one time, avoiding the possibility of loose union. The grouting pipe has proper, stable and excellent s in terms of tensile pull-out and torque resistance, and the protrusion is circular arc with small protrusion, which is useful to avoid collision with conduits, vibrators, etc. It is a thermoplastic material, which can be processed and formed many times, providing convenience for hot melting and electrofusion connection of pipes.Middlefat,Development trend editor since the advent of Portland cement in , cement grouting has been the main grouting method in engineering. However, ordinary cement can only be filled with sand gravel or pores with a diameter greater than . ~ .mm due to its coarse particles. Therefore, improving the fineness of cement particles has become the main way to improve the groutability of cement slurry. Some countries have developed a kind of ultra-fine cement, which can pour fine sand with permeability coefficient of - ~ -cm / s and micro cracks in rocks. It is a promising granular grouting material. Propionate is a kind of water-soluble polymer chemical slurry, whose viscosity is close to that of water. It is widely used in anti-seepage grouting and dynamic water plugging of fine rock cracks and medium fine sand layers. However, this kind of pulp material is toxic and pollutes the air and groundwater, so most of them have stopped production and use. In , and in , ac-ms slurry was developed in China. The toxicity of this kind of slurry is very small (only % of the toxicity of propionate). It is an ideal anti-seepage slurry. The non alkaline silicate slurry developed in Japan has no alkaline pollution to groundwater, low viscosity, high gel strength, good durability and does not change the pH value of groundwater. [] Grouting method is divided into ceramic process grouting and construction engineering grouting. Ceramic process grouting is the process of using the prepared mud injection in ceramic production. Construction engineering is to use appropriate methods to inject some curable grout into the cracks or pores of the rock and soil foundation, and to improve its physical and mechanical properties through replacement, filling, extrusion and other methods to make ceramic bodies suitable for processing.Make it into a certain shape, size and specification. Seepage prevention Water plugging The grouting pipe with the grouting pipe as the core flexible element can be compensated in the axial, lateral and angular directions on the pipeline. From the perspective of its performance, but because it is limited by casing and other accessories, it can often only be displaced in the axial direction. Therefore, the user needs to indicate the displacement in several directions when selecting and ordering, so as to select correctly. The working principle of the grouting pipe is to use its own elastic deformation to compensate the axial, angular, lateral and combined displacement of the pipe due to thermal deformation, mechanical deformation and various mechanical vibrations. The compensation has the s of sealing, pressure resistance, temperature resistance, corrosion resistance, impact resistance, It is safe and does not need to be welded on site.It is required to ensure that at least one embedded reinforcement is firmly welded with the anchor ring of maolehan grouting pipe within every meter along the joint direction. The quality of XF type grouting pipe should be carefully checked. If deformation or inconsistent spacing between two steel beams is found, it should be repaired. If necessary, the steel beam spacing of maolehan grouting pipe shall also be adjusted according to the ambient temperature during installation. XF type grouting pipe device shall be slowly put into the groove, so that the center line of the joint coincides with the center line of the actual reserved joint, and the deviation shall not exceed mm. Meanwhile, the inner edge of the steel side beam shall be kept vertical. After the XF grouting pipe is in place the top surface of its steel beam shall be adjusted according to the longitudinal, transverse slope and elevation to be ~ mm lower than the adjacent asphalt concrete pavement and shall not exceed the pavement elevation. It is safe and does not need to be welded on site.


MiddlefatHollow self-propelled anchor rod manufacturerNew preferential quotation



When the pipe cannot be connected due to serious blockage the following treatment principles must be followed: when it is the first pile of a certain bridge, core drilling detection must be carried out; when it is not the first pile of a certain bridge, the construction unit shall apply for changing the detection method The low strain reflection wave method or high strain strain strain measurement method shall be used and signed by the supervisor&#;s representative and the person in charge of quality supervision before implementation; In case of pipe blockage of a bridge for many times, core drilling inspection shall be carried out in due time. Other uses of grouting pipe introduction the grouting pipe of pile foundation refers to the steel pipe that needs to be embedded when testing the quality of pile foundation. Generally, it is bound in the reinforcement cage and lowered into the hole together with the reinforcement cage before pouring concrete! There are many reasons for the grouting pipe to gamble on the pipe, most of which are due to the leakage of slurry caused by the pipe joint not being welded well during processing, the pipe is blocked! To put it bluntly,MiddlefatAdvanced small conduit processing, the pipe is blocked by sundries! The role of the grouting pipe is to inject clean water into the grouting pipe and put the transducer into the grouting pipe for testing when the integrity of the pile foundation is tested by ultrasonic wave. If the grouting pipe is blocked, the transducer can not be put in, or can not be placed at the bottom of the pile, so it is impossible to comprehensively test the whole pile and judge the quality of the pile foundation!A -m long orifice pipe is generally installed at the opening of the grouting hole to prevent possible hole collapse, and to play a guiding role in drilling. During grouting, it is used to install an orifice closing device to prevent grout leakage. It is a thermoplastic material, which can be processed and formed many times, providing convenience for hot melting and electrofusion connection of pipes.how much,Grouting pipe grouting mainly improves the bearing capacity of piles from these two aspects Grouting is carried out through the grouting pipe embedded in the pile body. The slurry integrates the soil and slurry around the pile body through penetration splitting and compaction, so as to improve the physical and mechanical properties of the bearing layer of the pile body Especially for the ballast at the bottom of the pile, grouting can improve or eliminate the adverse effect of the ballast at the bottom of the pile on the end bearing capacity through the replacement compaction and consolidation of the ballast by the slurry.II During the drilling process of the bored pile, there will be a certain gap between the pile retaining wall and the surrounding soil layer, which will lead to the decrease of the pile side friction and affect the bearing capacity of the pile When the grouting pipe is used at the pile end for grouting, the slurry will permeate, fill and compact along the side of the pile under the pressure, so as to complete the replacement of the mud skin around the pile and the filling of the gap, such as greatly improving the pile side friction resistance The bottom of the horseshoe of the grouting pipe is too low. After the horseshoe is seated in the mold, the space between the outer mold and the horseshoe surface is greater than the thickness of the pipe wall.A short section of screw end rod is welded on both ends of a single prestressed thick steel bar,MiddlefatPipe shed and small conduit, and the nut and backing plate are sleeved to form the simplest grouting pipe. The pretension force is transmitted to the nut through the bearing force on the threaded slope of the screw end rod, and then to the concrete components around the reserved hole crossing through the base plate.Let&#;s take a look at the prestressed machines and tools. The small editor of prestressed machines and tools reminds everyone that the screw end rod is made of cold drawn or heat-treated reinforcement, and the thread is fine teeth. The welding between the end rod and the prestressed reinforcement should be carried out before the cold drawing of the prestressed reinforcement. This grouting pipe can be used at the tensioning end and the fixed end. A general jack is used for tensioning, and the jack pull rod (with internal thread at the end) is tightened on the thread of the screw end rod for tensioning. After tensioning, tighten the nut and anchor the rebar. The advantages of this grouting pipe are relatively simple, and when the jack returns oil after the grouting pipe, the prestressed reinforcement basically does not slide. If necessary, facilitate re tensioning. The disadvantage is that the accuracy of the length of prestressed reinforcement is high, and it cannot be too long or too short, otherwise the thread length is not enough.


MiddlefatHollow self-propelled anchor rod manufacturerNew preferential quotation



In recent years, there have been frequent natural disasters such as mountain slides, floods, earthquakes, fires, etc. we are so small in the face of natural disasters that we can only devote our efforts to normal prevention and post disaster rescue. The grouting pipe can reduce the damage caused by these natural disasters.Grouting pipe is an expert in road construction. It can connect the subgrade as a whole and improve the bearing capacity of the subgrade. When encountering natural disasters, the subgrade will not be greatly damaged due to natural disasters, so that we can save more people in the rescue work. The grouting pipe can also play a great role in slope protection. The use of the grouting pipe can well prevent the landslide of mountain soil and debris flow disasters. Through many years of practical experience, it has been proved that the roads that usually use the grouting pipe are far more than the same period of projects in terms of service life and quality. Thus reducing the casualty rate. Grouting pipe is a kind of excellent geosynthetics used for Pavement Reinforcement, old road reinforcement, subgrade reinforcement and soft soil foundation reinforcement. It has become an irreplaceable material in the application of asphalt pavement reflection crack treatment. This product is a semi-rigid product made of high-strength alkali free grouting pipe, which is made of mesh base material through internationally advanced warp knitting process and surface coating treatment. It has high tensile strength and low elongation in both longitude and latitude, and has excellent properties such as high temperature resistance, low cold resistance, aging resistance and corrosion resistance. It is widely used in asphalt pavement, cement pavement and subgrade reinforcement, railway subgrade embankment slope protection, airport runway, sand prevention and control projects. Grouting pipe laying and fixing of grouting pipe laying of glass fiber grouting pipe can be carried out by special equipment refitted from tractors or automobiles, or manually.Direct material, and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust,MiddlefatAdvance small conduit and pipe shed, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel, and the other is as a pipe for grouting at the bottom of the pile.[] further, the cutting rotating device rotates the cutting blade and pulley through a socket wrench to cut the casing wall.It is necessary to comprehensively consider the selection and configuration of grouting pipes, because there are many types of expansion joints, reasonable, reliable and economical.?MiddlefatThey shall be connected as a whole in the factory as far as possible. If it is necessary to connect on site due to manufacturing process, transportation conditions, etc., hot press vulcanization (grouting pipe) or welding (plastic grouting pipe) shall be used. The joint appearance shall be smooth and smooth, and the tensile strength shall not be less than % of the base metal. The so-called 'overlapping' without any treatment is absolutely not allowed. All kinds of cross connection points of grouting pipes shall be made of accessories produced by our new rubber products factory, so as to ensure that on-site connection is only carried out in straight sections during construction. Flexible material with sufficient deformation capacity and good adhesion with concrete. The grouting pipe is used as the pipe for grouting at the bottom of the pile. The test shows that the bearing capacity of the cast-in-place pile treated with the pile bottom grouting can be greatly improved At the same time, the grouting pipe can also be used as the pipe for the defect washing and grouting treatment of the accident pile. At this time, it is necessary to take measures to punch the pipe at the defect position where grouting is required. The classification of the grouting pipe can be divided into three categories according to the pipe materials: the advantages of steel pipe steel pipe are that it is easy to install, and it can be welded on the reinforcement frame by electric welding, and because of the large rigidity of the steel pipe After embedding, the parallelism and straightness can be basically maintained. At present, many large-diameter cast-in-place piles use steel as the grouting pipe. However, the price of steel pipe is relatively expensive: steel corrugated pipe steel corrugated pipe is a better grouting pipe material. It has the characteristics of thin pipe wall, less steel, impermeability pressure resistance, high strength and good flexibility. It is usually used for post tensioning reserved holes in prestressed structures: when used as grouting pipe. It can be directly bound to the reinforcement framework soil, and the joint can be connected with a larger corrugated sleeve. Since the bellows is light, it is very convenient to operate, but attention should be paid to keeping its axis straight during installation.Before the installation of the grouting pipe, it is necessary to check whether the processed support is vertical to the grouting pipe fitting, and correct the non vertical support; Then install the grouting pipe on the bracket and fasten it.


comment list
  • luanghui trading co.

    It's rare to buy MiddlefatHollow self-propelled anchor rod manufacturer, I saw such a good store. The price is very favorable, the service is also very good, and the things are good. Give me a good en

  • Software Development and Technology Transfer

    MiddlefatHollow self-propelled anchor rod manufacturer It can be said to be top-notch, and the details are perfect.

  • Qian'an Decoration Company

    The first online purchase MiddlefatHollow self-propelled anchor rod manufacturer. I use my personal experience to tell everyone that your service attitude is very good. The quality of the goods is als

  • Qianglian Trading Company

    I think it’s pretty good. When I bought it, I saw the comments in the comments and I bought it. When I saw the shipment, I was very excited. After MiddlefatHollow self-propelled anchor rod manufacture

  • Operation and maintenance and related fields

    MiddlefatHollow self-propelled anchor rod manufacturer Give me a discount next time, I wish you a lot of money

©2009-2024Metal Microblog  Sitemap