It is used to seal the construction joints, cold joints,San jositoPrecision tube, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water seeps into the joint, the PVC port slurry on the surface can be set to seal the joint. The appropriate grouting time can be selected at the end of concrete curing. Leakage joints can also be sealed with this. Provide long-term grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, old brand, the slurry can seal the construction joint, cold joint pipe leakage and the joint between the ground wall.● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.
According to the sequence of sectional construction along the stratum depth, grouting can be divided into sectional downward, sectional upward and sub full depth grouting. The segmented downward type is to start from the ground, drill section holes from top to bottom and inject section slurry. After each injection section, continue to extend the drilling and grouting, so as to alternately carry out until the designed final grouting depth, and then carry out re grouting from bottom to top; The sectional upward pattern is that the grouting hole is drilled to the final grouting depth at one time. All kinds of grouting pipes, steel flower pipes, advance small conduits, high-pressure grouting pipes, pipe shed pipes and the formal qualification of grouting pipe factory are welcome to inquire by telephone and sincerely invite cooperation! Grout stop shall be used for bottom-up sectional grouting; The secondary full depth grouting method is to drill the grouting hole to the final grouting depth, and then conduct secondary grouting for the full depth.Push the rock powder and sundries that are not washed, remain at the hole bottom, so as to improve the bonding strength and impermeability between the slurry stone body and the fracture surface.San jositoSteel pipeScope of use and instructions,2024-04-2110:45:01The secondary grouting pipe can only be grouted once and cannot be reused.The grouting mechanism includes filling grouting, infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method,San jositoGrouting pipe, alkali solution method high chemical grouting method and cement grouting method.
Special slings shall be used for the lifting of horizontal members such as laminated plates,San jositoSeamless pipe, and the stress at each lifting point shall be uniform to avoid fracture due to uneven stress of members. Grouting method is to put some solidified slurry into the cracks or pores of rock foundation in order to improve its physical and mechanical properties. Professional grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, high price, service, on-site settlement and honest management! The purpose of grouting is to prevent seepage, stop leakage, strengthen and correct the deflection of buildings.According to the measured water absorption of the borehole verify the water permeability of the rock stratum, and provide professional quality assurance for grouting pipe, steel flower pipe, advance small conduit, high-pressure grouting pipe, pipe shed pipe and grouting pipe factory. During the preferential activities, new and old customers are welcome to consult to determine the grouting pressure and flow, and determine the grouting slurry and its initial concentration.San josito,Aguie,● features: the grouting pipe is divided into secondary grouting pipe (ccll-y grouting pipe, qdm-it grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grouting pipe, ccll-d full section grouting pipe)