San Juan DiosPrecision tubeIt is difficult to predict the decline
release time:2024-04-20 19:47:55
San Juan DiosPrecision tube,

Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.

San Juan DiosPrecision tubeIt is difficult to predict the decline


The slurry stop plug used in the slurry stop plug grouting method is the key device to seal the grouting borehole and realize segmented grouting. A good slurry stop plug shall ensure normal operation under the grouting pressure of more than MPa. According to its structure and action principle, the currently used slurry stopper can be divided into mechanical type and hydraulic type. Among them, the mechanical slurry stopper is relatively simple and reliable and is widely used. - is several commonly used slurry stopper structures.The grout stop plug grouting method is generally used for Rock Fissure Grouting. The grouting pipe is provided with a grout stop plug, which can close the upper part of the grouting section. The main construction steps are as follows: the grouting hole is drilled by a rotary drill. All grouting holes in the rock stratum are required to be drilled by coring in order to find out the and distribution of rock stratum fractures. The coring rate shall reach ~ % in the rock stratum and % in the broken rock stratum. The drilling cleaning fluid is mainly clean water. If the rock is broken and the hole collapse is serious, thin mud slurry can also be used as circulating fluid.San Juan DiosPrecision tubeIt is difficult to predict the decline,San Juan DiosSeamless pipe,2024-04-2019:47:54Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, steel flower pipe grouting, pile foundation grouting pipe grouting pipe manufacturer, old brand, the pipe core and the outer wall of the pipe shall be washed clean.Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.

San Juan DiosPrecision tubeIt is difficult to predict the decline


The secondary grouting pipe can only be grouted once and cannot be reused.Push the rock powder and sundries that are not washed,San Juan DiosGrouting pipe, remain at the hole bottom, so as to improve the bonding strength and impermeability between the slurry stone body and the fracture surface.San Juan DiosPergamino,● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.