DenmarkGrouting hollow anchor manufacturerAnalysis of flaw detection status
release time:2024-03-28 00:03:36

When the grouting pipe is installed, and the bearing capacity of the support joint shall meet the design requirements. When connecting the grouting pipes, bolts must be installed symmetrically and tightened in sequence. Meanwhile, in order to prevent excessive deflection of the grouting pipes when axial force is applied, the deflection must be corrected to the horizontal before axial force is applied.In limestone area, the punching is not good, and it is difficult to sink the reinforcement cage. When the grouting pipe is deformed and blocked by unconventional means, the pipe is blocked due to the workers&#; carelessness and falling into small concrete blocks. The deformation and blockage of the grouting pipe bring great difficulties to the detection work, and even can not be detected. Therefore, when the grouting pipe is found blocked after the foundation pile is poured and before the inspection, effective measures should be taken to pass the pipe to ensure the smooth progress of ultrasonic inspection. Generally, there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, flushing and pigging with high-pressure water, and using a drill with a small drill to clean the hole.Denmark, Cut and cut the spring skeleton grouting pipe according to the components. The cutting surface must be flat and free of burrs. The length of its flat section must be ≥ the connecting reinforcement measures. During the bending process of the grouting pipe, it is not allowed to use a small one. The inner diameter of the grouting pipe is compressed and cracked. The alignment between M and FL is -The small editor of prestressed machines and tools will lead you to understand the main connection methods between the drive device and the wellhead: the connection between the flange of the drive head of the electric oil pump and the parallel flange is the most widely used one at present. There is a flange at the lower part of the drive head, and the size matches the flange of the Christmas tree wellhead.Ajlun, it can be divided into axial grouting pipe, transverse grouting pipe, angular grouting pipe and pressure balance grouting pipe. The grouting pipe cannot bear load and should be hoisted separately; In addition to the pre deformation required by the design for pre stretching or cold tightening, it is forbidden to adjust the installation deviation of the pipeline by deforming the grouting pipe; During installation, welding slag is not allowed to splash onto the surface of grouting pipe and suffer other mechanical damage; All movable components of the grouting pipe shall not be jammed by external components or restrict the normal operation of its movable parts. Most of the failure of the grouting pipe is caused by the external environment corrosion. Therefore, the contact between the external corrosion medium and the grouting pipe can be considered. For example, a packing sealing device can be added between the outlet end ring and the outlet pipe, which is equivalent to the sleeve grouting pipe. It can not only resist the invasion of external corrosive media but also add a safety barrier to the grouting pipe. Even if the grouting pipe is damaged, the grouting pipe can also play a compensation role and avoid the failure of the grouting pipe. The use of grouting pipes has been indispensable in modern building construction. In the s, grouting pipes were popularized in China, but they were fastener grouting pipes. In the s, China began to develop advanced grouting pipes with multiple s. With the continuous development of China&#;s construction industry in modern times, the construction industry has become increasingly mature and perfect in China, and the bamboo wood grouting pipe has been eliminated by the market. Grouting pipe has become the mainstream form of grouting pipe and is more widely used in construction.When the pipe cannot be connected due to serious blockage, the following treatment principles must be followed: when it is the first pile of a certain bridge, core drilling detection must be carried out; when it is not the first pile of a certain bridge,DenmarkTunnel leading small conduit and pipe shed, the construction unit shall apply for changing the detection method The low strain reflection wave method or high strain strain strain measurement method shall be used and signed by the supervisor&#;s representative and the person in charge of quality supervision before implementation; In case of pipe blockage of a bridge for many times, core drilling inspection shall be carried out in due time. Common problems and answers of grouting pipe what is the pressure inside the grouting pipe?The commonly used standard for grouting pipe is the inner diameter of -mm. The wall thickness of the pipe has little effect on the sound transmission, so there is generally no need to restrict the thickness of the pipe wall. However, from the perspective of saving steel consumption, it is OK if the pipe wall can bear the lateral pressure of new concrete, not necessarily the thicker the better.


DenmarkGrouting hollow anchor manufacturerAnalysis of flaw detection status



The grouting pipe can be divided into unconstrained grouting pipe and constrained grouting pipe according to whether it can absorb the pressure thrust (blind plate force) generated by the medium pressure in the pipe; According to the displacement type of the grouting pipe, it can be divided into axial grouting pipe, transverse grouting pipe, angular grouting pipe and pressure balance grouting pipe. The grouting pipe cannot bear load and should be hoisted separately; In addition to the pre deformation required by the design for pre stretching or cold tightening, it is forbidden to adjust the installation deviation of the pipeline by deforming the grouting pipe; During installation, welding slag is not allowed to splash onto the surface of grouting pipe and suffer other mechanical damage; All movable components of the grouting pipe shall not be jammed by external components or restrict the normal operation of its movable parts. Most of the failure of the grouting pipe is caused by the external environment corrosion. Therefore, in the structural design of the grouting pipe, the contact between the external corrosion medium and the grouting pipe can be considered. For example, for the external pressure axial grouting pipe, a packing sealing device can be added between the outlet end ring and the outlet pipe, which is equivalent to the sleeve grouting pipe. It can not only resist the invasion of external corrosive media, but also add a safety barrier to the grouting pipe. Even if the grouting pipe is damaged, the grouting pipe can also play a compensation role and avoid the failure of the grouting pipe. The use of grouting pipes has been indispensable in modern building construction. In the s, grouting pipes were popularized in China, but they were fastener grouting pipes. In the s, China began to develop advanced grouting pipes with multiple s. With the continuous development of China&#;s construction industry in modern times the construction industry has become increasingly mature and perfect in China, and the bamboo wood grouting pipe has been eliminated by the market. Grouting pipe has become the mainstream form of grouting pipe and is more widely used in construction.When installing the Hainan grouting pipe, carefully check the embedded reinforcement in the groove before the joint is lowered. If cracks or breaks are found, the position is improper or the gap is too large, remedial measures must be taken.The main elastic element of the grouting pipe is the stainless steel grouting pipe, which compensates the axial, lateral and angular direction of the pipe by the expansion and bending of the grouting pipe.Good reputation,It is required to ensure that at least one embedded reinforcement is firmly welded with the anchor ring of maolehan grouting pipe within every meter along the joint direction. The quality of XF type grouting pipe should be carefully checked. If deformation or inconsistent spacing between two steel beams is found, it should be repaired. If necessary, the steel beam spacing of maolehan grouting pipe shall also be adjusted according to the ambient temperature during installation. XF type grouting pipe device shall be slowly put into the groove, so that the center line of the joint coincides with the center line of the actual reserved joint, and the deviation shall not exceed mm. Meanwhile, the inner edge of the steel side beam shall be kept vertical. After the XF grouting pipe is in place, the top surface of its steel beam shall be adjusted according to the longitudinal, transverse slope and elevation to be ~ mm lower than the adjacent asphalt concrete pavement and shall not exceed the pavement elevation.In the construction of some grouting pipes, after the completion of the construction of the project, because some construction personnel did not take protective measures after the completion of the grouting pipes,DenmarkGrouting anchor, the project was damaged due to some external factors. In order to help users effectively improve the construction quality of the grouting pipes, the following article introduces the protective measures that should be taken after the completion of the construction of the waterproof layer of the grouting pipes. For various engineering designs, waterproof and water stop shall be carried out throughout the whole process of grouting pipe until the backfilling soil is completed.The grouting pipe diffuses the load on it. When the reinforced soil is loaded, the grouting pipe has a high bond with the soil, and has a mutual embedding effect with the soil, showing better tensile performance. The tensile stress of the soil is transmitted to the grouting pipe making the reinforced soil a tensile member, which can change the stress from the vertical direction to the horizontal direction, spread the load stress evenly to a large base range, and effectively improve the stress distribution of the pavement structure. The strength of high tensile reinforced soil is far higher than that of unreinforced soil, greatly improving the bearing capacity of the soil.


DenmarkGrouting hollow anchor manufacturerAnalysis of flaw detection status



performance of grouting pipe the grouting pipe is light in weight,DenmarkSelf drilling hollow anchor manufacturer, corrosion-resistant is acid-base resistant, aging resistant and easy to construct. It has high tensile strength (- times higher than that before stretching) and low elongation (only % - % of that before stretching). It is easy to cut and connect on site (polyethylene rope or connecting rod can be used for connection), and it can also be overlapped (the grouting pipe with overlapping buckle has been developed and can be connected without other materials), and the bending effect during construction is small. However, the grouting pipe has low hardness, poor mechanical damage resistance, and mechanical scars such as scratches and crushed stones will produce stress concentration, which will reduce the overall mechanical properties of the grouting pipe and the grouting pipe.Fair price,The quality of the steel upsetting head of the grouting pipe is not directly related to its own quality but the excessive strength will be harmful to the quality of the upsetting head. Therefore, when you choose the upsetting head anchor, you should explain it in detail to the manufacturer in the order. The grouting pipe shall be cut with a toothless saw (grinding wheel clamp). Cutting by electric or gas welding is easy to damage the surrounding surface and cause local heating at the end, which significantly reduces its performance. During the use of the grouting pipe, it is forbidden to take any form of heating deformation measures to avoid reducing the mechanical properties of the grouting pipe.The setting and curing reaction of cement water glass slurry includes cement hydration reaction and the reaction of Ca (OH) , the product of cement hydration reaction, with water glass, that is, after cement and water are mixed into cement slurry, Ca (OH) with strong activity is produced due to hydrolysis and hydration; Water glass interacts with Ca (OH) to form a gel with certain strength - calcium silicate hydrate. The reaction is as follows [].Grouting pipe grouting mainly improves the bearing capacity of piles from these two aspects Grouting is carried out through the grouting pipe embedded in the pile body. The slurry integrates the soil and slurry around the pile body through penetration, splitting and compaction, so as to improve the physical and mechanical properties of the bearing layer of the pile body Especially for the ballast at the bottom of the pile, grouting can improve or eliminate the adverse effect of the ballast at the bottom of the pile on the end bearing capacity through the replacement, there will be a certain gap between the pile retaining wall and the surrounding soil layer, which will lead to the decrease of the pile side friction and affect the bearing capacity of the pile When the grouting pipe is used at the pile end for grouting, the slurry will permeate, fill and compact along the side of the pile under the pressure, so as to complete the replacement of the mud skin around the pile and the filling of the gap, such as greatly improving the pile side friction resistanceDenmark,The glass fiber grouting pipe is a rigid product made of high-strength alkali free peeling fiber, which is made into a mesh base material through an internationally advanced fine knitting process and is surface coated. Unidirectional tensile plastic grouting pipe is a grouting pipe made of high-density polyethylene (HDPE) as raw material, plasticized and extruded plate, punched heated and stretched, extruded and pressed, and then punched with regular hole network, and then stretched longitudinally. In this process, the polymer is in a directional linear state and forms an oblong reticular integral structure with uniform distribution and high node strength. The tensile strength and rigidity of the grouting pipe are fully improved through the reorientation of the originally scattered chain molecules into a linear state by stretching. It has good flexibility. The pipes can be coiled when they are produced so that the number of joints in the pipe network can be reduced. It can be laid according to the terrain, easily bypass obstacles, and is convenient for construction.Before the installation of the grouting pipe, it is necessary to check whether the processed support is vertical to the grouting pipe fitting, and correct the non vertical support; Then install the grouting pipe on the bracket and fasten it.


comment list
©2009-2024Metal Microblog  Sitemap