AquintelTunnel small conduitIt can promote the development of society
release time:2024-04-29 20:15:51
because the space in the grouting pipe restricts the lateral sliding and rolling of the soil particles inside

At the same time, the relative displacement trend or relative displacement also occurs between this part of soil particles and adjacent soil particles, resulting in friction. This friction force is generally called 'bite force' or 'lateral force resistance'. The 'surface friction' and 'bite force' make the slip and roll of soil particles under the force of the upper limit line at the location of the grouting pipe and limit the lateral displacement of soil in the whole plane of the grouting pipe. The grouting pipe plays an important role in the key points of settlement. Therefore, it is reasonable to use the grouting pipe to treat the uneven settlement of fill excavation transition subgrade. This paper yzes the action mechanism of the grouting pipe according to its type and characteristics, introduces the construction technology and process in the construction of preventing the reflection crack of the road surface, grouting pipe is widely used in road maintenance engineering because of its advantages of simple, fast construction and low investment.Can the piston rod of the grouting pipe be protected to avoid being bruised and accelerating leakage?Aquintel,The so-called direct grouting method refers to the method of directly placing the grouting pipe into the soil by vibrating or drilling. According to the different forms of grouting pipes, the direct grouting method can be divided into the grouting pipe grouting method, the flower pipe grouting method, and the stop plug grouting method.Grouting pipe grouting method refers to the method of grouting directly through the nozzle at the lower part of the grouting pipe; The flower tube grouting method is a method of grouting through a grouting tube (flower tube) with multiple grouting holes on the side wall; The drill pipe grouting method refers to the method of grouting directly through the drill pipe for drilling. The wellhead clamp head is connected to the lower clamp head of the drive head. Some driving of grouting pipe.Chashniki,When the pipe cannot be connected due to serious blockage, the following treatment principles must be followed: when it is the first pile of a certain bridge, core drilling detection must be carried out; when it is not the first pile of a certain bridge, the construction unit shall apply for changing the detection method The low strain reflection wave method or high strain strain strain measurement method shall be used and signed by the supervisor&#;s representative and the person in charge of quality supervision before implementation; In case of pipe blockage of a bridge for many times, core drilling inspection shall be carried out in due time. Other uses of grouting pipe introduction the grouting pipe of pile foundation refers to the steel pipe that needs to be embedded when testing the quality of pile foundation. Generally, it is bound in the reinforcement cage and lowered into the hole together with the reinforcement cage before pouring concrete! There are many reasons for the grouting pipe to gamble on the pipe, most of which are due to the leakage of slurry caused by the pipe joint not being welded well during processing, the pipe is blocked! To put it bluntly, the pipe is blocked by sundries! The role of the grouting pipe is to inject clean water into the grouting pipe and put the transducer into the grouting pipe for testing when the integrity of the pile foundation is tested by ultrasonic wave. If the grouting pipe is blocked, the transducer can not be put in, or can not be placed at the bottom of the pile, so it is impossible to comprehensively test the whole pile and judge the quality of the pile foundation!In the engineering practice, some construction units directly pave the glass fiber grouting pipe after spraying the sticky layer oil, and the roller rolls after it. The effect is good, and the glass fiber grouting pipe is not easy to wave. Strictly control the entry and exit of vehicles transporting the mixture, and forbid vehicles to swerve, brake and dump the leftover mixture on the grouting pipe layer to prevent damage to the glass fiber grouting pipe; The back glue of glass fiber grouting pipe is easily soluble in water, and construction shall not be carried out in rainy days or wet roads; Glass fiber grouting pipe is made of grouting pipe, which is easy to irritate human skin. Construction personnel must wear protective gloves; When the grouting pipe is laid, the temperature of the road surface is required to be between . Therefore, the relative displacement trend or relative displacement will occur between the narrow two which will then generate friction. This friction is generally called 'surface friction'.The arrangement of the strain gauge shall be installed before the prestressing force is applied, and the bracket shall be fully cooled when the initial reading is measured; If the prestress has been applied, it must be noted in the report that the supporting axial force data reflects the change of the stress of the grouting pipe after the prestress is applied.


AquintelTunnel small conduitIt can promote the development of society



The research shows that the friction between the grouting pipe and the soil is also greatly related to the water content and compactness of the soil. The grouting pipe itself has a pattern, and is also a grid like integral geo reinforced material, so the friction between the grouting pipe and the medium is very large; The grouting pipe also has a great tensile strength, a large deformation modulus, and the reinforcement is stable and uniform, which can see good results in a short time. It can be seen from the experiment that the mesh reinforcement performance of the grouting pipe is better than the strip reinforcement material, which increases the stability of the project; The grouting pipe is especially suitable for the construction of high-speed highways, because the action force of the back and forth traffic on the soil is very great, and the grouting pipe can share the stress, increase the deformation modulus of the soil, effectively enhance the strength of the soil, and achieve the effect of stabilizing the project and long-term use. Water pressure test water pressure test is to use the grouting pump to inject clean water into the grouting section. Its main purposes are: check the grouting stop effect of the grouting stop pipe head, especially the grouting stop plug. It has good air tightness, low gas permeability, strong sealing and no leakage.how much,In the construction of some grouting pipes, after the completion of the construction of the project, because some construction personnel did not take protective measures after the completion of the grouting pipes, the project was damaged due to some external factors. In order to help users effectively improve the construction quality of the grouting pipes, the following article introduces the protective measures that should be taken after the completion of the construction of the waterproof layer of the grouting pipes. For various engineering designs, waterproof and water stop shall be carried out throughout the whole process of grouting pipe until the backfilling soil is completed.A short section of screw end rod is welded on both ends of a single prestressed thick steel bar, and the nut and backing plate are sleeved to form the simplest grouting pipe. The pretension force is transmitted to the nut through the bearing force on the threaded slope of the screw end rod,Aquintel42 small catheter, and then to the concrete components around the reserved hole crossing through the base plate.Let&#;s take a look at the prestressed machines and tools. The small editor of prestressed machines and tools reminds everyone that the screw end rod is made of cold drawn or heat-treated reinforcement, and the thread is fine teeth. The welding between the end rod and the prestressed reinforcement should be carried out before the cold drawing of the prestressed reinforcement. This grouting pipe can be used at the tensioning end and the fixed end. A general jack is used for tensioning, and the jack pull rod (with internal thread at the end) is tightened on the thread of the screw end rod for tensioning. After tensioning, tighten the nut and anchor the rebar. The advantages of this grouting pipe are relatively simple, and when the jack returns oil after the grouting pipe, the prestressed reinforcement basically does not slide. If necessary, facilitate re tensioning. The disadvantage is that the accuracy of the length of prestressed reinforcement is high, and it cannot be too long or too short, otherwise the thread length is not enough.It is proved by experiments that the bearing capacity of the same bored pile with and without grouting pipe is separated by %. That is why more and more bored piles and grouting pipe grouting are used more and more widely in China


AquintelTunnel small conduitIt can promote the development of society



The length can be matched according to the construction requirements, without loss.reform,Grouting pipe grouting mainly improves the bearing capacity of piles from these two aspects Grouting is carried out through the grouting pipe embedded in the pile body. The slurry integrates the soil and slurry around the pile body through penetration, splitting and compaction, so as to improve the physical and mechanical properties of the bearing layer of the pile body Especially for the ballast at the bottom of the pile, grouting can improve or eliminate the adverse effect of the ballast at the bottom of the pile on the end bearing capacity through the replacement, compaction and consolidation of the ballast by the slurry.II During the drilling process of the bored pile, there will be a certain gap between the pile retaining wall and the surrounding soil layer, which will lead to the decrease of the pile side friction and affect the bearing capacity of the pile When the grouting pipe is used at the pile end for grouting, so as to complete the replacement of the mud skin around the pile and the filling of the gap fill and compact along the side of the pile under the pressure, such as greatly improving the pile side friction resistanceThe installation will not affect the characteristics of the building grouting pipe itself; The installation or grouting process will not harm the concrete; Permanent sealing can be ensured after grouting; If there is no leakage, grouting is not allowed; Ccll-y series grouting pipe: grouting once, not reusable ccll-d series grouting pipe: multiple times of grouting grouting is not limited by time.It is applicable to waterproof joints of subway, tunnel and basement. If there is water leakage, polymer slurry and polyurethane chemical slurry can be injected. When water penetrates into the joint,AquintelAdvance support small conduit, the joint can be sealed by injecting slurry into the PVC port or spring skeleton port set on the surface. The proper grouting time can be selected after the concrete curing. Leakage joints can also be permanently sealed in this way. Action mechanism of grouting pipe: the grouting pipe is a flexible material. Under the action of soil load, it is a mechanism of dispersing the force on each hole belt and forming a resultant force.Aquintel, It is safe and does not need to be welded on site.Answer: Yes, the elastic extension speed of the grouting pipe can be defined within a certain range in the design, but for a grouting pipe that has been designed, its elastic extension speed is certain.How to deal with the joint if the grouting pipe is installed in sections? If the grouting pipe is installed in sections, the joints must be welded. The welded joints of the section steel have been prepared in the manufacturing plant, and can be installed after the two-phase adjacent joints are aligned. After all beams are welded, anchor them according to the above steps. Install the formwork at the beam end. The formwork shall be made according to the overall dimensions of Hainan grouting pipe device and the notch of the reserved slot. The formwork shall be made quite tight to prevent mortar from flowing into the displacement control box or into the beam end gap.After checking that the installed formwork is tight and seamless, clean the reserved groove, then pour concrete and vibrate it tightly. The concrete shall have at least the same strength as the structural concrete at this place, and the grouting pipe device in Hainan shall be kept clean when pouring concrete.


comment list
  • rue deep aviation equipment co., ltd.

    My colleagues like it very much. Come again next time. It's a rare genuine product. AquintelTunnel small conduit I'm very satisfied with it. The boss has a good personality, awesome. Not bad. The qual

  • Xindi Stone Carving Company

    I’m really sorry.

  • Zhao Zhiming

    Since searching and shopping online, you never have to go out and wander around. Your AquintelTunnel small conduit quality is guaranteed, logistics and delivery are fast, big brands are better than of

©2009-2024Metal Microblog  Sitemap