CarlosaPrice of 10 ton mobile boarding bridgeHow is the application concept
release time:2024-04-20 01:45:22

Attention: Abnormal meshing of gear teeth should be avoided: uneven rolling of the rollers should be avoided; Avoid diagonal orientation of the guide rollers; It should be avoided that the guide rollers are kept at the same time for a long time; The above abnormal phenomena can lead to rapid wear and even scrapping of gears, racks, rollers, and guide rails. If adjusted more carefully, it will be more beneficial for the service life of the elevator.Check and repair the electrical circuit and control panel switch components. If there is aging in the circuit, replace itCarlosa,Folding arm lifting platform product features Folding arm lifting platform High altitude operation platform degree rotation without external power supply, can work across obstacles, lifting smoothly and safely. The curved arm lifting platform adopts a curved arm working arm, and the brush pressure should be adjusted to ensure that its area is not less than %.Republic of Bosnia and Montenegro,Check the fastening status of the wall bracket, support rod, and bolts and retaining rings between the lifting cargo elevator and the bridge. If they are loose or displaced, they should be checked and tightenedAll connecting shafts must have split pins and be sufficient.  ?? The supervision unit shall effectively fulfill its safety responsibilities, and if any potential production safety accidents are found, it shall require the installation unit and the user unit to rectify within a specified period of time. If the installation unit and the user unit refuse to rectify, they shall promptly report to the construction unit


CarlosaPrice of 10 ton mobile boarding bridgeHow is the application concept



The frequency conversion system circuit of the construction elevator is mainly composed of two parts: the main circuit and the circuit. The main circuit is mainly composed of a construction lifting cargo elevator (hereinafter referred to as the lifting cargo elevator) driven by a more complex rectifier. Before installation all the eccentric roller shafts of the lifting cage and driving mechanism are loosened or adjusted to a large eccentricity. The lifting cage and driving mechanism are installed in the guide rail frame respectively, and the two are connected. Starting from adjusting the driving mechanism,Carlosa8-ton mobile boarding bridge, power on the suspension cage to lift it m above the ground or detach it from the ground buffer spring (or support). The adjustment and sequence are as follows: . Use a special wrench to rotate the lower double (single) pendulum eccentric shaft to adjust the eccentricity to ensure that the installation plate surface of the driving mechanism is perpendicular to the horizontal plane, and ensure that the upper and lower pendulum wheels evenly guide the rails at the same time. Use your hand to move each wheel body and check if it evenly presses the rails; . Use a special wrench to rotate the eccentric shaft of the gear rack back pressure wheel to adjust the side clearance during gear rack meshing. When adjusting, use a feeler gauge to measure the side clearance to .; Between .mm, each pressing wheel should evenly press on the back of the rack. Move each wheel body by hand to check if it evenly presses against the tooth back. Similarly, adjust the guide rollers on both sides of the guide rail. The adjustment key is to adjust the guide wheel on one side of the guide rail to lightly press it onto the guide rail. When moving the wheel body by hand, it should be possible to rotate but there should be obvious obstruction; The roller on the other side should maintain a clearance of .-. ram with the guide rail; . Adjust the lifting cage according to the above and sequence. If the driving mechanism and the lifting cage are integrated into the lifting cargo elevator, the lifting cage should be adjusted according to the and sequence of adjusting the driving mechanism. Conduct a visual inspection of the operation of each roller, and use the lead pressing method and coloring method to check the meshing of the gear pair; Fine tune pairs of unsatisfactory parts. The key point is to carefully adjust the meshing status of the gear pair: when the spots shown in appear on the surface of the gear rack, it indicates that the driving mechanism is tilted towards the side of the guide rail. At this time, the easier it is to damage the gears and racks.Thermal aging stress relief is generally suitable for small workpieces, while the lifting foundation structure has a large volume and does not have a large enough annealing furnace. Using natural aging takes one year and the production cycle is too long, so neither of these two methods is feasible. After research and understanding by the manufacturer, it was found that selecting appropriate support points for large welded structural components can perform vibration aging stress relief. Therefore, the manufacturer has decided to use vibration aging for stress relief of the platform lifting foundation. Long term promotion of downgrading manufacturers, old brands, price advantages, and guaranteed quality!Check the clearance of the ball bearing and the wear of the suspension wheel guide wheel. If the roller is worn, it is necessary to adjust or replace it. If the elevator bearing is worn,CarlosaSelf leveling track scissor fork lifting platform, replace the guide wheel or bearingSafety and healthCheck and repair the electrical circuit and control panel switch components. If there is aging in the circuit, replace itManganese steel is generally used as the primary profile for warehouse cargo elevators. In order to achieve better anti-corrosion effect, a layer of rust resistant primer is usually applied, which effectively blocks air and prevents premature corrosion of the steel. Below, Ruilong hydraulic press will explain the role of rust resistant primer.Manganese steel is generally used as the primary profile for warehouse cargo elevators. In order to achieve better anti-corrosion effect a layer of rust resistant primer is usually applied, which effectively blocks air and prevents premature corrosion of the steel. Below, Ruilong hydraulic press will explain the role of rust resistant primer.


CarlosaPrice of 10 ton mobile boarding bridgeHow is the application concept



When installing, disassembling, and adjusting the rotating mechanism, it is important to ensure that the centerline of the reducer of the rotating mechanism is parallel to the centerline of the gear, distribution box, etc.,CarlosaElectric aluminum alloy lifting platform, and should be kept clean regularly. Dust on electrical equipment should be cleaned in a timely manner. When encountering overheating in the electric motor, it is necessary to stop it in a timely manner and troubleshoot before continuing to operate. The motor bearings should be in good condition, and the hydraulic cargo elevator should provide us with safety protection. The application of hydraulic cargo elevators in our production is already very common, and plays an important role in our production, especially in high-altitude operation of goods.Convenient and efficient,Check and repair the electrical circuit and control panel switch components. If there is aging in the circuit, replace itFolding arm lifting platform product features Folding arm lifting platform High altitude operation platform degree rotation without external power supply can work across obstacles, lifting smoothly and safely. The curved arm lifting platform adopts a curved arm working arm, and the scope and space of operation are not affected.With the continuous development of the economy, meeting the needs of society, and increasing productivity, hydraulic cargo elevators play an important role in high-altitude operations. Hydraulic cargo elevators operate up and down, and can provide us with a safe and stable platform. We can provide security for our safety when working at heights.Carlosa,The wear rate is fast, and due to factors such as processing, assembly, and adjustment of new machine components, the friction surface is rough, the mating surface area is small, and the surface pressure condition is uneven. During the operation of the machine, the concave and convex parts on the surface of the parts are intertwined and rubbed against each other. The metal debris that falls off from the grinding process, further accelerating the wear of the mating surface of the parts. Therefore, during the running-in period it is easy to cause wear on components (especially the mating surface), with a fast wear rate. At this point, if overloaded, it may cause damage to the components and lead to early failures.Regarding the construction elevator with counterweight, check the adjustment and fixation status of the counterweight guide wheel. Check the balancing equipment of the steel wire rope, the crown wheel, and the counterweight steel wire rope bracketRegularly check the connection of each part and tighten it if there is any looseness. The tightness of the body connecting bolts should be checked when the body is under pressure (the rotating arm can be used to cause compression)


comment list
©2009-2024Metal Microblog  Sitemap