Spiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only -mm and a travel distance of up to m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.Model Example: Hanging Cage Specification: LABSC/TDx Type I: ~ Type II: ~ Type V: ~ Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x. (kN).Antibes,Construction electric elevators must be equipped with lifting cages and reusable buffers, and comply with regulatory requirements.When the landing door is closed, the full width of the lifting passage opening should be covered.Akouda,The setting of the cable guide frame should comply with the user manual and regulatory requirements.When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.


AntibesHeilongjiangWhat aspects of the operation should be paid attention to



After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.The stopper bearing of the mechanism is kept intact.During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.Word of mouth recommendation,The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements,AntibesPotisi, which should cover the opening with its full width,AntibesLv Liang, and should not open towards the lifting passage.When the landing door is closed, the full width of the lifting passage opening should be covered.


AntibesHeilongjiangWhat aspects of the operation should be paid attention to



Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).Promotion,Acceptance: Concrete strength grade C, they should be replaced in a timely manner to prevent major accidents.Before operating the construction electric elevator we should observe whether there is any damage to the electric elevator. We can conduct a no-load test to raise and lower it. If there are any damaged parts,AntibesHunan, routine inspections should be carried out according to regulations and inspection records should be filled out.Antibes,Safety performance: Electric elevators not only have the safety device of traditional traction elevators, but also have an overflow valve to prevent excessive system pressure during upward movementSetting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.Acceptance: Concrete strength grade C strength testing report.