AuorburgBourgesWhere is the classification difference
release time:2024-04-23 14:32:48

The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results, and report any problems found to the user unit.AuorburgThe device should be used within the valid calibration period and operate effectively and reliably. The anti fall safety device should have a valid inspection certificate (or inspection report),AuorburgKorma, and the validity period should not exceed year. Anti fall safety devices have been manufactured for five yearsThe foundation base or embedded parts should be fully embedded in the concrete foundation plate.Al Mubarraz,The landing door should meet the requirements of the specifications and achieve standardization.Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor positionSafety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires, soft scenery, etc. In some theaters, there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets, etc.The water cooling of hydraulic stations is generally tubular water cooling. The selection is based on the heat load to calculate the heat exchange area, while the air-cooled electric elevator uses an air cooler to calculate the heat exchange capacity based on the heat load. Then, the selection calculation is carried out under the condition of satisfying the flow rate. So, these two types of cooling are different and have significant differences.When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.Honesty is the foundation,Setting requirements: The wall bracket should use the manufacturer's matching standard products.Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.Chain type electric lifting mechanism: With a good guiding mechanism, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.


AuorburgBourgesWhere is the classification difference



Vertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, it can achieve the lifting of a double-layer tabletop. Multiple lifting platforms can be formed as needed,Auorburgstick, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion, Terrace Tower, Pavilion; Ideal props.Inspection requirements,Advantages of electric elevator rotary valve: Simplify the installation of electric elevator pipelines; The operation is more convenient, and the valve can be opened and closed at any time; The installation of a rotary valve reduces the friction of the sealing components; Compact structure, small size, and space saving; Increased the service life of electric elevator pipelines and solved the problem of easy oil leakage.Setting requirements: Steel wire rope electric elevators and reusable steel wire ropes should be equipped with anti loosening rope devices, which should have compliant loosening rope switches and be able to interrupt any movement of the cage until it passes through theThe hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder returns to the oil tank through the balance valve, hydraulic control one-way valve, throttle valve, and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.Auorburg,The scaffolding of the parking platform should be laid tightly and firmly.Mechanical devices controlled by cage movement should not be used to open or close the landing door.Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.


comment list
©2009-2024Metal Microblog  Sitemap