CamillanGrouting pipePrices rose slightly and downstream demand gradually recovered
release time:2024-03-28 17:22:42
compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry infiltration grouting, and chemical slurry includes silicate (water glass) and high slurry. Silicification method,CamillanSteel pipe, alkali solution method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.

CamillanGrouting pipePrices rose slightly and downstream demand gradually recovered


Water pressure test water pressure test is that the grouting pump injects clean water into the grouting section, and its main purpose is to check the slurry stop effect of the slurry stop pipe head, especially the slurry stop plug.The grouting equipment, grouting pump and the lowered grouting pipe are connected for grouting, and the grouting is carried out according to the requirements. The grouting pump will inject the slurry into the soil. After completing the construction of one grouting section, move the grouting pipe up or down according to the requirements to carry out the construction of the next grouting section.CamillanGrouting pipePrices rose slightly and downstream demand gradually recovered,2024-03-2817:22:41The grouting mechanism includes filling grouting, infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method,CamillanGrouting pipe,CamillanPrecision tube, high chemical grouting method and cement grouting method.The secondary grouting pipe can only be grouted once and cannot be reused.

CamillanGrouting pipePrices rose slightly and downstream demand gradually recovered


The secondary grouting pipe can only be grouted once and cannot be reused.The grout stop plug grouting method is generally used for Rock Fissure Grouting. The grouting pipe is provided with a grout stop plug, which can close the upper part of the grouting section. The main construction steps are as follows: the grouting hole is drilled by a rotary drill. All grouting holes in the rock stratum are required to be drilled by coring in order to find out the and distribution of rock stratum fractures. The coring rate shall reach ~ % in the rock stratum and % in the broken rock stratum. The drilling cleaning fluid is mainly clean water. If the rock is broken and the hole collapse is serious thin mud slurry can also be used as circulating fluid.Camillan,Diffa,Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.

comment list
©2009-2024Metal Microblog  Sitemap