Omaha12 meter electric elevatorApplication of air pressure test
release time:2024-04-18 04:26:20

Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed ohms; The power supply of the electric elevator can be cut off.During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed mm.Omaha,The downward movement of the hydraulic cylinder (i.e. heavy object lowering). The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder passes through the balance valve, hydraulic control one-way valve, energy-saving valve, and explosion-proof electric valveSteel wire ropes pulleys, and counterweight steel wire ropes shall comply with the following regulations: the characteristics of steel wire ropes shall comply with the requirements of General Purpose Steel Wire Ropes GB/T; Maintenance wear, deformation, and corrosion of steel wire ropesSmila,The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform, wide working platform, and high bearing capacity, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and saferMonthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be - millimeters higher than the bottom of the box. If the hydraulic oil becomes dark sticky, or has foreign objects such as gravel, it should be replaced in a timely manner ( # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, clean it with compressed air, and then return it to the oil tank and connect the pipeline.When a rigid mm square or circular flat surface is applied with a normal force of N to either side of the door, the door may not meet the above requirements, but safety should be maintained.


Omaha12 meter electric elevatorApplication of air pressure test



The foundation base or embedded parts should be fully embedded in the concrete foundation plate.The pressure joint between the pipe joint and the rubber hose fails prematurely, causing oil leakage or pipe explosion. The oil temperature rises due to frequent action of the overflow valve.In addition to ground protective fences, low level doors can be used. Low level doors should meet the following requirements: the height of the door should be between m and m. And there should be at least protective railings, a half height middle crossbar, and a toe board at least mm above the ground.Discount,During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed mm.Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications as specified in the above table.Stage equipment safety door. To prevent personnel from extending their heads, hands, and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed, its cabin should be full of doors,OmahaElectric chain elevator, and the height of the hoistway (hall door) should not be less than meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.


Omaha12 meter electric elevatorApplication of air pressure test



Speed limiter. To prevent the driving speed from exceeding the normal speed. A speedometer should be installed (not required for floors below or including the second floor), family dormitories, andquality,With the continuous improvement of urbanization level in China, the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, in order to meet the needs of the domestic market and the public,OmahaUsed electric elevator platform,OmahaElectric elevator for exterior wall decoration, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.Before installing the construction electric elevator, the foundation should be inspected and approved before installation.Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, and after changing the hydraulic oil, it must be automatically lifted and lowered to times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.Omaha,Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.Stage equipment safety door. To prevent personnel from extending their heads, hands, and feet out of the shaft and objects from falling into the vertical shaft. Its vertical position should be closed, its cabin should be full of doors, and the height of the hoistway (hall door) should not be less than meters; The electric door opening and closing switches should be removed from the vertical and passenger compartment doors. In order to prevent accidents caused by vertical, passenger car doors, and car roof doors not being closed.; Door interlocks should be installed on both the vertical and passenger compartment doors.Setting requirements: The wall bracket should use the manufacturer's matching standard products.


comment list
  • Energy-saving products

    Ask, can I send Omaha12 meter electric elevator specific specifications, let me call you guys.

  • Heng Vegetable Processing Company

    Can you give me a discount next time I buy it, Omaha12 meter electric elevator The quality is good, and I will live up to the boss

  • Tuohao Wire Mesh Products Co., Ltd.

    Omaha12 meter electric elevator Tell me a price, is there a detailed price for the parameter?

  • Fan Haimin

    Omaha12 meter electric elevatorHow much is it and how can I sell it?

  • chun jung trading co., ltd.

    One word! ! value! ! ! The service attitude is really good, Omaha12 meter electric elevator delivery is fast. The quality of the goods is also quite good. I like it so much, thank you.

  • Duobaiji E-Commerce Liability Company

    Your company Omaha12 meter electric elevator has a very good service attitude, thank you, and like you.

©2009-2024Metal Microblog  Sitemap