ShanghaiMobile hydraulic boarding bridgeHow to maintain good daily work
release time:2024-04-18 05:16:56

Tighten the manual valve to close it.Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.Shanghai,When conducting high-altitude operations on dangerous edges such as roofs, suspension bridges, slopes, or cliffs, guardrails or safety nets should be installed on the side facing the air, or safety belts or ropes should be used.The precautions during the use of hydraulic boarding bridges are hoped to be helpful to you.Mobaye,The safety valve of the mobile hydraulic boarding bridge can also generate high noise. When air is mixed into hydraulic oil, the relief valve gets stuck or severely worn, and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, we should regularly clean the safety valve, and replace it if it is damaged or severely worn.For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.During the excavation process of the foundation pit of the simple boarding bridge collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.


ShanghaiMobile hydraulic boarding bridgeHow to maintain good daily work



After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not working, the workbench should be lowered to a low position.Staying below high-altitude work sites is prohibited, and safety nets or other protective devices should be installed below the work site to avoid injury from falling objects.Nowadays, the electric hydraulic boarding bridge has become a loading and unloading tool used by many companies. Compared to many friends, I am still not very familiar with electric hydraulic boarding bridges. Below, the editor will explain the product parameters and specifications related to the length, slope, according to the characteristics of the workThe precautions during the use of hydraulic boarding bridges are hoped to be helpful to you.The user department of the hydraulic boarding bridge should scientifically analyze the equipment and reasonably determine the investment in the equipment. At the same time, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures, improve relevant management systems, monitor the status of key parts, and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories, establish a spare parts warehouse for vulnerable and commonly used parts, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers, strengthen the professional quality and professionalism of lifting platform maintenance personnel,ShanghaiContainer dedicated boarding bridge, so that they can handle faults in a short period of time.There is a lot of noise generated when using a mobile hydraulic boarding bridge. So, where are these noises caused? In fact, steel cylinders, and steel equipment are all sources of noise. Today we will analyze for you: . The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations. After hearing the noise from the hydraulic boarding bridge, motor first check if there are any problems with the hydraulic pump station, and fixing device, and if the noise is caused by its vibration.


ShanghaiMobile hydraulic boarding bridgeHow to maintain good daily work



The pressure on the axle will reduce the service life of the boarding axle.Welcome calls ,Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.Check the hydraulic oil quality and level. When the lifting platform is raised to a high position, the hydraulic oil level should be - millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged, it should be replaced immediately; When there is looseness in the connection part, tighten the pipe joint.Tighten the manual valve to close it.Shanghai,ShanghaiMobile hydraulic boarding bridge,conduct.Common&quo; Work” Steel structure planning can withstand uniform pressure, reduce skeleton torque, and be more robust than other channel structures.As an important part of the boarding bridge, the height can be adjusted according to the different vehicles of the goods, so that it can be level with the platform of the carriage for batch loading and unloading of goods. Due to the production of electric hydraulic boarding bridges by different manufacturers, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from mm to mm. The hydraulic lifting stroke height ranges from mm to mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is mm, which can be met by almost all freight vehicles (with a general vehicle height of ).


comment list
©2009-2024Metal Microblog  Sitemap