GleevecElectric pulley elevatorHow to install and operate reasonably
release time:2024-05-03 11:26:17

The bearing capacity of the ground under the concrete foundation plate should be greater than .Mpa.The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing,GleevecFolding electric elevator, its calculation sheet, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.Gleevec,The usual operation of landing and docking.Use floor doors and cage door devices on construction sites where conditions permit.Nguigmi,Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.Construction electric elevators outside the lightning protection rangeThe net height of the landing door opening should not be less than m, and the difference between the net width and the outlet width of the cage door should not exceed mm. When the floor door is closed, except for the gap between the lower part of the door that should not exceed mm, as well as the gap around the door or between parts, should comply with the provisions of Table of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB-.


GleevecElectric pulley elevatorHow to install and operate reasonably



In addition to ground protective fences, low level doors can be used. Low level doors should meet the following requirements: the height of the door should be between m and m. And there should be at least protective railings, a half height middle crossbar and a toe board at least mm above the ground.Electric elevators should be regularly maintained and cleaned. During maintenance and cleaning, the bracket should be supported to prevent the electric elevator from overturning. Electrical and hydraulic systems should be maintained by professional personnel; When the battery level display is less than %Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature dropsdemand,The pump body adopts an integrated pump station, all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.In addition to ground protective fences low level doors can be used. Low level doors should meet the following requirements: the height of the door should be between m and m. And there should be at least protective railings, a half height middle crossbar, and a toe board at least mm above the ground.


GleevecElectric pulley elevatorHow to install and operate reasonably



When the wall bracket adopts non matching standard products, design calculations should be carried out.Project scope,Gleevec500kg electric elevator,Double layer steel mesh: The diameter of the steel bars is mm, with a spacing of mm.Construction electric elevators should be equipped with lower limit switches that are sensitive and reliable.The hydraulic oil forms a certain pressure by the vane pump, and enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve, hydraulic control one-way valve, and balance valve, causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve,GleevecElectric boom elevator, and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge. The downward movement of the hydraulic cylinder (i.e. lowering of heavy objects).Gleevec,The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.Construction electric elevators outside the lightning protection range


comment list
  • computer system integration

    The packaging GleevecElectric pulley elevator looks very good, the packaging is very careful, I believe the goods must be very good, thank you! Good value, huh, come again next time.

  • Zuo Xinli

    It's worthy of praise, really good, GleevecElectric pulley elevator I like it very much.

  • Jia Bingxing

    Ask, can I send GleevecElectric pulley elevator specific specifications, let me call you guys.

©2009-2024Metal Microblog  Sitemap