FortalezaEmbedded boarding bridgeWhat are the sources of goods shipped to the market
release time:2024-04-20 08:37:44

Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, surface, and foot of the slope, especially for the simple boarding bridge.When replacing hydraulic oil sometimes poor hydraulic oil can also cause noise on the hydraulic boarding bridge,Regularly draining and refilling the oil tank to remove water and sediment is crucial for removing impurities in the oil, but regularly emptying the entire hydraulic system is also crucial. This is a reliable way to completely remove system impurities, oxidized hydraulic oil, the recommended clean hydraulic oil should be added back to the system. If the oil is completely contaminated, especially when the pump is damaged, the oil in the tank must be cleaned. The oil cleaning device allows the oil to flow until the oil pollution indicator shows that the oil is in a satisfactory state.For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.Al Arish,Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse, motor phase loss (motor not moving and buzzing), indicator light on, press the up button, motor rotates but lifting platform does not rise, lowering valve is open, overflow valve pressure is low, oil level is too low, oil pump is empty, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power,FortalezaMobile boarding axle hydraulic pressure, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at % rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.The slope of the electric hydraulic boarding bridge itself must have a certain slope to allow the forklift to enter the carriage for cargo loading and unloading. The length of the slope also varies from mm to mm, mainly considering safety and stability of use. For a long time, the manufacturer of the boarding axle has no turnover to avoid the price difference, which is % higher than the market value! More than one ton is more expensive!To ensure that the hydraulic boarding bridge is in good condition, it should be checked in advance before use, mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, press the up button, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected, so it is not a major problem.


FortalezaEmbedded boarding bridgeWhat are the sources of goods shipped to the market



Slowly reverse and park the container under the lip at the front of the boarding bridge.Advantages: Widely used high-altitude work equipment stable and safe, with a wide range of operations.Common&quo; Streamline” Open joint planning, with a welding area more than three times that of other traditional pipeline joints, greatly extending the service life and protection life.Where can I find it?,Slowly reverse and park the container under the lip at the front of the boarding bridge.There is a lot of noise generated when using a mobile hydraulic boarding bridge. So, where are these noises caused? In fact, pump stations, steel cylinders, and steel equipment are all sources of noise. Today we will analyze for you: . The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations. After hearing the noise from the hydraulic boarding bridge, first check if there are any problems with the hydraulic pump station, motor, and fixing device, and if the noise is caused by its vibration.As an important part of the boarding bridge, so that it can be level with the platform of the carriage for batch loading and unloading of goods. Due to the production of electric hydraulic boarding bridges by different manufacturers, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from mm to mm. The hydraulic lifting stroke height ranges from mm to mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is mm,FortalezaElevated boarding bridge,FortalezaFixed hydraulic boarding bridge, which can be met by almost all freight vehicles (with a general vehicle height of ).


FortalezaEmbedded boarding bridgeWhat are the sources of goods shipped to the market



During construction, the factors of loading and unloading operations were not taken into account. The platform type loading and unloading bridge serves as a remedial solution and can also meet the requirements for loading and unloading operations into truck carriages. The platform type boarding bridge is also designed in various structural forms according to different on-site conditions. It can also be adjusted up (below the cargo platform) or down (below the cargo platform) within a certain range, which can meet the installation and use of most loading and unloading platforms. Is the boarding bridge easy to use? The boarding bridge is an auxiliary equipment used to bridge with the freight car and is designed to solve the height difference between the freight car and the ground. Suitable for fixed or mobile loading and unloading of goods, it is actually equivalent to a slope, allowing forklifts to smoothly enter the carriage to load and unload goods, requiring only one person to quickly load and unload goods, which is labor-saving.quality index,The width of the boarding bridge also requires a certain width of its own. However, if the width is too small it is not conducive to forklift loading and unloading of goods. If the width is too large, it can occupy a certain space, which is not necessary. So a reasonable width is necessary, usually the width of the electric hydraulic boarding bridge is mm, mm, and mm. The width of the bridge is divided into internal width and total width. As we have already mentioned, the internal width is the width of the passage, and the total width mainly refers to the width of the guardrails on both sides plus the width of the passage. The total width can be ignored in use, but everyone still cares about the internal width, which is the width of the channel.Remove and disassemble the lowering valve, blow the valve core clean with compressed air, and then reinstall it.During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found construction must be suspended and reported to the superior for handling.Fortaleza, and there is basically no change to the building structure.The precautions during the use of hydraulic boarding bridges are hoped to be helpful to you.The hydraulic boarding bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goodsThe platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and is our good helper. However, malfunctions during use are inevitable. What should we do when encountering a malfunction?


comment list
©2009-2024Metal Microblog  Sitemap