RomaniaS13-50 / 10 power transformerAnalysis of Influencing Factors Based on Machining Precision
release time:2024-05-10 20:06:08

In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than .kg,RomaniaOutdoor dry-type transformer structure, and the oil sample for simplified experiment shall not be less than kg.Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.Romania,Oil sample inspection & mdash; & mdash; the performance parameters such as compression resistance and residue shall be carried out every three years. The long-term overload or overload of the transformer can reduce the cycle time.For no-load impulse closing of transformer, pay attention to the following matters:Seinajoki,Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined, appropriate surface treatment shall be carried out, and then Fushi blue raw materials shall be selected for sealing treatment.Oil immersed transformer operationFor the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.


RomaniaS13-50 / 10 power transformerAnalysis of Influencing Factors Based on Machining Precision



The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized, the electric flow will leak into the earth along the installed grounding wires,Romania800 oil immersed transformer, so as to achieve the purpose of safety otherwise it will have an adverse impact on life safety.The visual inspection method is that the staff use human eyes to observe the appearance change of the visible parts of the operating equipment to find the abnormal conditions of the equipment, such as discoloration, deformation, offset, cracking, loosening, ignition smoke, oil leakage, broken strand disconnection, short-circuit fault marks, hanging of dirty things, which can be inspected according to the visual inspection method. Therefore, visual inspection is one of the common methods of equipment inspection.Careless maintenance and insulation damageknowledge,Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.Wiring mode of dry-type transformer:


RomaniaS13-50 / 10 power transformerAnalysis of Influencing Factors Based on Machining Precision



Then clamp the branch pipe with your thumb, rotate and release the oil in the tube to clean the sampling tube carry out it twice,When the power transformer operates at full load it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.The insulation of the through core anchor bolt clamping the iron core is damaged, resulting in a short circuit fault between the silicon steel sheet of the iron core and the through core anchor bolt;The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and D (or D) is triangular wiring.Romania,RomaniaMain parameters of oil immersed transformer,In fact, ground wire is not only a kind of grounding protection. The following describes in detail that ground wire is the general name of grounding system. Ground wire is divided into protective grounding and safety factor grounding device. Among them, safety factor grounding device can be divided into grounding protection, anti electric shock grounding device and anti electromagnetic wave radiation grounding device. Protective grounding is to use it for loop to make the facilities achieve the grounding wire specified by the function.In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than .kg, and the oil sample for simplified experiment shall not be less than kg.With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, the accuracy of calculation conclusions can meet the needs of architectural design, and scientific and reasonable data method is selected, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage, but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.

comment list
  • Steel structure color steel plate sales

    The logistics of RomaniaS13-50 / 10 power transformer is a bit slow. Overall it's good, I hope I have a chance to cooperate next time

  • Yunheng Automobile Sales Service Company

    Can you give me RomaniaS13-50 / 10 power transformer detailed specification data?

  • Ruiteng Aluminum Co., Ltd.

    Brother, with your support, this new model RomaniaS13-50 / 10 power transformer is indeed up to standard and very good.

  • Pastry Sales

    I didn’t expect online shopping to be so interesting. Under the guidance of the seller, I finally learned online RomaniaS13-50 / 10 power transformer, thank you!

  • Hengmeitong Office Furniture Co., Ltd.

    Let me talk about the quality of the goods first: RomaniaS13-50 / 10 power transformer Overall it is good, and the packaging is tight. Let’s talk about business services: Like it. Last review express:

©2009-2024Metal Microblog  Sitemap