Advantages: It is connected with special hydraulic tongs,EssenAdvance small conduit support, does not require preparations outside the construction site, does not require any equipment, is simple to fix the grouting pipe to the reinforcement cage, and is not affected by the bad weather.Grouting parameters such as grouting pressure and reinforcement radius can be determined through field tests according to geological conditions and engineering requirements. Grouting holes are generally arranged in an equilateral triangle or rectangle on the plane. The reinforcement radius of collapsible loess is generally .-.m, and the reinforcement depth is generally -m. The advantage of silicification method is that the grout has strong permeability and can quickly terminate the deformation of the foundation; It is non-toxic,EssenExpanded shell hollow grouting anchor manufacturer, does not pollute the environment, and is cheap, so it is widely used.The grouting pipe without shaft roll packaging is tapped and paid off from the inner ring in the vertical state, and the drawn out pipe is spring shaped and automatically straightened. Takeout direction: the spiral direction of the spring shape after takeout is consistent with the twisting direction of, otherwise fried dough twist or disorder will occur. Welding is strictly prohibited during use, because the strength of the welding point is much lower than that of the steel itself, and it is easy to cause broken wires at the welding point during tensioning. When the grouting pipe adopts circular reinforcement arrangement, its bending radius shall not be less than times of the diameter.Professional is king,The bi-directional tensile plastic mesh false roof used in underground coal mine with mine grouting pipe is specially designed and manufactured for the false roof support of underground coal mining face and roadway wall support. It is made of several high molecular polymers and filled with other modifiers through heating, extrusion, molding, punching stretching, shaping, coiling and other processes. Compared with metal textile mesh and plastic woven mesh, it has light weight high strength, isotropy, and antistatic, It is a new type of mesh grouting pipe material for underground coal mine support engineering and civil engineering.Can the stretching speed of grouting pipe be defined? The wellhead clamp head is connected to the lower clamp head of the drive head. Some driving of grouting pipe.
The important reason for the stability of the grouting pipe reinforced soil subgrade is to further verify the main principle of the grouting pipe reinforced soil subgrade treatment technology. It is to place various types of grouting pipe products inside, on the surface of the soil mass or between the layers of soil mass. Relying on the tensile characteristics of the grouting pipe, the distribution of the internal stress field and displacement field of the reinforced soil mass is changed through the friction and embedment between the grouting pipe and the surrounding soil mass.resources,The glass fiber grouting pipe is a rigid product made of high-strength alkali free peeling fiber, which is made into a mesh base material through an internationally advanced fine knitting process and is surface coated. Unidirectional tensile plastic grouting pipe is a grouting pipe made of high-density polyethylene (HDPE) as raw material, plasticized and extruded plate, heated and stretched, extruded and pressed, and then punched with regular hole network, and then stretched longitudinally. In this process, the polymer is in a directional linear state and forms an oblong reticular integral structure with uniform distribution and high node strength. The tensile strength and rigidity of the grouting pipe are fully improved through the reorientation of the originally scattered chain molecules into a linear state by stretching.[] It is believed that it is undoubtedly one of the research directions of new grouting materials coordinated with the sustainable development of the times to develop high-performance and green grouting materials by effectively using large quantities of industrial wastes instead of pure cement clinker in China.Grouting pipe grouting mainly improves the bearing capacity of piles from these two aspects Grouting is carried out through the grouting pipe embedded in the pile body. The slurry integrates the soil and slurry around the pile body through penetration, so as to improve the physical and mechanical properties of the bearing layer of the pile body Especially for the ballast at the bottom of the pile, grouting can improve or eliminate the adverse effect of the ballast at the bottom of the pile on the end bearing capacity through the replacement, compaction and consolidation of the ballast by the slurry.II During the drilling process of the bored pile, there will be a certain gap between the pile retaining wall and the surrounding soil layer, which will lead to the decrease of the pile side friction and affect the bearing capacity of the pile When the grouting pipe is used at the pile end for grouting, the slurry will permeate, fill and compact along the side of the pile under the pressure so as to complete the replacement of the mud skin around the pile and the filling of the gap, such as greatly improving the pile side friction resistanceEssen,It is proved by experiments that the bearing capacity of the same bored pile with and without grouting pipe is separated by %. That is why more and more bored piles and grouting pipe grouting are used more and more widely in ChinaCan the piston rod of the grouting pipe be protected to avoid being bruised and accelerating leakage?In the construction of some grouting pipes, after the completion of the construction of the project, because some construction personnel did not take protective measures after the completion of the grouting pipes, the project was damaged due to some external factors. In order to help users effectively improve the construction quality of the grouting pipes, the following article introduces the protective measures that should be taken after the completion of the construction of the waterproof layer of the grouting pipes. For various engineering designs, waterproof and water stop shall be carried out throughout the whole process of grouting pipe until the backfilling soil is completed.
A good seller, even a novice, a lot of EssenGrouting flower tube don’t understand. Fortunately, the seller has patient guidance on the other end of the computer, and I have a sense of accomplishment,
When EssenGrouting flower tube offer discount points for activities, contact me when there are discounts
Follow you EssenGrouting flower tube for a long time, but this is the first time to start. It should be said to be pretty good. I bought it for the second time, and the shop is better than I expected.
EssenGrouting flower tube The quality is very good, I bought it for the second time, the goods are good, the boss is very good
EssenGrouting flower tube The quality at this price is excellent value for money