MonsPrice of 200 KVA box type transformerFactors that delay corrosion
release time:2023-05-11 23:33:04

For the leakage that has already occurred, find the leakage point first, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.Power transformer factoryMons,The insulation of the through core anchor bolt clamping the iron core is damaged, resulting in a short circuit fault between the silicon steel sheet of the iron core and the through core anchor bolt;Power transformer plantHoly Leu,Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, it should be insulated before putting into use, and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl,MonsBuried box transformer, the insulation resistance from the secondary side to the ground should be ^ mh, and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).


MonsPrice of 200 KVA box type transformerFactors that delay corrosion



The switching power supply lacks one phase of power;The transformer manufacturer shall not use hand touch method to detect energized high-voltage equipment, such as transformer in operation and neutral grounding equipment of arc suppression coil. For the equipment without power supply and whose shell is reliable grounding device, the temperature or temperature rise must be tested by hand. The secondary equipment can be inspected by hand touch method when it is hot and vibrated.If the above provisions are not met, the problem of dryness shall be solved. Generally, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular,MonsInstallation drawing of dry-type transformer, pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N shall be used to clean the dust in indoor space that is not easy to reach, such as ventilation duct, and there shall be no dirt.Respect for customers,In the case of dry-type transformer operation there is more noise, and some even cause noise which seriously endangers everyone's no problem rest time and work. At this time, the dry-type transformer needs sound insulation treatment. There are many processes and key methods to deal with the noise of the common dry-type transformer. How should the noise of the dry-type transformer be solved? Or with the dry-type transformer manufacturer's network editor to simply understand it.Avoid aging and damage of power transformer iron core insulation: aging of iron core insulation or damage of waterproof sleeve holding anchor bolt will cause large vortex of iron core, and long-term scalding of iron core will lead to insulation aging.Gradually, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform, is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, roads, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.


MonsPrice of 200 KVA box type transformerFactors that delay corrosion



(I) the distance between the external contour of kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer,MonsDifference between power transformer and dry-type transformer, and the distance shall not be less than m; At the angle with actual operation, a spacing of more than m shall be reserved; If metal fence is selected, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.Statistics,The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, but there are many calculation methods.Transformer inspection nose sniffing methodOil leakage of porcelain pot and laminated glass oil level gaugeMons,The power transformer conductor refers to the connecting transmission line between each electromagnetic coil, between the electromagnetic coil and the group outlet pipe, and between the electromagnetic coil and the tap changer.The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness, which is conducive to adjusting the data and has a unique and neat style.When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.

comment list
  • become a responsible company

    I have been shopping online MonsPrice of 200 KVA box type transformer for so many years, this is the first time I have taken this seriously. I am very satisfied with the product quality and workmanshi

  • Steel sales and bearing import and export business

    MonsPrice of 200 KVA box type transformer It was posted very quickly, really timely, please give me a thumbs up

  • Dr Che Motor Company

    It is still affordable to buy things online, MonsPrice of 200 KVA box type transformer I signed for two days late, but the things are really good, and the boss is good. The speed of transportation is

  • Wang Erjun

    Yes, MonsPrice of 200 KVA box type transformer good quality and great value for money

  • Wu Wensheng

    After my personal experience, the reputation of this store is quite good. MonsPrice of 200 KVA box type transformer The quality is more like a diamond. Thank you so much!

  • Niu Jiawang

    Your service is very good, MonsPrice of 200 KVA box type transformer is also very cheap! I will come often in the future!

©2009-2024Metal Microblog  Sitemap