LeipzigEl SalvadorThe weather is clear, the spot price weakens first and then rises
release time:2024-04-15 17:23:30

The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.Leipzig,When adding hydraulic oil, we can extend the oil cylinder to the high position for filling. When filling, the lifting platform should not exceed the high position, and then retract the oil cylinder back to the low position to check if the hydraulic oil level is lower than the low position, and maintain it between the two.With the continuous improvement of urbanization level in China, the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, in order to meet the needs of the domestic market and the public, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.LjungbyThe hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder returns to the oil tank through the balance valve, throttle valve, and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.Setting requirements: The installation and dismantling workers, electricians, and other operators of construction electric elevators should have special construction operations.


LeipzigEl SalvadorThe weather is clear, the spot price weakens first and then rises



High lifting height, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.Setting requirements: Steel wire rope electric elevators and reusable steel wire ropes should be equipped with anti loosening rope devices, which should have compliant loosening rope switches and be able to interrupt any movement of the cage until it passes through theSetting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.superior quality,The verticality of the guide rail frame should meet the requirements of the specifications.Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.Construction electric elevators outside the lightning protection range


LeipzigEl SalvadorThe weather is clear, the spot price weakens first and then rises



Model Example: Hanging Cage Specification: LABSC/TDx Type I: ~ Type II: ~ Type V: ~ Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x. (kN).Sincere service,The pump body adopts an integrated pump station,LeipzigDenver, all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.The stopper bearing of the mechanism is kept intact.When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above,LeipzigDrogheda,LeipzigXie Deze, effective protective measures should be taken.LeipzigThe entrance of each landing platform must be equipped with a landing door, and the door bolt must be set on the side next to the construction electric elevator.Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.Horizontal lead screw mechanical electricity


comment list
©2009-2024Metal Microblog  Sitemap