MessinaChangtanInspection work to be done before operation
release time:2024-04-20 14:38:32

Buffer. In order to increase the energy for the car to hit the top or sink to the bottom. Remove rubber or sponge from the buffer and cabin to increase their impact energy; Rope groove slipping and other accidents caused the car to suddenly fall, resulting in a safety clamp. To prevent breakage of the lifting wire rope. A safety clamp that can simultaneously cut off the power supply and stop the car from falling should be removed from the car. A car without safety tongs is not allowed to ride or carry people. If it is a simple electric elevator, there should be a safety device (such as a safety stop pin) to prevent people from suddenly falling when loading and unloading goods in the car; Electric elevators with three or more floors (including three floors) for passengers or passengers.Then the lifting platform platform platform that carries the load needs to be balanced,MessinaHeidelberg , and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.Messina,Safety devices: Electric elevators for construction should be equipped with overload detection devices. When the load inside the cage exceeds % of the rated load capacity, the overload detection device will give a warning signal inside the cage,The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.ordos city ,Horizontal lead screw mechanical electricityElectric elevators used in various places.Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.


MessinaChangtanInspection work to be done before operation



It is understood that the scissor type lifting platform is a widely used specialized equipment for high-altitude operations. Its shear fork mechanical structure provides high stability for the lifting platform, wide working platform, and high load-bearing capacity, making the range of high-altitude operations larger and suitable for multiple people working simultaneously. The lifting power is divided into V, V or V power supplies, diesel engines, using Italian and domestic hydraulic pump stations, and the table top is equipped with anti slip insulation buckle plates, which have anti slip, insulation and safety features. Please rest assured to use.Setting requirements: Construction electric elevators should be equipped with up travel (limit) switches.Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.Home page recommendation,The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.The motor of the hydraulic guide rail lifting platform is set around the wellbore,MessinaArlington, occupying a relatively small area, improving the utilization rate of the wellbore area.


MessinaChangtanInspection work to be done before operation



Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width,The net height of the landing door opening should not be less than m, and the difference between the net width and the outlet width of the cage door should not exceed mm. When the floor door is closed, except for the gap between the lower part of the door that should not exceed mm, the size of any through-hole and opening related to the distance between any door and adjacent moving parts, as well as the gap around the door or between parts, should comply with the provisions of Table of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB-.Attention should be paid to the occurrence of oil leakage on the aluminum alloy lifting platform to avoid secondary damage caused by a shortage of hydraulic oil. Overloading work is prohibited during useVertical lead screw electric lifting mechanism: Adopting a lead screw transmission method, and different steps can be formed within the travel range to meet the needs of meetings and performances; Pavilion Terrace, Tower, Pavilion; Ideal props.Messina,When the wall bracket cannot meet the requirements of the construction site,MessinaZawelch, it should be designed and calculated separately.To ensure safe and reliable braking of the lifting platform and prevent accidents, also known as a hydraulic lock, is added to ensure safe self-locking in the event of an accidental rupture of the hydraulic pipeline. An overload sound control alarm has been installed to distinguish between overload or equipment failure. Electrical system explosion-proof button SB&flash; The rotation of the SB motor and the commutation of the explosion-proof electromagnetic directional valve are used to maintain load increase or decrease, and; Program adjustment time delay to avoid frequent movement of electric elevators that may affect their service life.Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.


comment list
©2009-2024Metal Microblog  Sitemap