ZdunskavoraDouble column aluminum alloy lifting platformAnalysis of the reasons for the decline in production and sales
release time:2024-04-25 23:49:45

Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction, or has been completed,ZdunskavoraSemi-automatic high-altitude reclaimer, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.During the use of elevators, some elevator users seek temporary workers or unqualified companies for elevator maintenance in order to reduce costs and save funds. Once safety issues arise, even the responsible unit cannot be found. If the maintenance is carried out by elevator manufacturers or qualified professional companies, on the one hand, the maintenance technology and quality are guaranteed, and on the other hand, if any problems occur,ZdunskavoraDuplex villas stacked with household elevators, someone is also responsible.ZdunskavoraThese phenomena are not elevator malfunctions. When the elevator is fully loaded, the elevator does not stop: to avoid overloading, the elevator car no longer responds to the next station's outbound call.The effective support width of the upper and lower support beams should be greater than the width of the escalator truss, and there should be embedded steel plates.QiqiharThe household must make two steel splints above the entrance. The position and size of the clamp plate are determined based on the selected door machine model.Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, its area is: the area of the shared front room in residential buildings is greater than square meters, and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.


ZdunskavoraDouble column aluminum alloy lifting platformAnalysis of the reasons for the decline in production and sales



The requirement for the shaft is that it should not be plastered, which is beneficial for reducing noise, but there should be no protruding foreign objects.There are many similar situations in daily life, such as forcefully opening the door inside the car, causing the circuit to disconnect and forcing the elevator to stop, resulting in people being trapped. For example, if the elevator frequently enters and exits during decoration and falls into the crack of the door,ZdunskavoraHome elevator villa self built house, the elevator hall door may not be tightly closed, and after several consecutive doors are opened and closed, the elevator will stop. Professional quality assurance for home elevator manufacturers. Discount activities are underway, and new and old customers are welcome to come for consultationThe requirement for the shaft is that it should not be plastered, which is beneficial for reducing noise, but there should be no protruding foreign objects.safety requirements ,The door closing button has no self maintenance function. During the designated maintenance period, the elevator components in operation are inspected, refueled, dust is removed, and safety devices are debugged. Including non-destructive testing and maintenance of elevator traction steel wire ropes.The call button on each floor is no longer working, and the call is cut off.The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft, such as the size of the machine room, floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets, whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room the measuring personnel, with the cooperation of the technicians, the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).


ZdunskavoraDouble column aluminum alloy lifting platformAnalysis of the reasons for the decline in production and sales



Please note that there should be a space of over mm left on both sides of the escalator, and when arranged in parallel, there is no restriction between the two escalators.High quality brand,The requirement for the shaft is that it should not be plastered, which is beneficial for reducing noise, but there should be no protruding foreign objects.Elevators are used to transport firefighters, passengers, and fire-fighting equipment in the event of a fire. They are used to transport frozen goods in large cold storage or refrigeration workshops. However, they need to meet the requirements of sealing the door leaves and guide rails at the moving parts. Professional household elevators, villa household elevators, household elevator manufacturers, safe, reliable, and maintenance free performance, and their technical level has reached the domestic level, Meet the advanced level of international similar products and immersion requirementsThe beam edge distance is too small: The method of shortening the lower platform is to shorten the total length of the escalator, but note that the range of shortening is very limited, generally not exceeding mm. Generally, the platform cannot be shortened because it contains equipment such as cabinets and motors. Change the angle of the escalator from degrees to degreesZdunskavora, but there should be no protruding foreign objects.The front room of the fire elevator is equipped with indoor fire hydrants.In the event of a fire, when instructed by the fire center or the dedicated operation button of the first floor firefighter to enter the firefighting state, the elevator should immediately stop on the floor without opening the door, return to the first floor station, and automatically open the elevator door if it is in the upward direction.


comment list
  • Pinson Sports Facilities Engineering Company

    Feels of value for money, service attitude is very good, ZdunskavoraDouble column aluminum alloy lifting platform workmanship is very good, nothing fussy, all five points

  • Construction and installation of anti-glare panels

    Old acquaintances, things are as good as always, genuine ZdunskavoraDouble column aluminum alloy lifting platform, outstanding cost performance

  • chain hoist

    After looking for the ZdunskavoraDouble column aluminum alloy lifting platform from your family for a long time, I mustered up the courage and the quality of the inspection was very good.

©2009-2024Metal Microblog  Sitemap