SwarthLEGO Electric ElevatorSeveral common production schemes and their principles
release time:2024-04-26 13:38:04

Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.The foundation base or embedded parts should be fully embedded in the concrete foundation plate.Swarth,Correct use can also greatly improve work efficiency. So how should it be used?Installation and dismantling personnel and drivers should hold certificates to work.Bugojno,The function of the lifting platform in a theater is roughly as follows: the main lifting platform arranged in the main performance area of the stage is mainly used to quickly change the scenery. Typically, with&quo; Product; In the music and dance theater stage arranged in a zigzag pattern, the lifting platform, side car platform, and rear car turntable perform a rapid transformation of the entire or partial scene. This arrangement allows for rapid switching of three full sets.Use floor doors and cage door devices on construction sites where conditions permit.When the wall bracket adopts non matching standard products design calculations should be carried out.


SwarthLEGO Electric ElevatorSeveral common production schemes and their principles



The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.High altitude operations and maintenance in areas such as repair, logistics, electricity, transportation, petroleum,SwarthMobile, chemical,SwarthElectric pillar elevator, hotel, sports center, mining, also known as hydraulic liftingConstruction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.Analysis project,When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, and at this position, the hydraulic ground should be - millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner ( # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged,SwarthElectric elevator, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.


SwarthLEGO Electric ElevatorSeveral common production schemes and their principles



The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.Let's see,When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than mm and there is no effective protection from other structures the side protection device for the landing entrance should be equipped.Stop.The verticality of the guide rail frame should meet the requirements of the specifications.Swarth,Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).Installation verticality deviation guide rail frame erection height, h/mH≤ H& gt; verticality deviation/mm≤ (/h≤ ≤ ≤ ≤ pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (/) h.During loading and unloading

comment list
  • toda machinery co., ltd.

    The first time I found what I wanted SwarthLEGO Electric Elevator, I was in a good mood! Boss, come on, I hope to continue to make good products.

  • Lu Yongbin

    SwarthLEGO Electric Elevator The quality is very good, the transfer has been received, the boss is troubled, thank you very much!

  • Fermented soy products

    I'm busy, I forgot, I'm sorry, what else can I say~~ This SwarthLEGO Electric Elevator is really good, lucky enough.

  • Xindi Stone Carving Company

    After receiving the goods, I feel that the quality SwarthLEGO Electric Elevator is still relatively good, consistent with the seller’s description, very satisfied, the delivery speed is relatively fas

  • Pei Shijie

    SwarthLEGO Electric ElevatorYes, give you a good comment

  • Iron ore underground mining

    Let me evaluate this SwarthLEGO Electric Elevator, the price is good, the quality is good, the delivery is good, and the boss is good.

©2009-2024Metal Microblog  Sitemap