Villa NuvaAdvance small conduit in tunnel constructionPromote sewage treatment
release time:2023-03-25 04:28:43
Villa Nuva42 * 4 small conduit,

The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, the duct shall be wet and clean, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel, and the other is as a pipe for grouting at the bottom of the pile.Disposal method: the grouting pipe shall be shortened according to the specification.Villa Nuva,Advantages of grouting pipe grouting pipe is an embedded grouting pipe system,Villa NuvaAdvance small conduit in tunnel construction, which is used for permanent sealing of construction joints, cold joints, pipe seepage joints, it can be sealed by injecting slurry into the PVC port set on the surface. The proper grouting time can be selected after the concrete curing. Leakage joints can also be permanently sealed in this way. It is safe and does not need to be welded on site.Sancti-SpiritusThe glass fiber grouting pipe is a rigid product made of high-strength alkali free peeling fiber, which is made into a mesh base material through an internationally advanced fine knitting process and is surface coated. Unidirectional tensile plastic grouting pipe is a grouting pipe made of high-density polyethylene (HDPE) as raw material, plasticized and extruded plate, punched, extruded and pressed, and then punched with regular hole network, and then stretched longitudinally. In this process, the polymer is in a directional linear state and forms an oblong reticular integral structure with uniform distribution and high node strength. The tensile strength and rigidity of the grouting pipe are fully improved through the reorientation of the originally scattered chain molecules into a linear state by stretching.When the pipe cannot be connected due to serious blockage, the following treatment principles must be followed: when it is the first pile of a certain bridge, core drilling detection must be carried out; when it is not the first pile of a certain bridge, the construction unit shall apply for changing the detection method The low strain reflection wave method or high strain strain strain measurement method shall be used and signed by the supervisor&#;s representative and the person in charge of quality supervision before implementation; In case of pipe blockage of a bridge for many times, core drilling inspection shall be carried out in due time. Other uses of grouting pipe introduction the grouting pipe of pile foundation refers to the steel pipe that needs to be embedded when testing the quality of pile foundation. Generally, it is bound in the reinforcement cage and lowered into the hole together with the reinforcement cage before pouring concrete! There are many reasons for the grouting pipe to gamble on the pipe, most of which are due to the leakage of slurry caused by the pipe joint not being welded well during processing, and also due to the pipe mouth not being closed well and falling debris, the pipe is blocked! To put it bluntly, the pipe is blocked by sundries! The role of the grouting pipe is to inject clean water into the grouting pipe and put the transducer into the grouting pipe for testing when the integrity of the pile foundation is tested by ultrasonic wave. If the grouting pipe is blocked, the transducer can not be put in, or can not be placed at the bottom of the pile, so it is impossible to comprehensively test the whole pile and judge the quality of the pile foundation! Low cost, fast time, no loss, free from climate and place constraints.


Villa NuvaAdvance small conduit in tunnel constructionPromote sewage treatment



Grouting pipe grouting mainly improves the bearing capacity of piles from these two aspects Grouting is carried out through the grouting pipe embedded in the pile body. The slurry integrates the soil and slurry around the pile body through penetration, splitting and compaction so as to improve the physical and mechanical properties of the bearing layer of the pile body Especially for the ballast at the bottom of the pile, grouting can improve or eliminate the adverse effect of the ballast at the bottom of the pile on the end bearing capacity through the replacement, compaction and consolidation of the ballast by the slurry.II During the drilling process of the bored pile, there will be a certain gap between the pile retaining wall and the surrounding soil layer, which will lead to the decrease of the pile side friction and affect the bearing capacity of the pile When the grouting pipe is used at the pile end for grouting, the slurry will permeate, fill and compact along the side of the pile under the pressure, so as to complete the replacement of the mud skin around the pile and the filling of the gap, such as greatly improving the pile side friction resistance Push the rock powder and sundries that have not been washed, remain at the bottom of the hole, or stick to the hole wall beyond the grouting range so as to improve the bonding strength and impermeability of the slurry stone body and the fissure surface.The grouting pipe can be divided into unconstrained grouting pipe and constrained grouting pipe according to whether it can absorb the pressure thrust (blind plate force) generated by the medium pressure in the pipe; According to the displacement type of the grouting pipe, it can be divided into axial grouting pipe, transverse grouting pipe, angular grouting pipe and pressure balance grouting pipe. The grouting pipe cannot bear load and should be hoisted separately; In addition to the pre deformation required by the design for pre stretching or cold tightening, it is forbidden to adjust the installation deviation of the pipeline by deforming the grouting pipe; During installation, welding slag is not allowed to splash onto the surface of grouting pipe and suffer other mechanical damage; All movable components of the grouting pipe shall not be jammed by external components or restrict the normal operation of its movable parts. Most of the failure of the grouting pipe is caused by the external environment corrosion. Therefore, in the structural design of the grouting pipe, the contact between the external corrosion medium and the grouting pipe can be considered. For example, for the external pressure axial grouting pipe, a packing sealing device can be added between the outlet end ring and the outlet pipe, which is equivalent to the sleeve grouting pipe. It can not only resist the invasion of external corrosive media, but also add a safety barrier to the grouting pipe. Even if the grouting pipe is damaged, the grouting pipe can also play a compensation role and avoid the failure of the grouting pipe. The use of grouting pipes has been indispensable in modern building construction. In the s, grouting pipes were popularized in China, but they were fastener grouting pipes. In the s, China began to develop advanced grouting pipes with multiple s. With the continuous development of China&#;s construction industry in modern times the construction industry has become increasingly mature and perfect in China, and the bamboo wood grouting pipe has been eliminated by the market. Grouting pipe has become the mainstream form of grouting pipe and is more widely used in construction.Recommendation and consultation,The glass fiber grouting pipe has the characteristics of easy construction, high temperature resistance, corrosion resistance, low elongation, meeting the requirements of environmental protection no long-term creep, and has high tensile strength in the transverse and longitudinal directions. The strength to weight ratio of glass fiber is larger than that of steel, and the tensile strength can reach kn / m, which provides sufficient strength to prevent reflection cracks. When it breaks, its elongation is less than %, it has high deformation resistance and good compatibility with asphalt mixture. The grouting pipe is padded with the front lip of the horseshoe, and the height of the saddle shaped curved surface is changed to make the pipe wall crawl and slide along the accurate saddle shaped curved surface.The existence of grouting pipe mesh restricts the lateral movement of soil. The lateral sliding deformation of the soil is limited by friction and interlocking engagement between the grouting pipe and the sand particles and the passive resistance of the sand particles to the grouting pipe, forming a good interlocking effect, so that the soil has better overall shear strength and bending stiffness.


Villa NuvaAdvance small conduit in tunnel constructionPromote sewage treatment



There are many forms of grouting pipes that can be improved and applied. Although the engineering pipeline system is very complex, any complex pipe system can be divided into several relatively simple individual pipe sections through the setting of fixed pipe racks. When selecting the corrugated grouting pipe the deformation compensation of the pipe system can be determined according to these relatively simple pipe sections, so as to select the grouting pipe.Quality documents,In the engineering practice, some construction units directly pave the glass fiber grouting pipe after spraying the sticky layer oil, and the roller rolls after it. The effect is good, and the glass fiber grouting pipe is not easy to wave. Strictly control the entry and exit of vehicles transporting the mixture, and forbid vehicles to swerve, brake and dump the leftover mixture on the grouting pipe layer to prevent damage to the glass fiber grouting pipe; The back glue of glass fiber grouting pipe is easily soluble in water, which is easy to irritate human skin. Construction personnel must wear protective gloves; When the grouting pipe is laid, the temperature of the road surface is required to be between . Therefore, the relative displacement trend or relative displacement will occur between the narrow two, which will then generate friction. This friction is generally called 'surface friction'.It is required to ensure that at least one embedded reinforcement is firmly welded with the anchor ring of maolehan grouting pipe within every meter along the joint direction. The quality of XF type grouting pipe should be carefully checked. If deformation or inconsistent spacing between two steel beams is found, it should be repaired. If necessary, the steel beam spacing of maolehan grouting pipe shall also be adjusted according to the ambient temperature during installation. XF type grouting pipe device shall be slowly put into the groove, so that the center line of the joint coincides with the center line of the actual reserved joint, and the deviation shall not exceed mm. Meanwhile, the inner edge of the steel side beam shall be kept vertical. After the XF grouting pipe is in place, the top surface of the steel beam of the grouting pipe shall be adjusted according to the longitudinal, transverse slope and elevation to be -mm lower than the adjacent asphalt concrete pavement and shall not exceed the pavement elevation. The small editor of the grouting pipe reminds everyone that there should be no rust, water and other impurities when using the prestressed machinery. The working clip can be used after removing the foam in the packing box,Villa NuvaGrouting anchor, and the grouting pipe should be properly kept. However, when the prestressed tendon is long and the grouting pipe needs to be tensioned repeatedly, it is suggested that a small amount of lubricant (e.g. anchor pulling spirit) be applied to the tapered hole of the anchor plate by the prestressed machine, which is not only conducive to the follow-up and anchor pulling of the working clip, but also conducive to the multiple grouting of the grouting pipe; Apply lubricant on the outer surface of the tool clip and the inner and outer surfaces of the taper hole of the anchor plate before use, and regularly remove the debris on the clip surface to make the anchor flexible. However, when the clip is cracked or the tooth surface is damaged, it needs to be replaced and can not be used again.Villa Nuva,The existence of grouting pipe mesh restricts the lateral movement of soil. The lateral sliding deformation of the soil is limited by friction and interlocking engagement between the grouting pipe and the sand particles and the passive resistance of the sand particles to the grouting pipe, forming a good interlocking effect, so that the soil has better overall shear strength and bending stiffness. The length can be matched according to the construction requirements, without loss.It is necessary to comprehensively consider the selection and configuration of grouting pipes, because there are many types of expansion joints, and correct selection is very important. Only in this way can the design of the piping system be safe, reasonable

comment list
  • Xinjia Weichuang Furniture Co., Ltd.

    After my personal experience, the reputation of this store is quite good. Villa NuvaAdvance small conduit in tunnel construction The quality is more like a diamond. Thank you so much!

  • own house

    I'm busy, I forgot, I'm sorry, what else can I say~~ This Villa NuvaAdvance small conduit in tunnel construction is really good, lucky enough.

  • Shearer Accessories

    The level of the seller MM is very high, and the people are very patient. I saw a lot of Villa NuvaAdvance small conduit in tunnel construction, but I feel that you have the strength and bought yours.

  • Bamboo Speed ​​Cable Company

    Villa NuvaAdvance small conduit in tunnel construction The quality is not bad, and the goods are delivered in time. I recommend you to buy it next time.

  • tianju sports equipment co., ltd.

    I will buy it in the future Villa NuvaAdvance small conduit in tunnel construction and I will come to you again. Thank you boss and send a good comment. I love you boss. Thank you!

©2009-2024Metal Microblog  Sitemap