VareseVoltage transformerCultivate industry scientific literacy
release time:2024-04-19 11:14:30

Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety,Varese110kV transformer, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; ” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.Varese,Principle of step-up dry-type transformer: the step-up dry-type transformer is a component that correspondingly converts low communication AC voltage, large current flow and small characteristic impedance into high communication AC voltage,VareseHigh voltage bushing of oil immersed transformer, small current and large characteristic impedance. When there is an AC circuit in the original coil, the communication AC magnetic flux will be caused in the transformer core (or magnetic core), causing the magnetic induction voltage in the primary coil (or current).Deterioration damage of transformer core insulationPingdingshan, generally, the sealing of box edge and machine cover is sealed with acid-base resistant rubber rod or rubber plate. If the joint is not solved well, it will lead to common faults of oil leakage.For the installation of lightning rod, it is very easy to damage the relay protection inside and outside of dry-type transformer by lightning. If it is a serious situation, it is very easy to cause fire accidents, power failure, damage to machinery and equipment, etc.


VareseVoltage transformerCultivate industry scientific literacy



When the whole process of winding wave of oil immersed transformer is calculated by using the marking method, the winding of oil immersed transformer is generally divided into multiple modules, and its power circuit includes an inductance and vertical capacitance, a capacitance to ground or capacitance between windings, They also have mutual inductors between the inductors of each module, and collect the chain Internet as the equivalent power circuit of oil immersed transformer. The precision of the conclusion can completely meet the needs of practical projects.The transformer manufacturer shall not use hand touch method to detect energized high-voltage equipment, such as transformer in operation and neutral grounding equipment of arc suppression coil. For the equipment without power supply and whose shell is reliable grounding device the temperature or temperature rise must be tested by hand. The secondary equipment can be inspected by hand touch method when it is hot and vibrated.The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, which is resistant to corrosion and rust, and has sound insulation and noise reduction.supply,VareseOil immersed regulator manufacturer,If you want to check the activated carbon fiber for the hanging cover, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.Difference between dry-type transformer and oil immersed transformer:Some are tied with plastic tape, and some immediately press the two edges together, and there is still oil leakage without sealing effect.


VareseVoltage transformerCultivate industry scientific literacy



How much is the power transformerofferBefore no-load impact closing, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.How is the quality level of dry-type transformer compared with foreign countries?The project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.Varese,Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by V megger, the resistance value exceeds m ohm bus.Connection group structure of dry-type transformer

comment list
  • Manufacture and sale of drain pipes

    Follow you VareseVoltage transformer for a long time, but this is the first time to start. It should be said to be pretty good. I bought it for the second time, and the shop is better than I expected.

  • Jinghai Wire Mesh Products Co., Ltd.

    VareseVoltage transformerThe quality is good, completely beyond expectations, and the delivery speed is very fast.

  • Siwei Liability Company

    The boss is so kind, he really knows his job well. Under your guidance, I will soon become an expert! The seller's service is really attentive. Bring colleagues together in the future. Very good Vares

  • Aoya Electronic Technology Co., Ltd.

    It is still affordable to buy things online, VareseVoltage transformer I signed for two days late, but the things are really good, and the boss is good. The speed of transportation is also very fast.

  • Dust removal equipment and accessories design

    The festival is coming soon, can VareseVoltage transformer be discounted?

©2009-2024Metal Microblog  Sitemap