Fort WayneBergen operation zoomThe practical effect is great
release time:2024-04-29 20:57:34

Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.The verticality of the guide rail frame should meet the requirements of the specifications.Fort Wayne,Stop.The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.Fanipol,Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, and after changing the hydraulic oil it must be automatically lifted and lowered to times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.


Fort WayneBergen operation zoomThe practical effect is great



Horizontal lead screw mechanical electricityWhen using lifting equipment, the workbench should be kept in a horizontal state.Later,Fort WayneIsirimurino, when there is a major malfunction of the lifting platform, it should be repaired by professional personnel as soon as possible. After the malfunction occurs, personnel and property losses.Sampling inspection,Setting requirements: The landing door should be standardized and tooled.The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements,Fort WayneHuairen, otherwise protective measures shall be taken.


Fort WayneBergen operation zoomThe practical effect is great



Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results, and report any problems found to the user unit.total cost,Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature dropsIt is strictly prohibited to use travel limit switches as switches to stop operation.The bearing capacity of the ground under the concrete foundation plate should be greater than .Mpa.Fort Wayne,Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened,Fort WayneLamezia Terme, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.The hydraulic oil forms a certain pressure by the vane pump, and enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve, hydraulic control one-way valve, and balance valve causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve, and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge. The downward movement of the hydraulic cylinder (i.e. lowering of heavy objects).The scaffolding of the parking platform should be laid tightly and firmly.


comment list
  • aquatic products

    Fort WayneBergen operation zoom Give me a discount next time, I wish you a lot of money

  • Tian Yuhong

    Every time I receive the goods is very pleasant, but as long as I think of evaluating it, my head is big. Fortunately, a omnipotent friend recommended your home Fort WayneBergen operation zoom, the pr

  • Development of Electronic Information Technology

    Fort WayneBergen operation zoomHow much is the best price, and I will give you a comment, can Fort WayneBergen operation zoom be cheaper?

  • Li Tiezhu

    The boss is so kind, he really knows his job well. Under your guidance, I will soon become an expert! The seller's service is really attentive. Bring colleagues together in the future. Very good Fort

  • kyung traffic safety facility co., ltd.

    When Fort WayneBergen operation zoom offer discount points for activities, contact me when there are discounts

©2009-2024Metal Microblog  Sitemap