Implementing multiple shifts of homework should fill in and submit records according to regulations.To meet the needs of choreographers and choreographers in different plays, different heights of the lifting platform can be used to change the shape of the stage according to the requirements of the choreographers and choreographers, in order to adapt to the requirements of the plot for the scenery or venue, and save manpower and material resources for setting up. By using the tilting device of the lifting platform to form a tilted platform, a better highlighting effect can be achieved in various performances. According to the needs of the plot, special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities, creating unexpected atmosphere and effects according to the needs of the plot. For example, using the low-speed descent of the lifting platform to represent a sunken ship in the sea, using the valves on the lifting platform and the sudden disappearance and appearance of actors on the lifting platform.Belo Horizonte, as specified in the above table.Surcin,The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than m. In special circumstances, when the net height of the building entrance is less than m, it is allowed to lower the height of the lower door opening, but in any case the net height of the lower door opening is not less than m. (Article of GB-)Setting requirements: The wall bracket should use the manufacturer's matching standard products.
During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed mm.The top of the hanging cage is accessible; d) During installation/disassembly/maintenance/inspection of the device; e) Inside the hanging cage.Human improper operation is the main factor causing malfunctions in scissor type electric elevators. When stacking goods, electric elevators should stack the goods neatly, which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually, during the operation of the electric elevator, it may cause the electric elevator to lose balance. After the goods are stacked completely, ropes should be used to lock the goods so that they are not afraid of the goods during the lifting process; Careless; Scattered downWork courses,Speed limit wire rope switch. When the speed limit wire rope trips or breaks. Make the electric elevator unable to start.Human improper operation is the main factor causing malfunctions in scissor type electric elevators. When stacking goods, electric elevators should stack the goods neatly, which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually, during the operation of the electric elevator, it may cause the electric elevator to lose balance. After the goods are stacked completely, ropes should be used to lock the goods so that they are not afraid of the goods during the lifting process; Careless; Scattered downSafety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires,Belo HorizonteElevator platform electric, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed ohms; The power supply of the electric elevator can be cut off.
Acceptance: Concrete strength grade C,Flat screw mechanical electric lifting mechanism: The lifting platform of this structure has the advantages of small civil engineering coordination, large stroke, stable operation, low noise, accurate positioning,Belo HorizonteHand push electric elevator, and low cost. Adopting a horizontal screw drive and a scissor fork structure to achieve the lifting motion of the table, it can be stopped arbitrarily within the range of travel.Safety devices: Electric elevators for construction should be equipped with overload detection devices. When the load inside the cage exceeds % of the rated load capacity, the overload detection device will give a warning signal inside the cage,Horizontal lead screw mechanical electricityBelo Horizonte,Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.Implementing multiple shifts of homework should fill in and submit records according to regulations.The counterweight guide rail should meet the specification requirements.
When Belo HorizonteElectric lifting platform 2 meters offer discount points for activities, contact me when there are discounts
After receiving the goods, I feel that the quality Belo HorizonteElectric lifting platform 2 meters is still relatively good, consistent with the seller’s description, very satisfied, the delivery spe
Your service is very good, Belo HorizonteElectric lifting platform 2 meters is also very cheap! I will come often in the future!
Buying things online is about integrity, and you do it! Thank you Belo HorizonteElectric lifting platform 2 meters Like one Fast delivery, very good attitude, very satisfied! very good!
To live up to the boss's expectations of me, I will definitely write down my own evaluation objectively, fairly and truthfully, Belo HorizonteElectric lifting platform 2 meters is indeed very good, th
I finally waited until I bought it Belo HorizonteElectric lifting platform 2 meters. At first, I was still wondering whether to buy it. I liked it a little bit. I was a little scared to read the comme