BourgeVenray Precautions for protective construction
release time:2024-04-19 11:37:43

Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.Bourge,Unloading platform and attached electric construction platform, etc.When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.AsosaThe bearing capacity of the ground under the concrete foundation plate should be greater than .Mpa.The entrance of each landing platform must be equipped with a landing door, and the door bolt must be set on the side next to the construction electric elevator.News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years, and various new technologies and materials have emerged, making the further development of lifting platform vehicles possible.


BourgeVenray Precautions for protective construction



Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be - millimeters higher than the bottom of the box. If the hydraulic oil becomes dark sticky, or has foreign objects such as gravel,BourgeMayday, it should be replaced in a timely manner ( # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform,BourgeMalapi, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.The isolation and buffering rubber in various parts of the aluminum alloy electric elevator drive device are intact and tightly fitted.The quality of the standard section should comply with the product manual and specification requirements.Executive standard,To meet the needs of choreographers and choreographers in different plays, in order to adapt to the requirements of the plot for the scenery or venue, and save manpower and material resources for setting up. By using the tilting device of the lifting platform to form a tilted platform, a better highlighting effect can be achieved in various performances. According to the needs of the plot, special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities, creating unexpected atmosphere and effects according to the needs of the plot. For example, using the low-speed descent of the lifting platform to represent a sunken ship in the sea using the valves on the lifting platform and the sudden disappearance and appearance of actors on the lifting platform.Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.Principle of electric elevator rotary valve: When the electric elevator rises, the rotary valve will automatically open. To close the plug valve, and then turn the transmission handwheel to lower the plug and achieve sealing.


BourgeVenray Precautions for protective construction



Work is essential, and the main protective accessories include safety belts, guardrails, protective covers,BourgeGiorgio Calabria, platforms and stairs, etc.Equipment maintenance,When the wall bracket adopts non matching standard products, design calculations should be carried out.How to determine the sufficient amount of clean oil for the hydraulic station of an electric elevator? Why cannot water be used to flush the hydraulic station of an electric elevator?For customers to use and operate the lifting platform for a long time, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.Bourge,To meet the needs of choreographers and choreographers in different plays, different heights of the lifting platform can be used to change the shape of the stage according to the requirements of the choreographers and choreographers, in order to adapt to the requirements of the plot for the scenery or venue, and save manpower and material resources for setting up. By using the tilting device of the lifting platform to form a tilted platform, a better highlighting effect can be achieved in various performances. According to the needs of the plot, special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities, creating unexpected atmosphere and effects according to the needs of the plot. For example, using the low-speed descent of the lifting platform to represent a sunken ship in the sea, using the valves on the lifting platform and the sudden disappearance and appearance of actors on the lifting platform.Installation verticality deviation guide rail frame erection height, h/mH≤ H& gt; verticality deviation/mm≤ (/h≤ ≤ ≤ ≤ pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (/) h.Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.


comment list
  • Fengda Dingye Technology Co., Ltd.

    The first online purchase BourgeVenray . I use my personal experience to tell everyone that your service attitude is very good. The quality of the goods is also very good. I like you!

  • Xindatong Information Technology Co., Ltd.

    Feels of value for money, service attitude is very good, BourgeVenray workmanship is very good, nothing fussy, all five points

  • laying hens

    The packaging BourgeVenray looks very good, the packaging is very careful, I believe the goods must be very good, thank you! Good value, huh, come again next time.

  • Shuipan Energy Saving Technology Co., Ltd.

    Since the last time I bought your BourgeVenray , this new model has indeed met the standard and is very good, giving you a good comment.

©2009-2024Metal Microblog  Sitemap