Chula VistaAvery on the Seine RiverDiversification of functions
release time:2024-04-20 17:49:29
Chula VistaChinstohova,

Steel wire ropes, pulleys, and counterweight steel wire ropes shall comply with the following regulations: the characteristics of steel wire ropes shall comply with the requirements of General Purpose Steel Wire Ropes GB/T; Maintenance,Chula VistaHodmezova Sahli, deformation, and corrosion of steel wire ropesDrivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.Chula Vista,.Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.Falesti,The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.Small safe operation distance: Circuit voltage (kV) of external power lines<~~~ Small safe operation distance (m) Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.Low power consumption: When the hydraulic guide rail lifting platform descends, it is driven by the pressure generated by its own weight, greatly saving energy and reducing consumption.


Chula VistaAvery on the Seine RiverDiversification of functions



The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than m. In special circumstances, when the net height of the building entrance is less than m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than m. (Article of GB-)Construction electric elevators should be equipped with upper limit switches that are sensitive and reliable.The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side and the door bolt must be set on the side next to the construction electric elevator.reform,Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance, the protective measures taken should comply with the specification requirements.Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, it is advisable to place the screw at the bottom and the nut at the top.Installation verticality deviation guide rail frame erection height, h/mH≤ H& gt; verticality deviation/mm≤ (/h≤ ≤ ≤ ≤ pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (/) h.


Chula VistaAvery on the Seine RiverDiversification of functions



The landing door should meet the requirements of the specifications and achieve standardization.Total quality assurance,Horizontal lead screw mechanical electricityThe upward movement of the hydraulic cylinder involves lifting heavy objects, and the return oil from the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve. The additional pressure relief valve is used for adjustment, and the pressure gauge reads the value when observing the pressure gaugeSetting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.Chula Vista,When a rigid mm square or circular flat surface is applied with a normal force of N to either side of the door, the door may not meet the above requirements, but safety should be maintained.Chain type electric lifting mechanism: With a good guiding mechanism, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.


comment list
  • Aoteli Building Materials Technology Co., Ltd.

    I bought a lot of you Chula VistaAvery on the Seine River and I am very satisfied. Very good seller, I will come often.

  • Jia Xinyan

    The quality is very good, really good, Chula VistaAvery on the Seine River the same as the picture, the packaging and quality are also very good,

  • Yu Zhongjun

    I think it’s pretty good. When I bought it, I saw the comments in the comments and I bought it. When I saw the shipment, I was very excited. After Chula VistaAvery on the Seine River arrived, I was ex

  • ronggui trading co.

    Can you give me a discount next time I buy it, Chula VistaAvery on the Seine River The quality is good, and I will live up to the boss

  • Combustible gas leak detector

    Chula VistaAvery on the Seine River It’s good, the price is right, friends also say it’s good, it’s worth it

  • Ding Kai E-Commerce Company

    Feels of value for money, service attitude is very good, Chula VistaAvery on the Seine River workmanship is very good, nothing fussy, all five points

©2009-2024Metal Microblog  Sitemap