GutaSelf propelled electric elevatorChanges in the status quo of the industry
release time:2023-05-11 12:14:19

Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process,GutaElectric elevator mechanism, and at this position, the hydraulic ground should be - millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel,GutaElectric hydraulic folding elevator, it should be replaced in a timely manner ( # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.Guta, vehicle mounted lifting platform, diesel engine curved arm self-propelled lifting platform, cylinder sleeve lifting platform, aluminum alloy lifting platform, and specialThe full height landing door should meet the following requirements: the net height of the landing door opening should not be less than m. In special circumstances, when the net height of the building entrance is less than m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than m. (Article of GB-)El Fahs,During normal operation, the horizontal distance between the closed cage door and the closed landing door should not exceed mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed mm.Low level doors should be equipped with interlocking devices that can verify their closed and locked positions. The action of this interlocking device should be at the entrance of the cage. Simple use should not interfere with the operation of the interlocking device. The attached wall bracket should use matching standard products. When the wall bracket cannot meet the requirements of the construction site, it should be designed separately. The design of the wall bracket should meet the requirements of component stiffness, strength, stability etc., when the net height of the building entrance is less than m and the production should meet the design requirements.The counterweight guide rail should meet the specification requirements.


GutaSelf propelled electric elevatorChanges in the status quo of the industry



Setting requirements: The wall bracket should use the manufacturer's matching standard products.And prevent it from starting normally. There should be no device that allows users to cancel warning signals.The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than m. In special circumstances, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than m. (Article of GB-)Good quality,During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.Implementing multiple shifts of homework should fill in and submit records according to regulations.The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform, wide working platform, and high bearing capacity, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer


GutaSelf propelled electric elevatorChanges in the status quo of the industry



Installation and dismantling personnel and drivers should hold certificates to work.How much does it cost?,The function of the lifting platform in a theater is roughly as follows: the main lifting platform arranged in the main performance area of the stage is mainly used to quickly change the scenery. Typically with&quo; Product; In the music and dance theater stage arranged in a zigzag pattern, the lifting platform, side car platform,Guta22ov electric elevator, and rear car turntable perform a rapid transformation of the entire or partial scene. This arrangement allows for rapid switching of three full sets.Setting requirements: Construction electric elevators should be equipped with up travel (limit) switches.Spiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only -mm and a travel distance of up to m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.Guta,The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.The advantages and disadvantages of several commonly used electric lifting mechanisms are as follows: hydraulic electric lifting mechanisms: using hydraulic technology, smooth lifting and low noise.The scaffolding of the parking platform should be laid tightly and firmly.


comment list
  • Liu Naiyu

    Brother, with your support, this new model GutaSelf propelled electric elevator is indeed up to standard and very good.

  • Technological development of the company's process technology

    The first time I found what I wanted GutaSelf propelled electric elevator, I was in a good mood! Boss, come on, I hope to continue to make good products.

  • Shang Trading Company

    GutaSelf propelled electric elevator Very good, good quality and low price, express delivery is also fast, and inspection is also very standard.

  • Jifa Network Technology Co., Ltd.

    The logistics is very fast, look forward to working together again

  • Blue Bee Information Technology Corporation

    Can you give me a discount next time I buy it, GutaSelf propelled electric elevator The quality is good, and I will live up to the boss

  • victorious manufacturing co., ltd.

    I have almost never seriously evaluated it before. I bought yours GutaSelf propelled electric elevator and will visit it next time. It is so convenient that I can’t stop at all. It’s a genuine product

©2009-2024Metal Microblog  Sitemap