salmon45 large diameter seamless pipeAdvance preparation before motivation
release time:2024-04-26 07:06:54

Key technical characteristics of alloy pipe:→ compared with general section steel, it has the advantages of low cost, high precision and small residual stress. It does not need expensive welding materials and weld detection, and saves about % of the manufacturing cost of steel structure.salmon, The reinforcement on both sides of the inverted beam extends into the beam respectively, and the anchorage length of the reinforcement is the same as that of the reinforcement, without hook.The shape of small longitudinal crack on the surface of alloy pipe is less than mm The overall width is less than mm The depth is lower than .mm.Mulheim,C-section steel has uniform zinc layer, smooth surface strong adhesion, no zinc scar,salmon15CrMo alloy pipe factory, no zinc leakage and high dimensional accuracy. All surfaces are wrapped by zinc layer, and the zinc content on the surface is usually -g /? It has long service life, corrosion resistance and durability. It is a kind of stronger protection.I-beam is widely usedKey technical characteristics of alloy pipe


salmon45 large diameter seamless pipeAdvance preparation before motivation



Application scope of alloy pipeSpiral welded pipe: it is made by rolling low-carbon structural steel or low-alloy structural steel strip into pipe blank according to the viewpoint of certain spiral line (called forming angle), and then welding the pipe seam. It can produce large-diameter steel pipe with narrow strip steel. Spiral welded pipe is mainly used for oil and natural gas transportation pipeline, and its standard is expressed by outer diameter * wall thickness. Spiral welded pipe has single-sided welding and double-sided welding. The welded pipe shall ensure that the hydrostatic test, tensile strength and cold bending of the weld meet the requirements.After determining the reasonable pickling agent and polishing solution, it is very easy to carry out hot galvanizing for relevant alloy pipes. Use 'phosphating treatment' to degrease the pipes of electrolytic machine equipment, put them into the aqueous solution with zinc salt after pickling and passivation, connect the negative level of electrolytic machine equipment, put them into the cold-rolled steel plate in the direction corresponding to the pipes, and connect the switching power supply, If the current flows from the positive stage to the negative stage, a layer of zinc is deposited in the pipe.Where is good, The defects can be removed by grinding with sand wheel, but the remaining wall thickness must be within the allowable standard. Peak crackAlloy pipes can be used for heating (cooling) projects.


salmon45 large diameter seamless pipeAdvance preparation before motivation



Last week,salmon27SiMn large diameter seamless pipe, the billet in North China market showed a slight rebound trend. The billet quotation in Tangshan the leading city, rose first and then stabilized in four trading days, Tangshan billet fell by yuan during the Dragon Boat Festival holiday. On the first day after the festival, although the phase snail is still running at a low level, due to the small billet resources in the market, the steel mills unexpectedly rose, and the billet market rebounded. However, due to the continuous increase of capital pressure and the downturn in the transaction of downstream finished materials, the steel plant has always maintained a cautious wait-and-see attitude to maintain stability.Which one is better, but the section size cannot resist torsion because the wing plate is too narrow. On the contrary, H steel has its own advantages and disadvantages. Seismic and cracking performance the longitudinal and transverse bars of the welded reinforcement mesh form a network structure, so it has good bonding and anchorage with the concrete, which obviously shows the seismic cracking performance of the reinforced concrete structure. According to the actual test, the welded reinforcement mesh laid on the road can reduce the occurrence of cracks than the manual binding mesh. It greatly reduces the unnecessary cost generated manually in the construction and shortens the construction period. The use of reinforcement mesh is simple and convenient and the reinforcement mesh is convenient for transportation.Welded steel pipes need to be processed through various processes before application. The heat treatment of welded steel pipes is a very important link in the processing of welded steel pipes. Hot working is a metal hot working process in which metal materials are heated, insulated and cooled in a certain medium, and their metal properties are controlled by changing the metallographic structure on the surface or inside of the material. During the heating and cooling process of structural welded steel pipe workpiece, due to the inconsistency of cooling speed and time between the surface and the core, the temperature difference will be formed,salmon65. How many kilograms per meter of welded pipe, which will lead to uneven volume expansion and contraction and produce stress, that is, thermal stress.salmon,The import and export order of I-beam is generally based on the specifications required in use after determining the corresponding carbon structure steel (or low alloy steel) steel grade. Except for the specification number, I-beam has no specific composition and performance series. Peak crackThe production process can be summarized as follows: pre leveling → finishing → straightening → post leveling. Flat steel / A / B steel with width of -, thickness of -, rectangular section and slightly pure edge. Flat steel can be finished steel, or it can be used as blank for welded pipe and thin slab for laminated thin plate.

comment list
©2009-2024Metal Microblog  Sitemap